Common use of Topographic Survey Clause in Contracts

Topographic Survey. The first task performed by F&L will be to complete a detailed topographic survey of the two Project areas to serve as the basis of design for the proposed improvements and for development of a base plan. The survey will be conducted as follows: • Perform field topographic surveys within the Project limits including 20-feet on each side of the existing water main to capture visible public and private improvements, driveways and utilities, including existing U.S.A. markings within street right of ways. San Francisco Office: 000 Xxxxxxxxx Xxxx Xxxx, Xxxxx 0000 San Mateo Office: 000 Xxxxx Xxx Xxxxx Xxxxx Xxxxxxx Office: 000 Xxxxxxxxxx Xxxxxx, Xxxxx 000 Xxx Xxxxxxxxx, XX 00000 San Mateo, CA 94401 Xxxxxxx, XX 00000 Tel: (000) 000-0000 Tel: (000) 000-0000 Tel: (000) 000-0000 xxx.xxxxxxxxxxxxx.xxx Xx. Xxxxxxxx Xxxxxxx, P.E. Page 2 of 6 2nd REVISION - February 6, 2020 • The limit of work within street right of ways will be the back of sidewalk. Where no sidewalk exists, limit of work will be 5 feet from edge of pavement. • Horizontal control and vertical control will be based on City Benchmarks and GPS control. • Inverts, pipe sizes and direction of flow will be collected for sanitary sewer and storm drain lines (if any) within the limits of work. Storm drain and sanitary sewer appurtenances will be dipped. • All surface expressions of existing water line utility lines obtained from available maps will be field verified. • Easements, if any, shown on recorded maps of the area will be shown on the survey map and base plan. • All visible clean outs will be located. • Existing utility location research will be performed including review of available City and utility owner drawings. Approximate utility locations interpreted from available drawings will be shown on the Project base plan1. • Survey information will be translated to AutoCAD drawings for development of the Project base plan and associated construction documents. • The topographic survey will also include estimated property lines and right of way (ROW) lines as shown on available City or County provided maps. Deliverables

Appears in 2 contracts

Samples: Agreement, Agreement

AutoNDA by SimpleDocs

Topographic Survey. The first task performed by F&L will be to complete a detailed topographic survey of the two Project areas Energy Court to serve as the basis of design for the proposed improvements and for development of a base plan. The survey will be conducted as follows: • Perform field topographic surveys within the Project limits including 20-feet on each side of the existing water main to capture visible public and private improvements, driveways and utilities, including existing U.S.A. markings within street right of ways. San Francisco Office: 000 Xxxxxxxxx Xxxx Xxxx, Xxxxx 0000 San Mateo Office: 000 Xxxxx Xxx Xxxxx Xxxxx Xxxxxxx Office: 000 Xxxxxxxxxx Xxxxxx, Xxxxx 000 Xxx Xxxxxxxxx, XX 00000 San Mateo, CA 94401 Xxxxxxx, XX 00000 Tel: (000) 000-0000 Tel: (000) 000-0000 Tel: (000) 000-0000 xxx.xxxxxxxxxxxxx.xxx Xx. Xxxxxxxx Xxxxxxx, P.E. Page 2 of 6 2nd REVISION - February 64 May 11, 2020 2021 • The limit of work within street right of ways will be the back of sidewalk. Where no sidewalk exists, limit of work will be 5 feet from edge of pavement. • Horizontal control and vertical control will be based on previous survey completed by F&L that was based on City Benchmarks and GPS control. • Inverts, pipe sizes and direction of flow will be collected for sanitary sewer and storm drain lines (if any) within the limits of work. Storm drain and sanitary sewer appurtenances will be dipped. • All surface expressions of existing water line utility lines obtained from available maps will be field verified. • Easements, if any, shown on recorded maps of the area will be shown on the survey map and base plan. • All visible clean outs will be located. • Existing utility location research will be performed including review of available City and utility owner drawings. Approximate utility locations interpreted from available drawings will be shown on the Project base plan1. • Survey information will be translated to AutoCAD drawings for development of the Project base plan and associated construction documents. • The topographic survey will also include estimated property lines and right of way (ROW) lines as shown on available City or County provided maps. DeliverablesD eliverables

