Closure Procedures for Manure and Other Wastewater Facilities Sample Clauses

Closure Procedures for Manure and Other Wastewater Facilities. No manure or other wastewater control and retention structure shall be abandoned. Closure of all such structures shall occur as promptly as practicable after the permittee has ceased to operate, or, if the permittee has not ceased to operate, within 12 months after the date on which the use of the structure ceased. To close a manure or wastewater control and retention structure, the permittee shall remove all manure and wastewater and dispose of it in accordance with the permittee s CNMP, unless otherwise authorized by the [Permitting Authority].
AutoNDA by SimpleDocs

Related to Closure Procedures for Manure and Other Wastewater Facilities

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Electrical connections Equipment requiring electrical connections for operation shall either be hard wired to the Authorized User's provided connections or the Contractor shall be responsible for a male electrical union. All connections shall be made by the Contractor and accomplished in accordance with National Electrical Code requirements. Electrically operated equipment shall be available in the following volts and phases: 208 volt 1 or 3 phase, 60 HZ 220 volt 1 or 3 phase, 60 HZ 440 volt 1 or 3 phase, 60 HZ

  • Network Elements and Other Services Manual Additive 2.13.5.1 The Commissions in some states have ordered per-element manual additive non- recurring charges (NRC) for Network Elements and Other Services ordered by means other than one of the interactive interfaces. These ordered Network Elements and Other Services manual additive NRCs will apply in these states, rather than the charge per LSR. The per-element charges are listed on the Rate Tables in Exhibit C.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Compliance with Laws and Other Instruments Except for those that would not have a Material Adverse Effect, the business and operations of the Acquiree, the HK Company, Yangtze Newport have been and are being conducted in accordance with all applicable Laws and Orders. Except as would not have a Material Adverse Effect, neither the Acquiree, the HK Company, nor any PRC Company has received notice of any violation (or any Proceeding involving an allegation of any violation) of any applicable Law or Order by or affecting the Acquiree, the HK Company or any PRC Company and, to the knowledge of the Acquiree, the HK Company and each PRC Company, no Proceeding involving an allegation of violation of any applicable Law or Order is threatened or contemplated. Except for those that would not have a Material Adverse Effect, neither the Acquiree, the HK Company, nor Yangtze Newport is, and is not alleged to be, in violation of, or (with or without notice or lapse of time or both) in default under, or in breach of, any term or provision of its Organizational Documents or of any indenture, loan or credit agreement, note, deed of trust, mortgage, security agreement or other material agreement, lease, license or other instrument, commitment, obligation or arrangement to which the Acquiree is a party or by which any of the Acquiree’s properties, assets or rights are bound or affected. To the knowledge of the Acquiree, the HK Company and each PRC Company, no other party to any material contract, agreement, lease, license, commitment, instrument or other obligation to which the Acquiree, the HK Company or any PRC Company is a party is (with or without notice or lapse of time or both) in default thereunder or in breach of any term thereof. The Acquiree is not subject to any obligation or restriction of any kind or character, nor is there, to the knowledge of the Acquiree, any event or circumstance relating to the Acquiree, the HK Company or any PRC Company that materially and adversely affects in any way its business, properties, assets or prospects or that prohibits the Acquiree from entering into this Agreement or would prevent or make burdensome its performance of or compliance with all or any part of this Agreement or the consummation of the transactions contemplated hereby or thereby.

  • Pollution and Other Regulations Each of the Credit Parties:

  • Use of State Facilities Resources and Equipment a. Meeting Space and Facilities. The Employer’s campuses and facilities may be used by the Union to hold meetings subject to the University’s policy and availability of the space. The Employer may provide private space for stewards and/or Union representatives to meet in confidence with those they represent on a space available basis. Staff representatives may reserve and utilize meeting rooms in accordance with University policy and procedure. Such requests will be subject to availability and all applicable fees.

  • System Protection and Other Control Requirements Developer shall provide, install and test relay protection systems at the Merchant Transmission Facility to interface with those systems installed by Connecting Transmission Owner at the West 49th Street Substation.

  • System Protection Facilities The Interconnection Customer shall, at its expense, install, operate and maintain System Protection Facilities as a part of the Large Generating Facility or the Interconnection Customer’s Interconnection Facilities. The Participating TO shall install at the Interconnection Customer's expense any System Protection Facilities that may be required on the Participating TO’s Interconnection Facilities or the Participating TO’s Transmission System as a result of the interconnection of the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities.

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

Time is Money Join Law Insider Premium to draft better contracts faster.