Asphaltic Concrete Shoulders Sample Clauses

Asphaltic Concrete Shoulders. A difference in elevation that meets the requirements of Detail 150-B shall not be allowed to exist for a period greater than forty-eight (48) hours. After the removal of the existing shoulder the section or segment of travelway may be healed with stone as per Detail 150-E for a maximum of fourteen (14) calendar days. Asphaltic concrete shoulders shall be placed within two (2”) inches or less of the traveled way surface within fourteen (14) calendar days after the removal of the stone healed section or the removal of each section of the existing shoulder. The two (2”) inches or less difference in elevation shall not remain in existence for a period that exceeds thirty (30) calendar days unless the paved shoulder is utilized as a detour for the traveled way. During the placement period, traffic control shall be in accordance with the appropriate detail based on the depth of the change in elevation. The Contractor may propose an alternate plan based on Subsection 150.06.F. Failure to meet the above requirements and time restrictions shall be considered as non-performance of Work under Subsection 150.08.
AutoNDA by SimpleDocs

Related to Asphaltic Concrete Shoulders

  • Trench Rock Trench rock is defined as any material that must be removed from a trench that cannot be excavated with a hydraulic excavator having a bucket curling force rated at not less than 18,300 pounds (Caterpillar Model 215 or equivalent) and occupies an original volume of at least one-half cubic yard.

  • Utilization Scale STATE shall scale logs or portions of logs that are broken, wasted, or not removed by PURCHASER due to: (1) improper felling or bucking of the logs; (2) failure to remove the logs prior to deterioration; and (3) logs remaining on the timber sale area after completion of logging, provided the logs were merchantable prior to breakage or wastage. Material used to meet down material requirements in the section titled, "Reserved Timber," shall not be considered for utilization scale. PURCHASER shall pay for the logs at the contract price designated in Section 44. STATE shall notify PURCHASER of the volume of logs so scaled. Payment shall be considered due on such volume as if the logs were removed on the date of said notification. In the event PURCHASER disagrees with the findings made by STATE under this section, PURCHASER may furnish scaling by a third-party scaling organization acceptable to STATE. Costs and expenses of such third party shall be paid for by PURCHASER, and the findings of the third party shall be final.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • MSEA SEIU shall have exclusive rights to payroll deduction of membership dues, service fees, and premiums for current MSEA-SEIU spon- sored insurance programs. Deductions for other programs may be mutually agreed to by the parties.

  • MASONRY 4.1 Storm Shelter Area/Tornado Protection: In new building construction, provide lateral and vertical bracing in the walls around the employee toilet rooms. DIVISION 5 – METALS

  • Cement Cement to be used for the work shall comply the following and shall be used with the prior approval of Engineer -in -charge

  • TRENCH SHORING If this Contract is in excess of $25,000 and is for the excavation of any trench deeper than five (5) feet, Contractor must submit and obtain District’s approval and acceptance, in advance of excavation, of a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If the plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Safety Footwear 1. The State will provide employees in the classifications listed in Section 7 below, and employees who are currently required to wear safety footwear by Department Work Rules, an allowance of one hundred twenty dollars ($120.00) for replacement of safety footwear.

  • FABRICATION Making up data or results and recording or reporting them.