Estimated Project Cost means Benchmark cost of MNRE which is Rs 8.00 Crore/MWp as per MNRE letter no. 03/20/2014-15/GCRT/11.12.14 at the time of Bid Due date.
Repair or replacement means the restoration of vehicles, vessels, or outboard
Project Cost means the costs incurred in connection with the
Estimated Cost , for the purposes of rule 22, means the estimated cost to maintain, repair or replace a major capital item;
Improvement Costs means any additional expenditure on a fixed asset that materially increases the capacity of the asset or materially improves its functioning or represents more than 10% of the initial depreciation base of the asset;
Equipment Cost means, for each Unit, the purchase price therefor -------------- paid by the Owner Trustee to the Lessee pursuant to Section 2 of the Participation Agreement and as set forth in Schedule 1 to the Participation Agreement with respect to such Unit. Notwithstanding anything to the contrary contained in the Operative Agreements, the Equipment Cost for any Replacement Unit shall be deemed to be the Equipment Cost or deemed Equipment Cost of the Unit replaced by such Replacement Unit.
Operating Cost means the costs associated with operating a multifamily development once the project is placed in service.
Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.
Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.
Replacement Cost means the cost to repair or rebuild the improvements owned by Lessor at the time of the occurrence to their condition existing immediately prior thereto, including demolition, debris removal and upgrading required by the operation of applicable building codes, ordinances or laws, and without deduction for depreciation.
Restoration Cost has the meaning set forth in Section 5.06.
Repair means to restore to proper operating condition a tank, pipe, spill prevention equipment, overfill prevention equipment, corrosion protection equipment, release detection equipment or other UST system component that has caused a release of product from the UST system or has failed to function properly.
Repairs means the repairs to be made to the Mortgaged Property, as described on the Repair Schedule of Work (Exhibit C) or as otherwise required by Lender in accordance with this Loan Agreement.
Direct Cost means a cost not to exceed the cost of labor, material, travel and other expenditures to the extent the costs are directly incurred to provide the relevant assistance or service. “Direct Cost” to the Acquirer for its use of any of a Respondent’s employees’ labor shall not exceed the average hourly wage rate for such employee;
Replacement Costs means the expenditures for obtaining and installing equipment, accessories or appurtenances which are necessary during the useful life of the treatment works to maintain the capacity and performance for which such works were designed and constructed.
Full Replacement Cost as used herein shall mean the actual replacement cost of the Leased Property requiring replacement from time to time including an increased cost of construction endorsement, if available, and the cost of debris removal. In the event either party believes that full replacement cost (the then-replacement cost less such exclusions) has increased or decreased at any time during the Lease Term, it shall have the right to have such full replacement cost re-determined.
Estimated Costs means costs estimated by the Authority as likely to be:
Project Costs means all allowable costs, as set forth in the applicable Federal cost principles, incurred by a recipient and the value of the contribu- tions made by third parties in accom- plishing the objectives of the award during the project period.
The Contract Price/Project Cost means the price payable to the Vendor under the Contract for the full and proper performance of its contractual obligations.
Development Cost means the total of all costs incurred in the completion of a Development excluding Developer Fee, operating deficit reserves, and total land cost as typically shown in the Development Cost line item on the development cost pro forma.
Original Project Cost means the capital expenditure incurred by the Generating Company or the Transmission Licensee, as the case may be, within the original scope of the project up to the cut-off date as admitted by the Commission;
Building Operating Expenses means the portion of “Operating Expenses,” as that term is defined in Section 4.2.7 below, allocated to the tenants of the Building pursuant to the terms of Section 4.3.1 below.
Net cost means the Contractor’s actual cost after deducting all permitted cash and trade discounts, rebates, allowances, credits, sales taxes, commissions, and refunds (whether or not any or all of the same shall have been taken by the Contractor) of all parts and materials purchased by the Contractor solely for the use in performing its obligation hereunder provided, where such purchase has received the prior written approval of the Manager as required herein. The Contractor shall promptly furnish to the Manager such bills of sale and other instruments as the Manger may require, executed, acknowledged and delivered, assuring to the Manager title to such materials, supplies, equipment, parts, and tools free of encumbrances.
Project Equipment means the items of machinery, equipment or other personal property used in connection with the construction and development of the Project pursuant to the provisions hereof, and all replacements thereof and substitutions therefor made pursuant to this Agreement.
Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of
Required Repairs shall have the meaning set forth in Section 7.1.1 hereof.