Direct Hydrologic Connection definition

Direct Hydrologic Connection means a surface water connection which occurs on an average of 30 or more consecutive days per year. In the absence of reliable hydrologic records, a continuum of naturally occurring wetlands may be used to establish a direct hydrologic connection.

Examples of Direct Hydrologic Connection in a sentence

  • Direct Hydrologic Connection A surface water connection which, under normal hydrological conditions, occurs on an average of thirty (30) or more consecutive days per year.

  • Clean Water Act Coverage of “Discharges of Pollutants” via a Direct Hydrologic Connection to Surface Water, 83 Fed.

  • Under the heading “Applicability of the Regulations to Operations That Have a Direct Hydrologic Connection toGround Water,” EPA stated: Because of its relevance to today’s proposal, EPA is restating that the Agency interprets the Clean Water Act to apply to discharges of pollutants from a point source via ground water that has a direct hydrologic connection to surface water.

  • If Adopted, the Direct Hydrologic Connection Theory WouldImpose Significant Costs on Amici and the Public 23CONCLUSION 30CERTIFICATE OF COMPLIANCE 31CERTIFICATE OF SERVICE 32 TABLE OF AUTHORITIES FEDERAL CASES26 Crown Assocs., LLC v.

  • Evaluacije se odvijaju kroz krugove u kojima se ispituju pojedina pitanja bitna za borbu protiv korupcije.

  • Steering rules for vessels in sight of each other, including sound signals.

  • If Appellants’ argument is adopted, it will create uncertainty whether NPDES permit requirements apply and will likely impede the application of this type of beneficial infrastructure.C. If Adopted, the Direct Hydrologic Connection Theory Would Impose Significant Costs on Amici and the PublicIf Appellants’ argument is adopted, significant costs will be imposed on Amici and the public.

  • As noted in the Associations’ comments in response to EPA’s Request for Comments on CWA Coverage of “Discharges of Pollutants” via a Direct Hydrologic Connection to Surface Water,4 we believe that Congress was equally unambiguous in its exclusion of these types of releases from the scope of the NPDES permit program.Indeed, it is abundantly clear that Congress precisely and expressly limited the scope of the NPDES program to discharges of pollutants from point sources to waters under federal jurisdiction.

  • The Associations submitted comments on May 21, 2018 in response to EPA’s Request for Comments on CWA Coverage of “Discharges of Pollutants” via a Direct Hydrologic Connection to Surface Water.5 Additionally, API, along with other industry groups, filed an amicus curiae brief in Maui, a recent case in the Ninth Circuit that considered many of the same issues here.6 API and AOPL also filed an amicus brief in Upstate Forever v.

  • Perspektif Organisational Changes: Research Organisational Changes: Research IndicatorResearch grants / funding CollaborationPublicationSource: developed from (Intsiful and Maassen 2017) According to Solichan "In terms of research funding, UIN Walisongo experienced a significant increase, for example there was Rp. 15 million, Rp. 40 million, and even up to Rp. 200 million.

Related to Direct Hydrologic Connection

  • Water Connection means the point where a water service line attaches to a water main, thereby allowing water to flow from the City’s water system to an individual customer.

  • Gasification means the substoichiometric oxidation or steam reformation of a substance to produce a gaseous mixture containing two or more of the following: (i) oxides of carbon; (ii) methane; and (iii) hydrogen;

  • Inter-connection Point means interface point of renewable energy generating facility with the transmission system or distribution system, as the case may be:

  • Sewer connection means the connection of a structure or project to a public sewer system.

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • Connection Point means an exit point or an entry point or a bidirectional point identified or to be identified as such in an access contract.

  • connecting point means the point at which the drainage installation joins the connecting sewer;

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • connection pipe means a pipe, the ownership of which is vested in the municipality and installed by it for the purpose of conveying water from a main to a water installation, and includes a “communication pipe” referred to in SANS 0252 Part I;

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.

  • Interconnection is As Defined in the Act.

  • Water Service Connection (lateral) shall mean the pipes and fixtures used for the purpose of supplying any premises in the Municipality with water from the Corporation’s water distribution system that is located between the Corporation’s water main in the street and the street property line abutting the premises so supplied.

  • Interconnection Facilities means the Transmission Owner Interconnection Facilities and the Customer Interconnection Facilities.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Projects means the projects identified in Exhibit A to the Agreement and all other projects, any costs of which are included in a Transitional Capital Plan pursuant to the Act or are Recovery Costs, and financed, by payment or reimbursement, with the proceeds of Bonds or Notes.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • cogeneration means the simultaneous generation in one process of thermal energy and electrical or mechanical energy;

  • Green infrastructure means a stormwater management measure that manages stormwater close to its source by:

  • Interconnection Provider means PacifiCorp Transmission.

  • Interconnection Party means a Transmission Provider, Interconnection Customer, or the Interconnected Transmission Owner. Interconnection Parties shall mean all of them.

  • Infrastructure means infrastructure serving the County and improved or unimproved real estate and personal property, including machinery and equipment, used in the operation of the Project, within the meaning of Section 4-29-68 of the Code.

  • Transmission Owner Interconnection Facilities means all Interconnection Facilities that are not Customer Interconnection Facilities and that, after the transfer under Tariff, Attachment P, Appendix 2, section 5.5 to the Interconnected Transmission Owner of title to any Transmission Owner Interconnection Facilities that the Interconnection Customer constructed, are owned, controlled, operated and maintained by the Interconnected Transmission Owner on the Interconnected Transmission Owner’s side of the Point of Interconnection identified in appendices to the Interconnection Service Agreement and to the Interconnection Construction Service Agreement, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Customer Facility with the Transmission System or interconnected distribution facilities. Transmission Provider: The “Transmission Provider” shall be the Office of the Interconnection for all purposes, provided that the Transmission Owners will have the responsibility for the following specified activities:

  • Cross Connection means a jumper cable or similar connection provided pursuant to Collocation at the digital signal cross connect, Main Distribution Frame or other suitable frame or panel between (i) the Collocating Party’s equipment and (ii) the equipment or facilities of the housing party.

  • Generating Facilities means Interconnection Customer’s device for the production and/or storage for later injection of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities. Generation Interconnection Customer:

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;