Waste dump Sample Clauses

Waste dump. 1 Waste dump – 1 covers an area of 11.892 Ha and has been heighten to 182 mRL as on date. Size of a part of the dump at present is 432 m Long x 212 m wide x 60 m in average and the other part is 385 m x 71 m x 12 m. As on date the dump has accommodated about 2556845 CuM waste, with 3 number of terraces. Considering following suggestions space for 2033465 CuM can be created.  Thus the height of the dump will go from existing 182 mRL to 202 mRL or the height of the dump will be extended to further 20 m from existing height. For this aspect, technical studies by XXXXX Xxxxxxx (Annexure - 17).  A Gabion wall from the toe of the waste dump – 1 towards north and west shall be constructed to find more area for accommodating wastes as per suggestions of Z Tech India Pvt. Ltd., New Delhi (Annexure - 18). As per design the evaluated factor of safety is 1.3. GEMTECH CONSULTANTS Pvt. Ltd. Page / 55 Xxxx Xxxxxxx X.X.Xxxxxxx X.X.Xxxxx A/10, Baramunda HB Colony, BBSR-3 RQP/BBS/023/2000/A RQP/NGP/027/87/A RQP/CAL/175/93/A It is proposed to construct a Gabion faced Reinforced earth Retaining wall with Terramesh, and reinforcing the wall with Strip bonded high tenacity Polyester core (Paralink) Geo-grid reinforcement for a length of 346 m & height of 31m with a purpose to retain the existing sloping dump, and also to increase the dump capacity of the chromite mines, to a greater extent. The proposed wall will be constructed at a 60 initial batter at the bottom tier, by placing Galvanized, double twisted PVC coated steel wire mesh (Terramesh) modular units, packed with stone and placing those units, layer by layer, and then reinforcing each layer of the reinforced soil with Paralink reinforcement as per the approved design & drawing. The Terramesh units will be filled with hard, angular to round stones of size 150 to 300 mm. The top layers of the wall will be constructed with an environmental friendly (Green Terra-mesh) modular units to increase stability, as well as aesthetics of the wall. During the construction of the Reinforced wall, both horizontal & vertical Geo-composite drains will be provided in layers at a suitable spacing to prevent pore water pressure in the wall system, and also to prevent reduction in shear strength values of the reinforced fill. Terramesh system is a versatile modular system used for mechanically stabilized earth slopes and predominately used for Industrial, Mining, Road work, River Bank stabilization application areas. This being a “modular...
AutoNDA by SimpleDocs
Waste dump. 2 Waste dump – 2 covers an area of 4.875 Ha and has been heighten to 180 mRL as on date. Size of the dump at present is 250 m Long x 195 m wide x 40 High. As on date the dump has accommodated about 812005 CuM waste, with 2 number of terraces. For extending the periphery of the quarry on Band-I towards north about 275000 CuM from 1.0 Ha area from the toe of the dump shall be shifted and will be re-located on waste dump -2 to join with vacant area towards IMFA dump. The vacant area can accommodate additional quantum of 353613 CuM waste. Thus wastes dump – 2 of BAL and dump of IMFA merges. This is under an agreement between both lessee’s. At this time size of the dump will be 411 m Long x 126 m wide x 37 High (in average). It has been calculated that the ultimate capacity of the dump after extending towards common boundary to join with wastes of IMFA will cater about 1165618 CuM waste (Plate No – 7A & 7B). MoU with IMFA (Annexure - 19) along with approval of DMS (Annexure - 19), has been accorded. Dump slope also be stabilized with plantation, Coir matting & grass turfing. Overall slope will be kept at 28O. Existing statutory provisions like retaining wall, and garland drain, check dams, terraces and settling tanks those exist at site will be reconstructed.

Related to Waste dump

  • Waste Disposal Tenant shall store its waste either inside the Premises or within outside trash enclosures that are fully fenced and screened in compliance with all Private Restrictions, and designed for such purpose. All entrances to such outside trash enclosures shall be kept closed, and waste shall be stored in such manner as not to be visible from the exterior of such outside enclosures. Tenant shall cause all of its waste to be regularly removed from the Premises at Tenant’s sole cost. Tenant shall keep all fire corridors and mechanical equipment rooms in the Premises free and clear of all obstructions at all times.

