Water Quality Control Division Challenges Sample Clauses

Water Quality Control Division Challenges 
AutoNDA by SimpleDocs

Related to Water Quality Control Division Challenges

  • Quality Control A. Controlled Affiliate agrees to use the Licensed Marks and Name only in connection with the licensed services and further agrees to be bound by the conditions regarding quality control shown in attached Exhibit A as they may be amended by BCBSA from time-to-time.

  • Use; Quality Control a. Neither party may alter the other party’s trademarks from the form provided and must comply with removal requests as to specific uses of its trademarks or logos.

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • Quality Control Program The Contractor shall describe the Quality Control Program in a written document which shall be reviewed by the Engineer prior to the start of any production, construction, or off-site fabrication. The written Quality Control Program shall be submitted to the Engineer for review at least ten (10) calendar days before the start of construction. The Quality Control Program shall be organized to address, as a minimum, the following items:

  • Quality Control Plan Within forty five (45) days after the design development documents are approved, the Design-Builder shall develop a quality control plan for the Project (the “Quality Control Plan”). A draft of the Quality Control Plan shall be submitted to the Department and shall be subject to the Department’s review and approval. The Quality Control Plan shall be tailored to the specific products/type of construction activities contemplated by the GMP Basis Documents, and in general, shall include a table of contents, quality control team organization, duties/responsibilities of quality control personnel, submittal procedures, inspection procedures, deficiency correction procedures, documentation process, and a list of any other specific actions or procedures that will be required for key elements of the Work.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Water Quality 8.1. The Supply shall comply with the quality standards imposed by the Act and the Water Quality Regulations, PROVIDED ALWAYS that where a particular standard is the subject of a legal instrument accepted or issued by the Secretary of State or the Chief Inspector of Drinking Water under the provisions of the Act or the Water Quality Regulations, compliance with the terms of the relevant legal instrument shall be deemed to be compliance with the relevant quality standard imposed by the Act or the Water Quality Regulations (as the case may be), in which case the Water Company shall provide the New Appointee with a certified copy of any such authorised departure or undertaking. Each party undertakes to keep the other party fully informed of any discussions which take place at any time hereafter with the Secretary of State for the proposed issue of a legal instrument and of the outcome thereof.

  • Power Quality Neither the facilities of Developer nor the facilities of Connecting Transmission Owner shall cause excessive voltage flicker nor introduce excessive distortion to the sinusoidal voltage or current waves as defined by ANSI Standard C84.1-1989, in accordance with IEEE Standard 519, or any applicable superseding electric industry standard. In the event of a conflict between ANSI Standard C84.1-1989, or any applicable superseding electric industry standard, ANSI Standard C84.1-1989, or the applicable superseding electric industry standard, shall control.

  • Clinical Management for Behavioral Health Services (CMBHS) System The CMBHS is the official record of documentation by System Agency. Grantee shall:

Time is Money Join Law Insider Premium to draft better contracts faster.