CONSTRUCTION AND OPERATION OF FACILITIES Sample Clauses

CONSTRUCTION AND OPERATION OF FACILITIES. 57 3.1 AE may open and cut streets, curbs, and sidewalks; bore; or use any other methods it 58 deems reasonably necessary to construct, maintain, and operate AE facilities within the 59 City. The design and construction of AE Facilities and AE’s access to and restoration of 60 paved surfaces shall be in accordance with AE’s design standards and criteria, as 61 amended by AE from time to time. 62
AutoNDA by SimpleDocs
CONSTRUCTION AND OPERATION OF FACILITIES. Owner shall fully insure for the benefit of Owner and B&R and any subcontractor of B&R engaged in the performance of B&R's services, or shall arrange for one or more of the participants engaged in the construction of the project to fully insure:

Related to CONSTRUCTION AND OPERATION OF FACILITIES

  • Condition of Facilities (i) Use of the Real Property of Purchaser for the various purposes for which it is presently being used is permitted as of right under all Applicable Laws related to zoning and is not subject to “permitted nonconforming” use or structure classifications. All Improvements are in compliance with all Applicable Laws, including those pertaining to zoning, building and the disabled, are in good repair and in good condition, ordinary wear and tear excepted, and are free from latent and patent defects. To the Knowledge of Purchaser, no part of any Improvement encroaches on any real property not included in the Real Property of Purchaser, and there are no buildings, structures, fixtures or other Improvements primarily situated on adjoining property which encroach on any part of the Land.

  • Maintenance of Facilities 5.1 The Network Customer shall maintain its facilities necessary to reliably receive capacity and energy from the Host Transmission Owner’s transmission system consistent with Good Utility Practice. The Transmission Provider or Host Transmission Owner, as appropriate, may curtail service under this Operating Agreement to limit or prevent damage to generating or transmission facilities caused by the Network Customer’s failure to maintain its facilities in accordance with Good Utility Practice, and the Transmission Provider or Host Transmission Owner may seek as a result any appropriate relief from the Commission.

  • Maintenance and Operation Member-Generator agrees to maintain their system and facilities in accordance with applicable manufacturer's recommended maintenance schedule and standard prudent engineering practices. Member-Generator covenants and agrees to operate their system, facilities and equipment so as to minimize the likelihood for a malfunction or other disturbance, damaging or otherwise affecting or impairing Cooperative’s electrical system. Member-Generator shall comply with all applicable laws, regulations, zoning, building codes, safety rules and other environmental regulations or restrictions applicable to the design, installation, operation and maintenance of the Member-Generator's System. Member-Generator must, at least once every year, conduct a test to confirm that Member-Generator’s System automatically ceases to energize the output (interconnection equipment output voltage goes to zero) within two (2) seconds of being disconnected from Cooperative’s electrical system. Disconnecting the Member-Generator’s System from Cooperative’s electrical system at the visible disconnect switch and measuring the time required for the unit to cease to energize the output shall satisfy this test. Member-Generator shall maintain a record of the results of these tests and, upon request by Cooperative, shall provide a copy of the test results to Cooperative. If Member-Generator is unable to provide a copy of the test results upon request, Cooperative shall notify Member- Generator by mail that Member-Generator has thirty (30) days from the date Member-Generator receives the request to provide Cooperative with the results of a test. If Member-Generator does not provide Cooperative with the test results within the thirty (30) day time period or if the test results provided to Cooperative show that Member-Generator’s net metering unit is not functioning correctly, Cooperative may immediately disconnect Member-Generator’s System from Cooperative’s electrical system. If Member-Generator’s equipment ever fails this test, Member-Generator shall immediately disconnect Member-Generator’s System from Cooperative's electrical system. Member-Generator’s System shall not be reconnected to Cooperative's electrical system by the Member-Generator until Member-Generator’s System is repaired and operating in a normal and safe manner. Cooperative shall have the right to have a representative present and informed when any such tests are conducted. Cooperative does not warrant the testing procedures or results by the presence of its representative. Member-Generator is responsible for protecting their equipment from transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits, and from any other causes or events. Therefore, Cooperative shall not be responsible for damage to Member-Generator’s equipment allegedly caused by transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits or other causes or events. Member-Generator agrees to notify Cooperative no less than thirty (30) days prior to modification of the components or design of the Member-Generator’s System that in any way may degrade or significantly alter the System’s output characteristics. Member-Generator acknowledges that any such modifications will require submission of a new Application and Agreement to Cooperative.

  • Use and Operation 3.1 Permitted Use ......................................................................................................

  • Termination of Facilities Declare the principal of and interest on the Loans, the Notes and the Reimbursement Obligations at the time outstanding, and all other amounts owed to the Lenders and to the Administrative Agent under this Agreement or any of the other Loan Documents (including, without limitation, all L/C Obligations, whether or not the beneficiaries of the then outstanding Letters of Credit shall have presented or shall be entitled to present the documents required thereunder) and all other Obligations (other than Hedging Obligations), to be forthwith due and payable, whereupon the same shall immediately become due and payable without presentment, demand, protest or other notice of any kind, all of which are expressly waived, anything in this Agreement or the other Loan Documents to the contrary notwithstanding, and terminate the Credit Facility and any right of the Borrower to request borrowings or Letters of Credit thereunder; provided, that upon the occurrence of an Event of Default specified in Section 12.1(j) or (k), the Credit Facility shall be automatically terminated and all Obligations (other than Hedging Obligations) shall automatically become due and payable without presentment, demand, protest or other notice of any kind, all of which are expressly waived, anything in this Agreement or in any other Loan Document to the contrary notwithstanding.

  • Financial Condition and Operations The Borrower will not permit any of the events set forth below to occur.

  • Construction of the Project The Allottee has seen the proposed layout plan, specifications, amenities and facilities of the Apartment/ Plot and accepted the floor plan, payment plan and the specification, amenities and facilities annexed along with this Agreement which has been approved by the competent authority, as represented by the Promoter. The Promoter shall develop the Project in accordance with the said layout plans, floor plans and specifications, amenities and facilities. Subject to the terms in this Agreement, the Promoter undertakes to strictly abide by such plans approved by the competent authorities and shall also strictly abide by the bye-laws, FAR, and density norms and provisions prescribed by the relevant building bye-laws and shall not have an option to make any variation/ alteration/ modification in such plans, other than in the manner provided under the Act, and breach of this term by the Promoter shall constitute a material breach of this Agreement.

  • Use of Facilities 35.1. In situations where a competitive LEC has the use of the facilities (i.e., Local Loop) to a specific customer premise, either through resale of local service or the lease of the Local Loop as an Unbundled Network Element, and Embarq receives a good faith request for service from a customer at the same premise or from another carrier with the appropriate customer authorization, the procedures below will apply.

  • Construction of Project 11.1.1 Developer agrees to cause the Project to be developed, constructed, and installed in accordance with the terms hereof and the Construction Provisions set forth in Exhibit D, including those things reasonably inferred from the Contract Documents as being within the scope of the Project and necessary to produce the stated result even though no mention is made in the Contract Documents.

  • Management and Operations 15.1 The Operator shall prepare an annual work programme and budget for each Calendar Year during the term of this Agreement. Each such work programme and budget shall set out in reasonable details, the work to be carried out, facilities to be purchased or created, training and employment programme, establishment, salaries and wages, social welfare schemes to be undertaken, and an estimate of the Expenditure to be incurred. The Operator shall present such work programme and budget to the Government and the Working Interest Owners before the start of each Calendar Year and thereafter provide a quarterly update on the implementation of such work programme and budget.