Examples of Import MPAN in a sentence
MTD show the MPAN having at least two settlement registers (one Export and one Import).6.Meter Operator sends Meter Technical Details (D0150) for Export MPAN, to confirm that there is no metering associated with the MPAN.7.Supplier updates the existing Import MPAN registration to have an Import/Export SSC (and MTC), rather than Import-only.
Agents are already appointed for existing Import MPAN.3.Supplier sends D0142 to Meter Operator Agent, instructing them to install Import/Export metering for the existing Import MPAN5.4.Supplier sends D0142 to Meter Operator Agent, instructing them to disconnect the metering associated with the Export MPAN5.5.Meter Operator sends Meter Technical Details (D0149/D0150) for existing Import MPAN to Supplier, NHHDC and LDSO.
This option of sharing the same CTs could be an issue if the MOA appointed to the Import MPAN is only qualified as a NHHMOA.
Under the P81 solution, both SSC 0393 (for the Import MPAN), and SSC 0482 (for the Export MPAN) have a single TPR, as follows: Note that each SSC has an SSC Type (held as part of the SSC definition in Market Domain Data) that distinguishes Import (type ‘I’) from Export (type ‘E’).
Meter Point Administration Numbers (MPAN) are used to uniquely identify each exit point receiving power from the distribution network (an Import MPAN), and each generation point feeding power into the distribution network (Export MPAN).
Since no Metering Equipment is shared the Suppliers responsible for each MPAN can appoint their own appropriately Qualified MOA and DC (i.e. NHH or HH for the Import MPAN and HH for the Export MPAN).
Responsible Supplier means, in respect of a Smart Metering System (or anyDevice forming, or intended to form, part of a Smart Metering System) which relates to:(a) an Import MPAN, the Import Supplier for that Smart Metering System;(b)(a) an Export MPAN, the Export Supplier for that Smart Metering System; and/or(c)(b) an MPRN, the Gas Supplier for that Smart Metering System.
In practice some meters also have the RE- reactive export power component allocated to the Import MPAN The upshot of this four-register system is that the reactive import metered flow must be allocated to the import MPAN even if that flow occurs at a time of real power export.
Copies of the document and the evidence should also be filed with the Director of Composition and with the Office of Judicial Affairs (Director Michael Crowe / Michael.Crowe@wku.edu).
The Import LLFC would still be registered against the MPAN in SMRS as for any normal Import MPAN.