Semi-Final Utility Inspection Sample Clauses

Semi-Final Utility Inspection. When the contractor has finished the Gas Distribution System Work, the Contractor may, by written notice, request that a semi-final utility inspection be made. The Engineer, along with the Project Coordinator, will determine if the Gas Distribution System Work is ready for semi-final utility inspection. The Engineer, in agreement with the Project Coordinator, will have the final decision on when the Gas Distribution System Work is complete and thereby ready for semi-final utility inspection. If all the Gas Distribution System Work provided for and contemplated by the Contract is found to be complete to the Engineer’s satisfaction and all documents required in connection with the Gas Distribution System Work has been submitted and accepted then, the Contractor may request transfer of the completed Gas Distribution System Work to City of Wrens. Once the new facilities are in service and accepted by the Company, provide written correspondence notifying the Engineer and Owner that utility location services will be the responsibility of City of Wrens. Such partial acceptance shall in no way relieve the Contractor of the responsibility for satisfactory completion of the Contract, or for failure of any portion of the Gas Distribution System Work prior to Final Acceptance of the Project.
AutoNDA by SimpleDocs
Semi-Final Utility Inspection. When the contractor has finished the Gas Distribution System Work, the Contractor may, by written notice, request that a semi-final utility inspection be made. The Engineer, along with the Project Coordinator, will determine if the Gas Distribution System Work is ready for semi-final utility inspection. The Engineer, in agreement with the Project Coordinator, will have the final decision on when the Gas Distribution System Work is complete and thereby ready for semi-final utility inspection. If all the Gas Distribution System Work provided for and contemplated by the Contract is found to be complete to the Engineer’s satisfaction and all documents required in connection with the Gas Distribution System Work has been submitted and accepted then, the Contractor may request transfer of the completed Gas Distribution System Work to City of Louisville. Section 665—Gas Distribution System Once the new facilities are in service and accepted by the Company, provide written correspondence notifying the Engineer and Owner that utility location services will be the responsibility of City of Louisville. Such partial acceptance shall in no way relieve the Contractor of the responsibility for satisfactory completion of the Contract, or for failure of any portion of the Gas Distribution System Work prior to Final Acceptance of the Project.

Related to Semi-Final Utility Inspection

  • Safety Inspection During inspection of County facilities conducted by the State Division of Occupational Safety and Health for the purpose of determining compliance with the California OSHA requirements, an OCEA designated employee shall be allowed to accompany the inspector while the inspector is in the employee's agency/department. The employee so designated shall suffer no loss of pay when this function is performed during the employee's regularly scheduled work hours.

  • Property Inspection The Servicer is required to inspect each Delinquent Mortgaged Property at such time and in such manner as is in accordance with Prudent Servicing Practices. The Servicer must prepare a Property Inspection Report following each inspection. All Property Inspection Reports must be retained by the Servicer and copies thereof must be forwarded to the Master Servicer promptly upon request. All expenses related to the foregoing shall be recoverable by the Servicer from the Principal or from Liquidation Proceeds, Insurance Proceeds, payments on the related Mortgage Loan or any other source relating to the related Mortgage Loan or the related Mortgaged Property. The foregoing shall not preclude the Servicer from recovering such expenses from the Borrower to the extent permitted by applicable law and the related Mortgage Loan Documents.

  • Installation, Inspection, and Maintenance The Contractor is responsible for installation and maintenance of the BMPs as a part of its Bid. The Design Professional shall obtain the services of a qualified testing laboratory to inspect the BMPs in accordance with the permits, the costs of such inspections to be borne by the Owner. In the event of Abnormal Weather Conditions or force majeure, the Contractor shall be compensated for re-installation of BMPs at established Unit Prices.

  • Property Inspections The Servicer shall conduct property inspections in accordance with the milestones of the repair and rehabilitation plan for such Mortgaged Property and prepare Property Inspection Reports on any Mortgaged Property involving property damage over $15,000. The Servicer shall furnish a copy of the repair and rehabilitation plan for such Mortgaged Property to the Master Servicer upon request.

  • SCOPE OF INSPECTION The purpose of the inspection is to report the general condition of the home and identify and disclose major defects and deficiencies of the inspected systems and components which existed at the time of the inspection and which are evident to the inspector upon ordinary visual observation. Minor and cosmetic defects may be listed in the report for maintenance purposes but it is not the intent, nor will the inspection report identify and list all minor and cosmetic defects. The inspection is intended to evaluate systems and components of the primary premises. Included with the inspection is the evaluation of primary attached garages/carports/decks/porches/patios. The inspection does not include evaluation of detached garages/carports/patios/decks or other structures unless explicitly specified. The client is encouraged to accompany the inspector during the inspection. Client participation shall be at the client’s risk for personal injury or damage to person or property for any reason or from any cause. The inspection and report are performed and prepared for the sole, confidential and exclusive use and possession of the client(s). The inspection report is not transferable. Systems and components to be inspected include: exposed and visible foundations and structures, exteriors, roofing, plumbing, electrical, attic, interiors, bathrooms and kitchen, basement and crawlspaces, heating and central air conditioning, and garage or carport. LIMITS OF THE INSPECTION The inspection is limited to the readily accessible and visible systems, equipment and components of the home. The inspector will not dismantle and/or move equipment, systems, furniture, appliances, floor coverings, finished or fastened surfaces or components, personal property or other items to conduct this inspection or otherwise to expose concealed or inaccessible conditions. The inspection will not include destructive testing of any kind.

  • Environmental Inspection at End of Agreement Term A. At Authority’s discretion, at least one hundred and twenty (120) days before the expiration or early termination of the Term as provided herein, Company will conduct an environmental inspection and examination of the Company Premises. At its discretion, Authority may complete environmental reviews to determine if recognized environmental conditions exist that could warrant soil and groundwater sampling. If warranted by the findings of Company or Authority’s inspection or if requested by Authority, a compliance audit or site assessment will be performed within the aforementioned time period by a qualified professional acceptable to Authority who will report the findings to Authority. The cost for professional consulting or engineering services required for such audit will be at the expense of Company. If a site assessment is conducted, Company agrees to pay all associated laboratory and testing fees incurred to test and analyze samples collected during the site assessment process. The Authority may also choose to conduct the compliance audit or site assessment. If the results of the assessment indicate that the Company Premises have been impacted by the release of Hazardous Substances, Company will immediately take such action as is necessary and will provide a substantial guaranty in a form and content acceptable to Authority that Company will clean up the contamination at its own expense, at no expense to Authority, and in accordance with Applicable Laws to the extent that it is obligated to do so by virtue of the foregoing provisions of this Article.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • SITE EXAMINATION Contractor has examined the Site and certifies that it accepts all measurements, specifications and conditions affecting the Work to be performed at the Site. By submitting its quote, Contractor warrants that it has made all Site examination(s) that it deems necessary as to the condition of the Site, its accessibility for materials, workers and utilities, and Contractor’s ability to protect existing surface and subsurface improvements. No claim for allowance of time or money will be allowed as to any other undiscovered condition on the Site.

Time is Money Join Law Insider Premium to draft better contracts faster.