Pollution Control Equipment Upgrade Analysis definition

Pollution Control Equipment Upgrade Analysis means the technical study, analysis, review, and selection of control technology recommendations (including an emission rate or removal efficiency) required to be performed in connection with an application for a federal PSD permit, taking into account the characteristics of the existing facility. Except as otherwise provided in this Consent Decree, such study, analysis, review, and selection of recommendations shall be carried out in accordance with applicable federal and state regulations
Pollution Control Equipment Upgrade Analysis means the technical study, analysis, review, and selection of control technology recommendations (including an emission rate or removal efficiency) required to be performed in connection with an application for a federal PSD permit, taking into account the characteristics of the existing facility. Except as otherwise provided in this Consent Decree, such study, analysis, review, and selection of recommendations shall be carried out in accordance with applicable federal and state regulations and guidance describing the process and analysis for determining Best Available Control Technology (BACT), as that term is defined in 40 C.F.R. §52.21(b)(12), including, without limitation, the December 1, 1987 EPA Memorandum from J. Craig Potter, Assistant Administrator for Air and Radiation, regarding Improving New Source Review (NSR) Implementation. Nothing in this Decree shall be construed either to: (a) alter the force and effect of statements known as or characterized as “guidance” or (b) permit the process or result of a “Pollution Control Equipment Upgrade Analysis” to be considered BACT for any purpose under the Act.

Examples of Pollution Control Equipment Upgrade Analysis in a sentence

  • The Contractor shall operate in accordance with its approved OpSpecs and General Operations Manual to execute contract requirements.

  • DMG shall retain a qualified contractor to assist in the performance and completion of each Pollution Control Equipment Upgrade Analysis.

  • For each Unit in the DMG System for which DMG does not elect to meet a PM Emission Rate of 0.030 lb/mmBTU as required by Paragraph 86, DMG shall prepare, submit, and implement a Pollution Control Equipment Upgrade Analysis in accordance with this Paragraph.

  • Upon installation of all equipment recommended under an approved Pollution Control Equipment Upgrade Analysis, DMG shall operate such equipment in compliance with the recommendation(s) of the approved Pollution Control Equipment Upgrade Analysis, including compliance with the PM Emission Rate specified by the recommendation(s).

  • Little was known in the early days about life histories of the various fishes, what rearing and planting strategies would likely be the most successful, and the differences between various stocks and species of salmonids.

  • Grades and transcripts may also be withheld if books are not returned in good condition.

  • An installation period longer than one year may be allowed if DMG makes such a request in the Pollution Control Equipment Upgrade Analysis and EPA and the State of Illinois determine such additional time is necessary due to factors including but not limited to the magnitude of the PM control project or the need to address reliability concerns that could result from multiple Unit outages within the DMG System.

  • Such Pollution Control Equipment Upgrade Analysis shall include proposed upgrades to the Unit’s existing PM Control Devices and a proposed alternate PM Emission Rate that the Unit shall meet upon completion of such upgrade.

  • With each Pollution Control Equipment Upgrade Analysis delivered to EPA and the State of Illinois, DMG shall simultaneously deliver all documents that were considered in preparing such Pollution Control Equipment Upgrade Analysis.

Related to Pollution Control Equipment Upgrade Analysis

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • Vapor control system means a system that prevents release to the atmosphere of gasoline vapors in excess of 80 milligrams per liter of gasoline loaded (4.7 grains per liter).

  • Pollution control project means any activity or project at an existing electric utility steam generating unit for purposes of reducing emissions from such unit. Such activities or projects are limited to:

  • Analytical x-ray equipment means equipment used for x-ray diffraction or fluorescence analysis.

  • fall prevention equipment means equipment used to prevent persons from falling from a fall risk position, inducing personal equipment, a body harness, lanyards, lifelines or physical equipment such as guard-rails, screens, barricades, anchorages or similar equipment;

  • National Ambient Air Quality Standards or “NAAQS” means national ambient air quality standards that are promulgated pursuant to Section 109 of the Act, 42 U.S.C. § 7409.

  • Collateral Quality Test A test satisfied as of the Effective Date and any other date thereafter on which such test is required to be determined hereunder if, in the aggregate, the Collateral Obligations owned (or in relation to a proposed purchase of a Collateral Obligation, both owned and proposed to be owned) by the Issuer satisfy each of the tests set forth below (or, after the Effective Date, if any such test is not satisfied at the time of reinvestment, the level of compliance with such test is maintained or improved as described in the Investment Criteria):