Appears in 1 contract

Samples: Agreement

Topographic Survey. The first task performed by F&L will be to complete a detailed topographic survey of the two Project areas to serve as the basis of design for the proposed improvements and for development of a base plan. The survey will be conducted as follows: • Perform field topographic surveys within the Project limits including 20-feet on each side of the existing water main to capture visible public and private improvements, driveways and utilities, including existing U.S.A. markings within street right of ways. San Francisco Office: 000 Xxxxxxxxx Xxxx Xxxx, Xxxxx 0000 San Mateo Office: 000 Xxxxx Xxx Xxxxx Xxxxx Xxxxxxx Office: 000 Xxxxxxxxxx Xxxxxx, Xxxxx 000 Xxx Xxxxxxxxx, XX 00000 San Mateo, CA 94401 Xxxxxxx, XX 00000 Tel: (000) 000-0000 Tel: (000) 000-0000 Tel: (000) 000-0000 xxx.xxxxxxxxxxxxx.xxx Xx. Xxxxxxxx Xxxxxxx, P.E. Page 2 of 6 2nd REVISION - February 6, 2020 • The limit of work within street right of ways will be the back of sidewalk. Where no sidewalk exists, limit of work will be 5 feet from edge of pavement. • Horizontal control and vertical control will be based on City Benchmarks and GPS control. • Inverts, pipe sizes and direction of flow will be collected for sanitary sewer and storm drain lines (if any) within the limits of work. Storm drain and sanitary sewer appurtenances will be dipped. • All surface expressions of existing water line utility lines obtained from available maps will be field verified. • Easements, if any, shown on recorded maps of the area will be shown on the survey map and base plan. • All visible clean outs will be located. • Existing utility location research will be performed including review of available City and utility owner drawings. Approximate utility locations interpreted from available drawings will be shown on the Project base plan1. • Survey information will be translated to AutoCAD drawings for development of the Project base plan and associated construction documents. • The topographic survey will also include estimated property lines and right of way (ROW) lines as shown on available City or County provided maps. DeliverablesD eliverables

Appears in 1 contract

Samples: Agreement

Topographic Survey. The first task performed by F&L CONSULTANT will be to complete perform a detailed topographic survey of the two Project identified project areas to serve as the basis of design for the proposed improvements support design, permitting, and for development of a base planactivities. The project area limits of survey are depicted in Figure 1. The topographic survey will be conducted as follows: • Perform field topographic surveys within the Project limits including 20-feet on each side of the existing water main to capture visible public collect and private improvements, driveways and utilities, including existing U.S.A. markings within street right of ways. San Francisco Office: 000 Xxxxxxxxx Xxxx Xxxx, Xxxxx 0000 San Mateo Office: 000 Xxxxx Xxx Xxxxx Xxxxx Xxxxxxx Office: 000 Xxxxxxxxxx Xxxxxx, Xxxxx 000 Xxx Xxxxxxxxx, XX 00000 San Mateo, CA 94401 Xxxxxxx, XX 00000 Tel: (000) 000-0000 Tel: (000) 000-0000 Tel: (000) 000-0000 xxx.xxxxxxxxxxxxx.xxx Xx. Xxxxxxxx Xxxxxxx, P.E. Page 2 of 6 2nd REVISION - February 6, 2020 • The limit of work within street right of ways will be the back of sidewalk. Where no sidewalk exists, limit of work will be 5 feet from edge of pavement. • Horizontal control and vertical control will be based on City Benchmarks and GPS control. • Inverts, pipe sizes and direction of flow will be collected for sanitary sewer and storm drain lines (if any) depict elevation data within the limits of worksurvey sufficient to develop one (1) foot contours. Storm drain This topographic survey includes the location, size and sanitary sewer appurtenances elevations of all above ground improvements and evidence of subsurface improvements such as drainage structures falling within and adjacent to the limits of survey. It does not include the location of subsurface improvements such as utilities and foundations. This survey will be dipped. • All surface expressions also not include the location and mapping of existing water line utility lines obtained from available maps will be field verifiedindividual trees. • Easements, if any, shown on recorded maps The spatial data collected in the course of performing the area will be shown on the survey map and base plan. • All visible clean outs will be located. • Existing utility location research will be performed including review of available City and utility owner drawings. Approximate utility locations interpreted from available drawings will be shown on the Project base plan1. • Survey information will be translated to AutoCAD drawings for development of the Project base plan and associated construction documents. • The topographic survey will also include estimated property lines be relative to the North American Datum of 1983/2011 Realization (NAD83/11) and right the North American Vertical Datum of way 1988 (ROWNAVD88) lines as shown based on available City control established through the use of the National Geodetic Survey (NGS) On-line User Positioning Service (OPUS) and/or ties to existing Lake County and/or NGS geodetic control stations. A minimum of two (2) three-dimensional control points will be established in the vicinity of each site area in the course of performing the survey. Below is a list of the areas to be surveyed with a brief description of the preliminary plan for each. The following specific topographic features and items will be surveyed within each specific area:  Area 1 – Conceptual Improvements are to eliminate two culverts and install low water crossings. o Survey Seasonal High-Water Lines (SHWL), Normal Pool (NP) Lines, and existing berm and ditch bottom. Measure cross sections at 00-xx xxxxxxxxx xxxxx xxxx xxxx,.  Xxxx 0 – Conceptual Improvements are to install a stable low water crossing. o Survey SHWL, NP, and existing berm and ditch bottom. Measure cross sections at 50-ft intervals along berm road. Exhibit B  Area 3 – Conceptual Improvements are to remove culvert and put low water crossing. o Survey SHWL, NP, and existing berm and ditch bottom. Measure cross sections at 00-xx xxxxxxxxx xxxxx xxxx xxxx.  Xxxx 0 – No survey required for this upland restoration area.  Area 5 – Approximately 3 culverts to be removed and replaced with low water crossing. o Survey SHWL, NP, and existing berm and ditch bottom. Measure cross sections at existing culverts and at 00-xx xxxxxxxxx xxxxx xxxx xxxx.  Xxxx 0 – Install stable base for roadway. A culvert may or County provided mapsmay not be required. Deliverableso Survey SHWL, NP, and existing berm, ditch bottom, and connectivity between north and south pools. Measure cross sections at 00-xx xxxxxxxxx xxxxx xxxx xxxx.  Xxxx 0 - Install stable base for roadway o Survey SHWL, NP and measure cross sections at 00-xx xxxxxxxxx xxxxx xxxxx xxxx.  Xxxx 0 – Possible failed culvert. Install low water crossing o Survey SHWL, NP, and existing berm, ditch bottom, and connectivity between pools. Measure cross sections at 00-xx xxxxxxxxx xxxxx xxxx xxxx.  Xxxx 0 – Stabilize maintenance trail. o Survey out to dry location (25’ typical). Measure cross sections at 00-xx xxxxxxxxx xxxxx xxxxx xxxx / shoreline.  Area 10 – Berm bisecting middle of wetland. Remove berm and install a less invasive pathway suitable for emergency vehicles during controlled xxxxx o Survey SHWL, NP, and existing berm, ditch bottom, and depth of water. Measure cross sections at 25-ft intervals along berm road, approximately 25’ out from berm top of slope.  Area 11 – No survey required for this upland restoration area. Field crews will be directed to keep vehicles on trail roads to minimize potential impacts to existing natural habitat during survey activities. Upon completion of field survey activities, a certified topographic survey, compiled in AutoCAD Civil 3D format, will be produced to map and portray existing site conditions. All work and products will be produced in conformance with Florida Administrative Code Rule Chapter 5J-17, Standards of Practice, pursuant to Chapter 472, Florida Statues. D eliverable: Copies of collected data and survey information. Final deliverable products will be three (3) certified topographic survey drawings together with the associated CAD files.

