Concrete and Masonry Sample Clauses

Concrete and Masonry. Cut using a cutting machine, such as an abrasive saw or a diamond-core drill.
AutoNDA by SimpleDocs
Concrete and Masonry a. Coating cannot develop proper adhesion to concrete unless dirt, dust, laitance, and other loose materials are first removed from the surface by sweeping, chemical cleaning, or pressure washing. The Contractor shall repair surface defects and restore to match the surrounding existing areas and sand to an even surface.
Concrete and Masonry. Fill minor holes to provide uniform texture over surface as approved. Acid etch concrete surfaces receiving oil-based paints and rinse thoroughly.

Related to Concrete and Masonry

  • MASONRY 4.1 Storm Shelter Area/Tornado Protection: In new building construction, provide lateral and vertical bracing in the walls around the employee toilet rooms. DIVISION 5 – METALS

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Moonlighting 24.01 The Company and the Union agree in principle to eliminate the practice commonly referred to as moonlighting.

  • Přetrvající platnost This Section 3 “

  • Přetrvávající platnost Tento odstavec 1.3 “Zdravotní záznamy a Studijní data a údaje” zůstane závazný i v případě zániku platnosti či vypršení platnosti této Smlouvy.

  • FLOORING All Bed Rooms, Dinning-cum-Living, and would be finished with Ivory Vitrified tiles (24'' X 24'') flooring and 4'' skirting. Bath-room, Kitchen & Balcony would be finished with Ivory Ceramic tiles (12'' X 12'') flooring. The walls of the Toilets/Bathrooms would finish with white glazed tiles in 60'' height. Roof would be finished with roof tiles.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

Time is Money Join Law Insider Premium to draft better contracts faster.