Browse Control Sample Clauses

Browse Control. Livestock: Fencing is anticipated to be the primary strategy used to prevent livestock browsing of riparian habitat. Where installed, wildlife- friendly fencing will be established around the habitat to prevent browsing or mechanical damage to allow for establishment of vegetation. Common fence types likely to be used include moveable electric fence on lands where livestock are present seasonally, or semi-permanent t-posts and barbed wire fence where livestock are likely to be in the area for a longer duration.
AutoNDA by SimpleDocs
Browse Control. Wildlife: Beaver are common within the Program Area. Browsing by xxxxxxx can interfere with achieving objectives of reforestation. In areas where beaver damage is expected to be severe, welded wire cages of fencing will be installed around vegetation as needed. Where employed, browsing protection will be installed to adequately protect plantings.
Browse Control. Wildlife: Beaver are common within the Program Area and preferentially target cottonwood and willow species. Although these species typically re-sprout following damage or removal, browsing by xxxxxxx can interfere with achieving objectives of reforestation. In areas where beaver damage is expected to be severe, welded wire cages or fencing will be installed around cottonwood and willow tree species as needed. Willow whips may be planted adjacent to waterways to create a living fence intended to deter xxxxxxx from browsing inland trees. Deer are also common in the Program Areas with natural or naturalized vegetation. However, browsing impact by deer is generally low enough to not require management. Where employed, browsing protection will be installed to adequately protect plantings.

Related to Browse Control

  • Noise Control The use of sound equipment is prohibited unless approved by Management. Any electronic equipment or machinery which is determined to be distracting to other exhibits will not be permitted.

  • Traffic Control The Surveyor shall control traffic in and near surveying operations adequately to comply with provisions of the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI which can be found on the State’s internet site. In the event field crew personnel must divert traffic or close traveled lanes, a Traffic Control Plan based upon principles outlined in the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI shall be prepared by the Surveyor and approved by the State prior to commencement of field work. A copy of the approved plan shall be in the possession of field crew personnel on the job site at all times and shall be made available to the State’s personnel for inspection upon request.

  • Weed Control The tenant shall control all noxious weeds on the subject lands and maintain all summerfallow in a reasonably weed-free condition.

  • Access Control Supplier will maintain an appropriate access control policy that is designed to restrict access to Accenture Data and Supplier assets to authorized Personnel. Supplier will require that all accounts have complex passwords that contain letters, numbers, and special characters, be changed at least every 90 days, and have a minimum length of 8 characters.

  • Site Control In the total loss of building use scenario, what likely exists will be a smoking pile of rubble. This rubble will contain many components that could be dangerous. It could also contain any personnel on the premises at the time of the disaster. For these reasons, the local fire marshal with the assistance of the police will control the site until the building is no longer a threat to surrounding properties and the companies have secured the site from the general public. During this time, the majority owner of the building should be arranging for a demolition contractor to mobilize to the site with the primary objective of reaching the cable entrance facility for a damage assessment. The results of this assessment would then dictate immediate plans for restoration, both short term and permanent. In a less catastrophic event, i.e., the building is still standing and the cable entrance facility is usable, the situation is more complex. The site will initially be controlled by local authorities until the threat to adjacent property has diminished. Once the site is returned to the control of the companies, the following events should occur. An initial assessment of the main building infrastructure systems (mechanical, electrical, fire and life safety, elevators, and others) will establish building needs. Once these needs are determined, the majority owner should lead the building restoration efforts. There may be situations where the site will not be totally restored within the confines of the building. The companies must individually determine their needs and jointly assess the cost of permanent restoration to determine the overall plan of action. Multiple restoration trailers from each company will result in the need for designated space and installation order. This layout and control is required to maximize the amount of restoration equipment that can be placed at the site, and the priority of placements. Care must be taken in this planning to ensure other restoration efforts have logistical access to the building. Major components of telephone and building equipment will need to be removed and replaced. A priority for this equipment must also be jointly established to facilitate overall site restoration. (Example: If the AC switchgear has sustained damage, this would be of the highest priority in order to regain power, lighting, and HVAC throughout the building.) If the site will not accommodate the required restoration equipment, the companies would then need to quickly arrange with local authorities for street closures, rights of way or other possible options available.

  • Infection Control Consistent with the Centers for Disease Control and Prevention Guideline for Infection Control in Health Care Personnel, and University Policy 3364-109-EH-603, the parties agree that all bargaining unit employees who come in contact with patients in the hospital or ambulatory care clinics will need to be vaccinated against influenza when flu season begins each fall. The influenza vaccine will be offered to all health care workers, including pregnant women, before the influenza season, unless otherwise medically contraindicated or it compromises sincerely held religious beliefs.

  • Erosion Control a. The Purchaser shall construct slash and debris erosion barriers, dips, water bars or ditches in skid trails and landings as directed by the Forest Officer.

  • Job Control Personal Data being processed on commission (i.e., Personal Data processed on a customer’s behalf) is processed solely in accordance with the Agreement and related instructions of the customer. Measures: • SAP uses controls and processes to monitor compliance with contracts between SAP and its customers, subprocessors or other service providers. • As part of the SAP Security Policy, Personal Data requires at least the same protection level as “confidential” information according to the SAP Information Classification standard. • All SAP employees and contractual subprocessors or other service providers are contractually bound to respect the confidentiality of all sensitive information including trade secrets of SAP customers and partners.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Data Access Control Persons entitled to use data processing systems gain access only to the Personal Data that they have a right to access, and Personal Data must not be read, copied, modified or removed without authorization in the course of processing, use and storage. Measures: • As part of the SAP Security Policy, Personal Data requires at least the same protection level as “confidential” information according to the SAP Information Classification standard. • Access to Personal Data is granted on a need-to-know basis. Personnel have access to the information that they require in order to fulfill their duty. SAP uses authorization concepts that document grant processes and assigned roles per account (user ID). All Customer Data is protected in accordance with the SAP Security Policy. • All production servers are operated in the Data Centers or in secure server rooms. Security measures that protect applications processing Personal Data are regularly checked. To this end, SAP conducts internal and external security checks and penetration tests on its IT systems. • SAP does not allow the installation of software that has not been approved by SAP. • An SAP security standard governs how data and data carriers are deleted or destroyed once they are no longer required.

Time is Money Join Law Insider Premium to draft better contracts faster.