Historic Resources Survey definition

Historic Resources Survey means a neighborhood or citywide survey to identify eligible historic resources, including buildings, structures, objects, sites, and historic districts. A historic resources survey generally results in a list of properties that are potentially eligible for national, state, or local landmark designation.

Examples of Historic Resources Survey in a sentence

  • Each Preservation Plan is required to contain seven elements: The Mission Statement, Goals and Objectives, Function of the Plan, the Context Statement, the Historic Resources Survey, Design Guidelines, and the Preservation Incentives/Adaptive reuse policies located in the Appendix.

  • The reports and field surveys required under this section shall conform to the criteria established in the Guidelines for Conducting Historic Resources Survey in Virginia published by DHR.

  • Contributing structures are those structures, landscapes, natural features, or sites identified as contributing to the overall integrity of the HPOZ by the Historic Resources Survey for the HPOZ.

  • The Historic Resources Survey is a document which identifies all contributing and non-contributing structures, landscape features, natural features and sites, individually or collectively, including street features, furniture or fixtures, and which is certified as to its accuracy and completeness by the Cultural Heritage Commission.

  • Photographs shall comply with HABS/HAER Photographs Specifications and Guidelines (http://www.cr.nps.gov/hdp/standards/HABS/photospecs.pdf) and DHR’s “Photographic Documentation for Virginia Department of Historic Resources Survey (Updated 2016).

  • Each Preservation Plan is required to contain seven elements: The Mission Statement, Goals and Objectives, Function of the Plan, the Context Statement, the Historic Resources Survey, Design Guidelines, and the Preservation incentives/Adaptive reuse policies located in the Appendix.

  • Historic Resources Survey ProjectsA historic resources survey is often the first step a community takes in a series of preservation activities.

  • Upon initiation by City Council, the City Planning Commission, the Director of Planning, or the Cultural Heritage Commission, a Historic Resources Survey shall be prepared, pursuant to Subdivision 3., below.

  • The second sealed envelope shall be marked “Haverford Township Historic Resources Survey – Cost Proposal” and shall contain one (1) printed copy of the Cost Proposal.

  • The first sealed envelope shall be marked “Haverford Township Historic Resources Survey –Technical Proposal” and shall contain one (1) printed copy of the Technical Proposal along with a USB drive containing an electronic copy of the Technical Proposal.

Related to Historic Resources Survey

  • Historic resource means a publicly or privately owned historic building, structure, site, object, feature, or open space located within an historic district designated by the national register of historic places, the state register of historic sites, or a local unit acting under the local historic districts act, 1970 PA 169, MCL 399.201 to 399.215, or that is individually listed on the state register of historic sites or national register of historic places, and includes all of the following:

  • Water resources means all waters of the state occurring on the surface, in natural or artificial channels, lakes, reservoirs, or impoundments, and in subsurface aquifers, which are available, or which may be made available to agricultural, industrial, commercial, recreational, public, and domestic users;

  • Public resources means water, fish, and wildlife and in addition means capital improvements of the state or its political subdivisions.

  • economic resources means assets of every kind, whether tangible or intangible, movable or immovable, which are not funds, but may be used to obtain funds, goods or services;

  • Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • Service Control Point (SCP) is the node in the common channel signaling network that accepts Queries for certain Database services. The SCP is a real time database system that receives Queries from service platforms, performs subscriber or application-specific service logic, and then sends a Response back to the Query-originating platform. Such service platforms can be Service Switching Points (SSPs) or other network nodes capable of properly formatting and launching Queries.

  • computer resource means computer, computer system, computer network, data, computer data base or software;

  • renewable energy sources means renewable sources such as small hydro, wind, solar including its integration with combined cycle, biomass, bio fuel cogeneration, urban or municipal waste and other such sources as approved by the MNRE;

  • Environmental Management System means an environmental management system or plan of management to address all environmental risks and to ensure compliance with all Environmental Laws and licences;

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Renewable energy resources means resources as defined

  • Environmental Management Plan or “EMP” means the environmental management plan for the Project, including any update thereto, incorporated in the IEE;

  • Environmental and Social Management Plan or “ESMP” means a site-specific environmental and social management plan to be prepared in accordance with the parameters laid down in the ESMF and acceptable to the Association, setting forth a set of mitigation, monitoring, and institutional measures to be taken during the implementation and operation of the Project activities to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels, and including the actions needed to implement these measures.

  • Quality Surveillance Engineer / Inspector means any person appointed by or on behalf of the Purchaser to inspect or carry out quality surveillance on supplies, stores or work under the Contract or any person deputed by the Quality Surveillance Engineer for the said purpose.

  • Rehabilitation counseling services means services provided by qualified personnel in individual or group sessions that focus specifically on career development, employment preparation, achieving independence, and integration in the workplace and community of a student with a disability. The term also includes vocational rehabilitation services provided to a student with disabilities by vocational rehabilitation programs funded under the Rehabilitation Act of 1973, as amended.

  • PJM Reliability Assurance Agreement means that certain Reliability Assurance Agreement Among Load Serving Entities in the PJM Region, on file with FERC as PJM Interconnection L.L.C. Rate Schedule FERC No. 44, and as amended from time to time thereafter. Schedule of Work:

  • Stormwater management system means any equipment, plants,

  • New Jersey Stormwater Best Management Practices (BMP) Manual or “BMP Manual” means the manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this chapter. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department’s determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Section IV.F. of this ordinance and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this chapter.

  • Environmental Management Framework or “EMF” means the framework adopted by the Recipient through its Ministry of Planning and Investment’s Decision No 116/QD-BKH dated January 22, 2010 and referred to in the paragraph 2 of Section I.C of Schedule 2 to this Agreement, which sets out the environmental protection measures in respect of the Project, as well as administrative and monitoring arrangements to ensue the implementation of said framework, as said Environmental Management Framework may be revised from time to time with the prior concurrence of the Association.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Flood Boundary and Floodway Map (FBFM means an official map of a community, issued by the FEMA, on which the Special Flood Hazard Areas and the floodways are delineated. This official map is a supplement to and shall be used in conjunction with the Flood Insurance Rate Map (FIRM).

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • Phase I Report means, with respect to any Facility, a report that (i) conforms to the ASTM Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process, E 1527, (ii) was conducted no more than six months prior to the date such report is required to be delivered hereunder, by one or more environmental consulting firms reasonably satisfactory to Administrative Agent, (iii) includes an assessment of asbestos-containing materials at such Facility, (iv) is accompanied by (a) an estimate of the reasonable worst-case cost of investigating and remediating any Hazardous Materials Activity identified in the Phase I Report as giving rise to an actual or potential material violation of any Environmental Law or as presenting a material risk of giving rise to a material Environmental Claim, and (b) a current compliance audit setting forth an assessment of Holdings’, its Subsidiaries’ and such Facility’s current and past compliance with Environmental Laws and an estimate of the cost of rectifying any non-compliance with current Environmental Laws identified therein and the cost of compliance with reasonably anticipated future Environmental Laws identified therein.