Appears in 1 contract

Samples: Consulting Services

AutoNDA by SimpleDocs

Topographic Survey. The first task performed by F&L will be to complete a detailed topographic survey of the two Project areas Energy Court to serve as the basis of design for the proposed improvements and for development of a base plan. The survey will be conducted as follows: • Perform field topographic surveys within the Project limits including 20-feet on each side of the existing water main to capture visible public and private improvements, driveways and utilities, including existing U.S.A. markings within street right of ways. San Francisco Office: 000 Xxxxxxxxx Xxxx Xxxx, Xxxxx 0000 San Mateo Office: 000 Xxxxx Xxx Xxxxx Xxxxx Xxxxxxx Office: 000 Xxxxxxxxxx Xxxxxx, Xxxxx 000 Xxx Xxxxxxxxx, XX 00000 San Mateo, CA 94401 Xxxxxxx, XX 00000 Tel: (000) 000-0000 Tel: (000) 000-0000 Tel: (000) 000-0000 xxx.xxxxxxxxxxxxx.xxx Xx. Xxxxxxxx Xxxxxxx, P.E. Page 2 of 6 2nd REVISION - February 64 May 11, 2020 2021 • The limit of work within street right of ways will be the back of sidewalk. Where no sidewalk exists, limit of work will be 5 feet from edge of pavement. • Horizontal control and vertical control will be based on previous survey completed by F&L that was based on City Benchmarks and GPS control. • Inverts, pipe sizes and direction of flow will be collected for sanitary sewer and storm drain lines (if any) within the limits of work. Storm drain and sanitary sewer appurtenances will be dipped. • All surface expressions of existing water line utility lines obtained from available maps will be field verified. • Easements, if any, shown on recorded maps of the area will be shown on the survey map and base plan. • All visible clean outs will be located. • Existing utility location research will be performed including review of available City and utility owner drawings. Approximate utility locations interpreted from available drawings will be shown on the Project base plan1. • Survey information will be translated to AutoCAD drawings for development of the Project base plan and associated construction documents. • The topographic survey will also include estimated property lines and right of way (ROW) lines as shown on available City or County provided maps. Deliverables

Appears in 1 contract

Samples: Agreement

Time is Money Join Law Insider Premium to draft better contracts faster.