Estimate of Cost definition

Estimate of Cost. The forms will be prepared and updated per each submittal (Pre-final and Final) for all the roadway, stream bank stabilization and structural items.
Estimate of Cost. The forms will be prepared and updated per each submittal (Pre-final and Final) for all the items. Consultant and District Details: BLA will utilize IDOT district details as needed and include them in the plans. We are estimating 00 xxxxxxxx xxx xxxxxxx details and 6 traffic signal or roundabout details. Pavement Marking and Signing Plans: The plan will illustrate the striping and signing. Lighting Plan Coordination: The lighting plan will be prepared for the roundabout option only by Xxxx Engineering. Time included here is for coordination time with the subconsultant. If the traffic signal is the geometry selected, combination mast arms will be utilized. Traffic Signal Plans: BLA will prepare and provide the traffic signal plans per submittal for their review. We are anticipating one proposed signal sheet, one proposed cable sheet, one street name sign sheet, and one summary of signal quantity sheet. Erosion Control Plans: BLA will prepare permanent and temporary erosion control plans for the roadway and proposed detention area. BLA will prepare the detail sheets for the Soil Water Conservation District permit and the NPDES-SWPPP permit.

Examples of Estimate of Cost in a sentence

  • Further details appear below in this Item V (see Other Fees and Estimate of Cost to Establish the Franchise).

  • The installation costs are described below in this Item V (see Estimate of Cost to Establish the Franchise) and the ongoing monthly costs are shown here.

  • The City of Decatur will not release the Engineer's Estimate of Cost in advance of the scheduled time and date of the bid opening.

  • Estimate of Cost of Utilizing Credit over 2003-2008: Not available.

  • The following exhibits are attached hereto and are hereby made part of this contract: Attachment A – Scope of Service Attachment B - Estimate of Cost Attachment C - Certification Regarding Debarment, Suspension, and Other Responsibility Matters - Primary Covered Transactions.

  • The City of Decatur hereinafter referred to as“City” or “Owner”, will not release the Engineer's Estimate of Cost in advance of the scheduled time and date of the bid opening.

  • Preliminary Estimate of Cost of Wind Power Project as per Format 7.11 of the RfS.

  • Participants shall submit Form 470-0510, Estimate of Cost, to initiate payments or change the amount of payment for expenses other than child care.

  • Break-up of the Preliminary Estimate of Cost of Project as per Format 7.12 (separately for each Project).

  • Estimate of Cost to the Federal Reserve System The cost to the Federal Reserve System is negligible.

Related to Estimate of Cost

  • Reasonable cost means a cost for a service or item that is consistent with the market standards for comparable services or items.

  • Operating Cost means the costs associated with operating a multifamily development once the project is placed in service.

  • Estimated Project Cost means Benchmark cost of MNRE which is Rs 8.00 Crore/MWp as per MNRE letter no. 03/20/2014-15/GCRT/11.12.14 at the time of Bid Due date.

  • Cost-plus-a-percentage-of-cost contract means a contract under which the contractor is paid a percentage of the total actual expenses or costs in addition to the contractor's actual expenses or costs.

  • Reasonable Operating Expenses means expenses that arise from the operation, maintenance and routine repair of the Project, including all payments and deposits required under this Agreement and any of the Loan Documents, and that comply with the requirements of 24 C.F.R. 232.1007, or successor regulation.

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Net cost means the Contractor’s actual cost after deducting all permitted cash and trade discounts, rebates, allowances, credits, sales taxes, commissions, and refunds (whether or not any or all of the same shall have been taken by the Contractor) of all parts and materials purchased by the Contractor solely for the use in performing its obligation hereunder provided, where such purchase has received the prior written approval of the Manager as required herein. The Contractor shall promptly furnish to the Manager such bills of sale and other instruments as the Manger may require, executed, acknowledged and delivered, assuring to the Manager title to such materials, supplies, equipment, parts, and tools free of encumbrances.

  • Reasonable Additional Expenses means expenses for meals, taxi fares, essential telephone calls, local transportation, and lodging which are necessarily incurred as the result of Trip Delay and which are not provided by the Common Carrier or any other party free of charge.

  • FTE Cost means, for any period, the FTE Rate multiplied by the number of FTEs in such period.

  • Estimated Cost , for the purposes of rule 22, means the estimated cost to maintain, repair or replace a major capital item;

  • Manufacturing Cost means ***

  • Equipment Cost means, for each Unit, the purchase price therefor -------------- paid by the Owner Trustee to the Lessee pursuant to Section 2 of the Participation Agreement and as set forth in Schedule 1 to the Participation Agreement with respect to such Unit. Notwithstanding anything to the contrary contained in the Operative Agreements, the Equipment Cost for any Replacement Unit shall be deemed to be the Equipment Cost or deemed Equipment Cost of the Unit replaced by such Replacement Unit.

  • Reasonable Costs means the reasonable actual costs and expenses incurred by us in carrying out any further Audit under this Contract, including, but not limited to, reasonable travel and subsistence costs;

  • Original Project Cost means the capital expenditure incurred by the Generating Company or the Transmission Licensee, as the case may be, within the original scope of the project up to the cut-off date as admitted by the Commission;

  • Development Cost means the total of all costs incurred in the completion of a Development excluding Developer Fee, operating deficit reserves, and total land cost as typically shown in the Development Cost line item on the development cost pro forma.

  • Project Cost means the costs incurred in connection with the

  • Improvement Costs means any additional expenditure on a fixed asset that materially increases the capacity of the asset or materially improves its functioning or represents more than 10% of the initial depreciation base of the asset;

  • Building Operating Expenses means the portion of “Operating Expenses,” as that term is defined in Section 4.2.7 below, allocated to the tenants of the Building pursuant to the terms of Section 4.3.1 below.

  • Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.

  • Base Cost means base cost as defined in paragraph 1 of the Eighth Schedule;

  • Direct Cost means a cost not to exceed the cost of labor, material, travel and other expenditures to the extent the costs are directly incurred to provide the relevant assistance or service. “Direct Cost” to the Acquirer for its use of any of a Respondent’s employees’ labor shall not exceed the average hourly wage rate for such employee;

  • Estimate means to be based on technical evaluation of the sources contributing to the discharge including, but not limited to, pump capabilities, water meters, and batch discharge volumes.

  • Direct Expenses means “Operating Expenses” and “Tax Expenses.”

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Replacement Cost means the cost to repair or rebuild the improvements owned by Lessor at the time of the occurrence to their condition existing immediately prior thereto, including demolition, debris removal and upgrading required by the operation of applicable building codes, ordinances or laws, and without deduction for depreciation.

  • Carrying Cost means book value of the assets and interest accrued thereon but not received;