  • CLEAN AIR AND WATER POLLUTION CONTROL ACT Customer Purchase Orders using federal funds must contain a provision that requires the Contractor to agree to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. 7401-7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. 1251-1387). Violations must be reported to the Federal awarding agency and the Regional Office of the Environmental Protection Agency (EPA). Pursuant to the Federal Rule above, Contractor certifies that it is in compliance with all applicable provisions of the Clean Air Act (42 U.S.C. 7401-7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. 1251-1387) and will remain in compliance during the term of the Contract.

  • Pollution Control The Employer and the Union agree to limit all forms of environmental pollution.

  • Waste Management 4.1 Has your company been issued an EPA Hazardous Waste Generator I.D. Number? Existing Tenants should describe any additional identification numbers issued since the previous certificate. Yes [ ] No [ ]

  • Clean Air (1) The Contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act, as amended, 42 U.S.C. §§ 7401

  • Clean Air Act A. The contractor agrees to comply with all applicable standards, orders, or regulations issued pursuant to the Clean Air Act, as amended, 42 U.S.C. Section 7401 et seq.

  • Waste or Nuisance Tenant shall not commit, or suffer to be committed, any waste upon the Leased Premises, or any nuisance, or other act or thing which may disturb the quiet enjoyment of any other tenant or occupant of the Complex in which the Leased Premises are located.

  • Waste and Nuisance Not to commit or permit any waste, damage or injury to the Leased Premises including the Leasehold Improvements and trade fixtures therein, reasonable wear and tear excluded, any overloading of the floors thereof, any nuisance therein or any use or manner of use causing unreasonable annoyance to other tenants and occupants of the Building.

  • Occupational Health and Safety Act The Employer, the Union and the employees agree to be bound by the provisions of the Occupational Health and Safety Act, S.N.S. 1996, c.7.

  • Fraud, Waste, and Abuse Contractor understands that HHS does not tolerate any type of fraud, waste, or abuse. Violations of law, agency policies, or standards of ethical conduct will be investigated, and appropriate actions will be taken. Pursuant to Texas Government Code, Section 321.022, if the administrative head of a department or entity that is subject to audit by the state auditor has reasonable cause to believe that money received from the state by the department or entity or by a client or contractor of the department or entity may have been lost, misappropriated, or misused, or that other fraudulent or unlawful conduct has occurred in relation to the operation of the department or entity, the administrative head shall report the reason and basis for the belief to the Texas State Auditor’s Office (SAO). All employees or contractors who have reasonable cause to believe that fraud, waste, or abuse has occurred (including misconduct by any HHS employee, Grantee officer, agent, employee, or subcontractor that would constitute fraud, waste, or abuse) are required to immediately report the questioned activity to the Health and Human Services Commission's Office of Inspector General. Contractor agrees to comply with all applicable laws, rules, regulations, and System Agency policies regarding fraud, waste, and abuse including, but not limited to, HHS Circular C-027. A report to the SAO must be made through one of the following avenues: ● SAO Toll Free Hotline: 1-800-TX-AUDIT ● SAO website: xxxx://xxx.xxxxx.xxxxx.xx.xx/ All reports made to the OIG must be made through one of the following avenues: ● OIG Toll Free Hotline 0-000-000-0000 ● OIG Website: XxxxxxXxxxxXxxxx.xxx ● Internal Affairs Email: XxxxxxxxXxxxxxxXxxxxxxx@xxxx.xxxxx.xx.xx ● OIG Hotline Email: XXXXxxxxXxxxxxx@xxxx.xxxxx.xx.xx. ● OIG Mailing Address: Office of Inspector General Attn: Fraud Hotline MC 1300 P.O. Box 85200 Austin, Texas 78708-5200

Time is Money Join Law Insider Premium to draft better contracts faster.