Flood project definition

Flood project means a drainage, flood
Flood project means a drainage, flood mitigation, or flood control project, including:
Flood project means a structural or nonstructural storm water or flood management, protection, control, drainage, or mitigation project, including:

Examples of Flood project in a sentence

  • The first, Fiji Book Flood project from 1980 to 1981, provides an interesting example since students there studied in their own vernacular until grade 3 and then subsequently English, as is currently the policy in Papua New Guinea.

  • Road and Flood project requirements are strictly prescribed in the Public Contract Code.

  • As under the original design there were some issues with elite capture.Under Additional Financing II (Flood), project activities targeted about 500,000 flood affected people to benefit from flood-proof infrastructure in 200 consolidation villages in Jamalpur and Gaibandha, as well as 100 villages in the neighboring district of Sirajganj.

  • The Indian Dairy Corporation (IDC) was also set up in 1970 under the Indian companies act to help and achieve the objectives of 23 Dr. V kurien, Unfinished Dream, Sage Publications, New Delhi, 1992, Operation Flood project.

  • However, in some cases, ongoing project activities have created potential negative impacts to the poorest and most vulnerable populations, for example the implementation of JPN FRMP-CDOR resulted in risking two displaced sub- communities from being trapped or boxed-in between two floodwalls; and the displacement of households in the WB-AIIB MM Flood project.

  • The Company commenced installation of the first two polymer skids as part of the commercial Polymer Flood project.

  • Mulyono Karim, a Kompas reporter, criticized the East Canal Flood project, asserting that the real problem lies in Jakarta‘s conventional drainage system, which was based on an outdated principle of collecting and delivering rainwater quickly to the Jakarta Bay.

  • Hebron Dredging Project: Houston Engineering had completed a FEMA study for the Hebron Flood project.

  • He served as Dy. Chief Accountant in Department of Public Accounts under Ministry of Finance for 2 years and was transferred to United Nation Development Program (UNDP) funded project, Glacier Lake Outburst Flood project (GLoF) for 4 years.

  • IOWA CODE CHAPTER 418FLOOD MITIGATION PROGRAM418.1 Definitions.418.2 and 418.3 Reserved.418.4 Projects.418.5 Flood mitigation board.418.6 Expenses of board members.418.7 Department duties.418.8 Flood mitigation program.418.9 Project application review.418.10 Flood mitigation fund.418.11 Sales tax increment calculation.418.12 Sales tax increment fund.418.13 Flood project fund.418.14 Bond issuance.418.15 Durational limitation on use of revenues — property disposition.

Related to Flood project

  • Flood Program means the National Flood Insurance Program created by the U.S. Congress pursuant to the National Flood Insurance Act of 1968, the Flood Disaster Protection Act of 1973, the National Flood Insurance Reform Act of 1994 and the Flood Insurance Reform Act of 2004, in each case as amended from time to time, and any successor statutes.

  • Tidal Flood Hazard Area means a flood hazard area in which the flood elevation resulting from the two-, 10-, or 100-year storm, as applicable, is governed by tidal flooding from the Atlantic Ocean. Flooding in a tidal flood hazard area may be contributed to, or influenced by, stormwater runoff from inland areas, but the depth of flooding generated by the tidal rise and fall of the Atlantic Ocean is greater than flooding from any fluvial sources. In some situations, depending upon the extent of the storm surge from a particular storm event, a flood hazard area may be tidal in the 100-year storm, but fluvial in more frequent storm events.

  • Area of special flood hazard means the land in the flood plain within a community subject to a one percent or greater chance of flooding in any given year.

  • Flood hazard area means any area subject to inundation by the base flood or risk from channel migration including, but not limited to, an aquatic area, wetland, or closed depression.

  • Flood proofing means any combination of structural and non-structural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents.

  • Flood Hazard Property means any Real Estate Asset subject to a Mortgage in favor of Collateral Agent, for the benefit of the Secured Parties, and located in an area designated by the Federal Emergency Management Agency as having special flood or mud slide hazards.

  • Special Flood Hazard Area means an area that FEMA’s current flood maps indicate has at least a one percent (1%) chance of a flood equal to or exceeding the base flood elevation (a 100-year flood) in any given year.

  • Floodplain or flood-prone area means any land area susceptible to being inundated by water from any source (see definition of “flood”).

  • Flood Zone means areas having special flood hazards as described in the National Flood Insurance Act of 1968, as amended from time to time, and any successor statute.

  • Special Flood Hazard Area (SFHA means the land in the floodplain subject to a one percent (1%) or greater chance of being flooded in any given year, as determined in Article 3, Section B of this ordinance.

  • Flood Hazard Boundary Map (FHBM means an official map of a community, issued by the Federal Emergency Management Agency, where the boundaries of the Special Flood Hazard Areas have been defined as Zone A.

  • Flood Elevation Study means an examination, evaluation and determination of flood hazards and, if appropriate, corresponding water surface elevations, or an examination, evaluation and determination of mudslide (i.e., mudflow) or flood-related erosion hazards.

  • Flood fringe means the portion of the floodplain outside the floodway that is usually covered with water from the 100-year flood or storm event. This includes, but is not limited to, the flood or floodway fringe designated by the Federal Emergency Management Agency.

  • Condominium Project Real estate including the separate ownership in fee, or on a satisfactory leasehold estate, of a particular residential unit with an indivisible interest in the real estate designated for common ownership strictly by unit owners.

  • Flood plain means land that:

  • Mortgaged Property shall have the meaning assigned to such term in the recitals.

  • Regulatory Flood Protection Elevation means the “Base Flood Elevation” plus the “Freeboard”. In “Special Flood Hazard Areas” where Base Flood Elevations (BFEs) have been determined, this elevation shall be the BFE plus two (2) feet of freeboard. In “Special Flood Hazard Areas” where no BFE has been established, this elevation shall be at least two (2) feet above the highest adjacent grade.

  • Road hazard means a hazard that is encountered while

  • Flood or flooding means a general and temporary condition of partial or complete inundation of normally dry land areas from:

  • Condominium Property means the lands, leaseholds, and personal property that are subjected to condominium ownership, whether or not contiguous, and all improvements thereon and all easements and rights appurtenant thereto intended for use in connection with the condominium.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Mortgaged Real Property means each of the parcels of real property set forth on Schedule 4 hereto, or interests therein, owned in fee by a Credit Party, together with each other parcel of Real Property that shall become subject to a Mortgage after the Closing Date, in each case together with all of such Credit Party’s right, title and interest in the improvements and buildings thereon and all appurtenances, easements or other rights belonging thereto.

  • Base flood elevation (BFE) means the elevation shown on the Flood Insurance Rate Map for Zones AE, AH, A1-30, VE and V1-V30 that indicates the water surface elevation resulting from a flood that has a 1-percent or greater chance of being equaled or exceeded in any given year.

  • Flood Insurance Study means the official report provided by the Federal Insurance Administration that includes flood profiles, the Flood Insurance Rate Map, the Flood Boundary and Floodway Map, and the water surface elevation of the base flood.

  • Flood-related erosion area management means the operation of an overall program of corrective and preventive measures for reducing flood-related erosion damage, including but not limited to emergency preparedness plans, flood-related erosion control works and floodplain management regulations.

  • Mixed-use project means a project comprising both a qualified