Common use of CANAL WORK Clause in Contracts

CANAL WORK. Earthwork: Earth work includes earth work on canal system where ever required in order to make each component up to designed standard as shown in drawing, specification and bill of quantities. Earth work in main canal and minors has to be carried out both in filling section as well as in cutting section as per details shown in drawing in reaches where section of canal are not as per design. Earth work in filling reaches of canal has to be commenced with all diligence i.e. cleaning of surface, removing all vegetable and roots, serrations and then filling in required depth with watering compaction complete with all specification from head to tail of the canal. Earth work in cutting of main canal has to be done up to designed profile with disposal of excavated material 10 m away from outer toe of the canal. Special care shall be taken to leave proper gaps for natural drainage. Pucca works: Contract includes construction of Pucca structure with RCC, PCC and Masonry in Head sluice in main canal, Falls, VRB’s, C.D works as shown in drawing, specification and bill of quantities. Repairing of old structures: Repair of old structure after dismantling damaged parts such as masonry, coping and RCC where ever required as per site conditions. Lining: Lining work has the done in main canal C.C. with 20 mm graded metal in panels as per drawing and specification after bringing the canal section up to design profile. The P.C.C. lining is also to be carried out U/S and D/S of structures after making canal section up to designed profile as per drawing and specification enclosed.

Appears in 17 contracts

Samples: www.mpwrd.gov.in, Agreement, Agreement

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.