On-Port Project Elements definition

On-Port Project Elements means the elements of work described in Section 2.1 or Attachment A of the Grant Agreement as (1) the “Bascule Bridge”, (2) the Rail lines and Gantry System”, and (3) the “Intermodal Apron”, and which are expected to be undertaken or constructed on or within the Port of Miami and which shall be funded principally with the grant funds awarded to the County under the Grant Agreement.

Related to On-Port Project Elements

  • Peak tube potential means the maximum value of the potential difference across the x-ray tube during an exposure.

  • Cost of idle facilities or idle capacity means costs such as maintenance, repair, housing, rent, and other related costs, e.g., insurance, interest, property taxes and depreciation or use allowances.

  • Subprojects means more than one such Subproject.

  • Individual generation site means the contiguous site at or on which one or more hazardous wastes are generated. An individual generation site, such as a large manufacturing plant, may have one or more sources of hazardous waste but is considered a single or individual generation site if the site or property is contiguous.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.

  • Environmental Attributes means any emissions and renewable energy credits, energy conservation credits, benefits, offsets and allowances, emission reduction credits or words of similar import or regulatory effect (including emissions reduction credits or allowances under all applicable emission trading, compliance or budget programs, or any other federal, state or regional emission, renewable energy or energy conservation trading or budget program) that have been held, allocated to or acquired for the development, construction, ownership, lease, operation, use or maintenance of the Company as of: (i) the date of this Agreement; and (ii) future years for which allocations have been established and are in effect as of the date of this Agreement.

  • Interconnection Party means a Transmission Provider, Interconnection Customer, or the Interconnected Transmission Owner. Interconnection Parties shall mean all of them.

  • These courses also satisfy an MTA area Communication: COM 225; Natural Science: ENV 101, 105; Humanities: ART 143, 150; COM 225; XXX 180; DRA 180; ENG 181, 213, 214, 224, 242; FLM 150, 221; HUM 175; MUS 180; Social Science: ANT 201; ECO 280; GEO 101; HST 108, 109, 123, 150, 230, 235; PSY 251; SOC 205. These courses apply, but do not satisfy the MTA: CCP 251 WCC AAS in Nursing, Registered Requirements (43 credits) Nursing Program Credits....................................................... 35 Nursing Course Block 35 NUR 108, 115, 128, 138, 288 Students must contact the EMU RN to BSN admissions advisor to present proof of passing the NCLEX, to complete a plan of study, and receive waivers. 30 hours will apply to the nursing major credit. x hours will apply as general elective credit. . Waivers will be given for NURS 260, 270 and DTC 203. BIO 212 Pathophysiology: Alterations in Structure 4 BIO 000 General Transfer Credit 4 * BIO 237 Microbiology (in place of BIO 147) 4 BIO 328 Microbiology for Health Professions 4 EMU Requirements and Electives that May be Taken at WCC or EMU (18 credits) *PSY 100 Introduction to Psychology...................................... 3 PSY 101 General Psychology (GEKS) 3 Open Electives (not to exceed 94 transfer credits) .......................... 15 General Transfer Credit 15 Credits at WCC: ..............................................94 Credits that transfer to EMU 94 * Required for EMU’s BSN Nursing Completion program. If not transferred, must be completed at EMU. 1 Fulfills EMU’s Perspectives on a Diverse World requirement.

  • Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.

  • Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.

  • Subproject Agreement means any of the agreements referred to in Section 3.07 of this Agreement; and

  • Sub-project means a specific development project to be carried out by a Beneficiary utilizing the proceeds of a Sub-loan;

  • Environmental Attribute means an aspect, claim, characteristic or benefit associated with the generation of a quantity of electricity by a Renewable Energy Facility, other than the electric energy produced, and that is capable of being measured, verified or calculated. An Environmental Attribute may include one or more of the following identified with a particular megawatt hour of generation by a Renewable Energy Facility designated prior to Delivery: the Renewable Energy Facility’s use of a particular Renewable Energy Source, avoided NOX, SO X, CO2 or greenhouse gas emissions, avoided water use (but not water rights or other rights or credits obtained pursuant to requirements of Applicable Law in order to site and develop the Renewable Energy Facility itself) or as otherwise defined under an Applicable Program, or as agreed by the Parties. Environmental Attributes do not include production tax credits or other direct third-party subsidies for generation of electricity by any specified Renewable Energy Facility.

  • Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.

  • Production Burdens means any royalties (including lessor’s royalties), overriding royalties, production payments, net profit interests or other burdens upon, measured by or payable out of oil, gas or mineral production.

  • Subproject means a specific water and/or sanitation Subproject financed or to be financed by a Subproject Grant (as hereinafter defined) provided from the proceeds of the Credit under Part C.1 of the Project;

  • Project Entity means a Utah interlocal entity or an electric interlocal entity that

  • Project Capacity means the AC capacity of the project at the generating terminal(s) and to be contracted with MSEDCL for supply from the Solar Power Project.

  • Self-service storage facility or "facility" means any real property designed or used for the purpose of renting or leasing individual storage space to tenants who are to have access to that space for the purpose of storing and removing personal property.

  • Production Facilities (7 9) means "production equipment" and specially designed software therefor integrated into installations for "development" or for one or more phases of "production".

  • Material Project EBITDA Adjustments means, with respect to each Material Project:

  • Project Equipment means the items of machinery, equipment or other personal property used in connection with the construction and development of the Project pursuant to the provisions hereof, and all replacements thereof and substitutions therefor made pursuant to this Agreement.

  • Construction Party means a party to a Construction Service Agreement. “Construction Parties” shall mean all of the Parties to a Construction Service Agreement.

  • Project Company means Company incorporated by the bidder as per Indian Laws in accordance with Clause no 3.5.

  • Service Point the place at which the Services are to be performed.