Pumping Stations or Booster Stations Not related to an Expansion Project Sample Clauses

Pumping Stations or Booster Stations Not related to an Expansion Project. The full cost of pumping and booster stations unrelated to an Expansion Project will be allocated to the Member Agencies being served by the facility, based on each Member Agency’s proportionate allocated capacity in the facility. O&M costs for the facility will be paid by those Member Agencies based on their usage of the facility. If the facility serves more than one Member Agency, the facility will be eligible for ownership by CIWW, including capital replacement, once constructed. The following chart summarizes these guiding principles: EXISTING AND POTENTIAL TOTAL SERVICE AGREEMENTS Member Agency Total Service Agreement DMWW Berwick Water Association, Iowa City of Alleman, Iowa City of Cumming, Iowa City of Pleasant Hill, Iowa City of Runnells, Iowa City of Windsor Heights, Iowa Greenfield Plaza Benefited Water District, Iowa Xxxxxx Water District St. Xxxxxxx, Iowa Hartford, Iowa Xenia Rural Water District City of Bagley City of Linden City of Menlo City of Redfield1 City of Dawson1 City of Yale1 Footnote: 1 – Potential future connection EXISTING AND POTENTIAL WHOLESALE RELATIONSHIPS TO BE CONTINUED TO BE COMPLETED ONCE FOUNDING AGENCIES ARE IDENTIFIED Member Agency Wholesale Relationship DMWW Water Development Company City of Altoona + List any other wholesale customers that don’t join CIWW (Unknown at this time) Xxxxxx Water Development Company Xxxxxxxx Camp Xxxxx Xxxxxx Water District Milo, Iowa Martensdale, Iowa Truro, Iowa New Virginia, Iowa St. Marys, Iowa Earlham, Iowa River Oaks Development Deer Hunters Run Development Booneville Mobile Home Park Hartford Mobile Home Park Xxxxxxxxx Mobile Home Park Xenia Rural Water District City of Stuart City of Minburn City of Jamaica City of Dallas Center1 City of DeSoto1 City of Dexter1 Fox Creek Benefited Water District1 Wildwood Estates City of Redfield2 City of Dawson2 City of Yale2 Footnotes: 1 – Emergency connection only 2 – Potential future connection SCHEDULE IV-14 REGIONAL AQUIFER STORAGE AND RECOVERY (ASR) RULES AND REQUIREMENTS The Total ASR capacity and recharge and recovery schedules of CIWW and the Member Agencies, shall be managed by CIWW and the Board to facilitate proper operation of the water production and delivery systems of CIWW and the Member Agencies during periods of ASR facility recharge or recovery and to maximize the benefit of ASR facilities to individual Member Agencies and to the CIWW regional system. The following initial Rules shall apply to ARR facilities and operations until...
AutoNDA by SimpleDocs

Related to Pumping Stations or Booster Stations Not related to an Expansion Project

  • Commingling of Resold Services with Unbundled Network Elements and Combinations of Unbundled Network Elements 6.7.1 To the extent it is Technically Feasible and pursuant to the terms of Section 9.1, CLEC may Commingle Telecommunications Services purchased on a resale basis with an Unbundled Network Element or combination of Unbundled Network Elements.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Participating TO's Interconnection Facilities Construction The Participating TO's Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Participating TO shall deliver to the Interconnection Customer and the CAISO the following “as-built” drawings, information and documents for the Participating TO's Interconnection Facilities [include appropriate drawings and relay diagrams]. The Participating TO will obtain control for operating and maintenance purposes of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades upon completion of such facilities. Pursuant to Article 5.2, the CAISO will obtain Operational Control of the Stand Alone Network Upgrades prior to the Commercial Operation Date.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Access to Network Interface Device (NID 2.4.3.1. Due to the wide variety of NIDs utilized by BellSouth (based on subscriber size and environmental considerations), Mpower may access the on-premises wiring by any of the following means: BellSouth shall allow Mpower to connect its loops directly to BellSouth’s multi-line residential NID enclosures that have additional space and are not used by BellSouth or any other telecommunications carriers to provide service to the premise. Mpower agrees to install compatible protectors and test jacks and to maintain the protection system and equipment and to indemnify BellSouth pursuant to Section 8 of the General Terms and Conditions of this Agreement.

  • Network Resource Interconnection Service (check if selected)