Standard XXXX Control Strategies Sample Clauses

Standard XXXX Control Strategies. Greedy Operation In this particular case, we will use a greedy strategy, where the goal is to maximize self-consumption by storing as much of the excess energy from renewable sources as possible. This is the simplest operation strategy possible, as it determines the residual load (i.e., the difference between production and consumption) and instantly actuates the XXXX accordingly by storing excess production until the XXXX is fully charged or supplying the excess demand from the XXXX until it is fully discharged. Figure 2.4 shows the flowchart of the greedy strategy.
AutoNDA by SimpleDocs
Standard XXXX Control Strategies. Greedy Operation and Rule Based Arbitrage This strategy is very similar to the standard XXXX control strategies that will be tested in the domestic UPACs. The only difference is that the XXXX will be pre-charged from the grid, based on a pre-defined set of rules. In this operation strategy, the rules will be defined taking into consideration only the past consumption data, and will be changed a pre-defined number of times. The number of times in which the rules will be changed will be also defined based on past consumption data, with the minimum period set for one week. I.e., in one year, the arbitrage rules can only change 52 times. Additionally, when defining the rules, we will also take into consideration what is best for the local grid, i.e., pre-charge will only be allowed during off-peak periods.

Related to Standard XXXX Control Strategies

  • Financial Management System Subrecipient shall establish and maintain a sound financial management system, based upon generally accepted accounting principles. Contractor’s system shall provide fiscal control and accounting procedures that will include the following:

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).

  • Quality Control Program The Contractor shall describe the Quality Control Program in a written document which shall be reviewed by the Engineer prior to the start of any production, construction, or off-site fabrication. The written Quality Control Program shall be submitted to the Engineer for review at least ten (10) calendar days before the start of construction. The Quality Control Program shall be organized to address, as a minimum, the following items:

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • PERFORMANCE MANAGEMENT SYSTEM 5.1 The Employee agrees to participate in the performance management system that the Employer adopts or introduces for the Employer, management and municipal staff of the Employer.

  • Supply Chain Monitoring A copy of the supply chain monitoring process, which should include details of the process for monitoring the financial viability of the supply chain (including timing), together with any known risks to supply chain stability and material changes to the supply chain. This should include extracts from Board level meetings, risk registers etc where any of the above items have been discussed. Annex 1 1 Information from Contractors who are not required to submit form AR01 to Companies House

  • Programme Management The Government will establish a programme management office and the Council will be able to access funding support to participate in the reform process. The Government will provide further guidance on the approach to programme support, central and regional support functions and activities and criteria for determining eligibility for funding support. This guidance will also include the specifics of any information required to progress the reform that may be related to asset quality, asset value, costs, and funding arrangements.

  • Program Monitoring and Evaluation (c) The Recipient shall prepare, or cause to be prepared, and furnish to the Association not later than six months after the Closing Date, a report of such scope and in such detail as the Association shall reasonably request, on the execution of the Program, the performance by the Recipient and the Association of their respective obligations under the Legal Agreements and the accomplishment of the purposes of the Financing.”

  • Quality Control Plan Within forty five (45) days after the design development documents are approved, the Design-Builder shall develop a quality control plan for the Project (the “Quality Control Plan”). A draft of the Quality Control Plan shall be submitted to the Department and shall be subject to the Department’s review and approval. The Quality Control Plan shall be tailored to the specific products/type of construction activities contemplated by the GMP Basis Documents, and in general, shall include a table of contents, quality control team organization, duties/responsibilities of quality control personnel, submittal procedures, inspection procedures, deficiency correction procedures, documentation process, and a list of any other specific actions or procedures that will be required for key elements of the Work.

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

Time is Money Join Law Insider Premium to draft better contracts faster.