Status and Project Description Sample Clauses

Status and Project Description. (a) Participant understands that he/she has been approved to participate in the Project as a visitor and is not an employee or student of ISU for any purpose. Participant shall be solely responsible for determining all tax liability and for reporting and remitting any taxes or payments due or owed by the Participant, including any foreign tax liability, in connection with the Project or any activities carried out pursuant to this Agreement.
AutoNDA by SimpleDocs

Related to Status and Project Description

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • Property Description A document prepared as an exhibit for the conveyance of a property interest, reflecting a boundary survey, signed and sealed by a Registered Professional Land Surveyor (RPLS), attached to an acquisition deed as Exhibit A, and consists of the following two (2) parts:

  • Site Description 2.5.1 If reasonably requested by the A/E as necessary for the Project, the Owner shall furnish a legal description and a certified land survey of the Site, giving, as applicable, grades and lines of streets, alleys, pavements and adjoining property; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the Site; locations, dimensions, and complete data pertaining to existing buildings, other improvements, and trees; and full information concerning available service and utility lines, both public and private, above and below grade, including inverts and depths.

  • SERVICE LEVEL DESCRIPTION The Fund Accounting Agreement is hereby amended by deleting the Service Level Description attached thereto and replacing it in its entirety with the Service Level Description attached hereto.

  • Work Description T-804 Opening Roads - Removal of closure devices, cleaning ditches, removing berms, and blading the traveled-way T-811 Closing Roads - Entrance treatment for 150' cross-rip; debris block (slash, earth, berm, rocks, etc.) + seed + water bar T-811 Closing Roads - Water bar frequency per BMPs for remainder of road T-811 Closing Roads - Engineering Rep. or Construction Inspector must be notified prior to performing closeout NFSR Road No. Lane Width & Maintenance Level Mile Marker Begin End 9312 Single Lane / Level 1 NFSR 300 0.00 END 0.40

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.

  • Course Description The Chief Academic Officer of any participating community college or university may request that a course be removed from the CAA transfer list. Both a community college and a university must partner to request the addition of a course to the transfer list. The university endorsement signifies that the university accepts the course and believes the course should be recommended for statewide consideration. Name of the Community College: Name of UNC Senior Institution: would like for the above course to be added to the CAA transfer course list with a status of: Pre-Major/Elective General Education or UGETC for the following discipline: Communications Humanities/Fine Arts Math Social/Behavioral Science Science would like for the above course to be deleted from the CAA transfer course list Please provide rationale for the course addition or deletion: (additional page may be utilized) Signature of Chief Academic Officer NCCCS College Date Signature of Chief Academic Officer UNC Senior Institution Date Please submit the completed and signed request to all of the following three representatives: Xxxx Xxxxxxx, Ed.D. Xxxxxx Xxxxxxxx, M.D. Senior Vice President, Programs Senior Vice President for Academic Affairs Academic and Student Services Academic Affairs North Carolina Community College System UNC-General Administration 5016 Mail Service Center Xxxx Xxxxxx Xxx 0000 Xxxxxxx, XX 00000-0000 Xxxxxx Xxxx, XX 00000 Xx. Xxxxxxx Xxxxxxx Director for Student Development and Association of Student Governments Advisor UNC General Administration X.X. Xxx 0000 Xxxxxx Xxxx, XX 00000 Upon receipt of the form, either Vice President may indicate endorsement of the request and send the request to the Transfer Advisory Committee for action a minimum of thirty days prior to the TAC meeting. The NC Community College System Office will solicit a response from all community colleges approved to offer the course and include the results of the vote along with their endorsement. The CAO at UNC may seek input from its respective campuses as deemed appropriate. Please Note: New, proposed courses that are not currently in the NC Community College Combined Course Library must first be submitted to the NCCCS Curriculum Review Committee, by a community college, accompanied by a request for addition to the Combined Course Library. Please see Section 15 of the Curriculum Procedures Reference Manual at: xxxx://xxx.xxxxxxxxxxxxxxxxxxx.xxx/academic- programs/curriculum-procedures-reference-manual-cprm Comprehensive Articulation Agreement Transfer Course List Change of Course Status to Universal General Education Transfer Component (UGETC) Form CAA02

  • Project Summary The main objective of the LIFE GAIA Sense project is to demonstrate Gaiasense, an innovative “Smart Farming” (SF) solution that aims at reducing the consumption of natural resources, as a way to protect the environment and support Circular Economy (CE) models. More specifically, this project will launch 18 demonstrators across Greece, Spain and Portugal covering 9 crops (olives, peaches, cotton, pistachio, potatoes, table tomatoes, industrial tomatoes, grapes, kiwi) in various terrain and microclimatic conditions. They will demonstrate an innovative method, based on high-end technology, which is suitable for being replicated and will be accessible and affordable to Farmers either as individuals or collectively through Agricultural Cooperatives. Moreover, LIFE GAIA Sense aims to promote resource efficiency practices in SMEs of the agricultural sector and eventually, contribute to the implementation of the Roadmap to a Resource Efficient Europe. This project will demonstrate a method on how the farmer will be able to decide either to use or avoid inputs (irrigation, fertilizers, pesticides etc.) in a most efficient way, without risking the annual production. The focus is on the resource consumption reduction side of CE, and the results will be both qualitatively and quantitatively, considering the resources’ efficiency in agricultural sector.

  • Detailed Description of Services / Statement of Work Describe fully the services that Contractor will provide, or add and attach Exhibit B to this Agreement.

  • Product Description The lead products covered by this Settlement Agreement are limited to following Amazon Identification Number (ASIN) B07CZ1Z8QK, with the description, "63/37 Rosin Core Solder Wire Flux 2% Tin Lead Solder Iron Welding Wire Reel 0.5mm-2.0mm 50g/100g," which was offered for sale by the Settling Entity on xxxxxx.xxx, hereinafter the “Product” or “Products.”

Time is Money Join Law Insider Premium to draft better contracts faster.