Examples of Designated Outline in a sentence
In light of the Agencies’ stated intent to address their substantial concerns with the NWPR through a new rulemaking, the Agencies request that the Court order a remand and are not including a request for vacatur.Granting Remand Conserves Judicial Resources.
Advice on the Designated Outline is given in BD 2 (DMRB 1.1.1).3 (05/14) The compiler should ensure that each design specification includes an outline Approval in Principle form as referred to in Standard BD 2 (DMRB 1.1.1) or the Technical Approval Scheme adopted by the Overseeing Organisation.4 (05/14) For structures which are not CE marked the design certificate, completed by the Contractor, should be forwarded to the Technical Approval Authority for acceptance, together with the check certificate.
Note: A Designated Outline is shown as enclosing each structure to be designed by the Contractor and each structure for which a choice of designs is offered.
The Designated Outline delineates the limits of measurement of work to be included for each structure (with the exception of those works scheduled as not to be included).
Each of the two individual Bills of Quantities is to be provided in accordance with the various Chapters and Series of the Method of Measurement for all the works contained within the Designated Outline (with the exception of those works scheduled as not to be included).
Structures Designed 8 Where the Contract provides only for a structure designed by theby the Contractor Contractor to be constructed a Bill of Quantities comprising asingle item for all the works within the Designated Outline (with the exception of those works scheduled as not to be included) is to be provided in accordance with Series 2500.
Structures Designed 8 Where the Contract provides only for a structure designed by theby the Contractor Contractor to be constructed a Bill of Quantities comprising a single itemfor all the works within the Designated Outline (with the exception of those works scheduled as not to be included) is to be provided in accordance with Series 2500.
The Designated Outline delineatesthe limits of measurement of work to be included for each structure (with the exception of those works scheduled as not to be included).
Structures Designed 8 Where the Contract provides only for a structure designed by theby the Contractor Contractor to be constructed a Bill of Quantities comprising a singleitem for all the works within the Designated Outline (with the exception of those works scheduled as not to be included) is to be provided in accordance with Series 2500.