Post Project Water Quality Monitoring Sample Clauses

Post Project Water Quality Monitoring. 7.9.2.1 As mentioned in the Chapter 6 of the EIA report, the additional structures inside the nullah would alter the drainage characteristics of the Xxxx Xxxx Town Nullah though the impact is considered insignificant. However, a post project water quality monitoring is proposed to evaluate the water quality impact induced by the Project.
AutoNDA by SimpleDocs

Related to Post Project Water Quality Monitoring

  • Quality Monitoring 4.2.1. To prepare a Quality Assurance (QA) Plan

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

  • Project Monitoring The Developer shall provide regular status reports to the NYISO in accordance with the monitoring requirements set forth in the Development Schedule, the Public Policy Transmission Planning Process Manual and Attachment Y of the OATT.

  • Quality Management Grantee will:

  • COUNTY’S QUALITY ASSURANCE PLAN The County or its agent will evaluate the Contractor’s performance under this Contract on not less than an annual basis. Such evaluation will include assessing the Contractor’s compliance with all Contract terms and conditions and performance standards. Contractor deficiencies which the County determines are severe or continuing and that may place performance of the Contract in jeopardy if not corrected will be reported to the Board of Supervisors. The report will include improvement/corrective action measures taken by the County and the Contractor. If improvement does not occur consistent with the corrective action measures, the County may terminate this Contract or impose other penalties as specified in this Contract.

  • Infrastructure Improvements The design, redevelopment and construction and completion of certain infrastructure improvements, including sewer, stormwater, electrical and water main improvements, along with other similar improvements.

  • Water Quality 8.1. The Supply shall comply with the quality standards imposed by the Act and the Water Quality Regulations, PROVIDED ALWAYS that where a particular standard is the subject of a legal instrument accepted or issued by the Secretary of State or the Chief Inspector of Drinking Water under the provisions of the Act or the Water Quality Regulations, compliance with the terms of the relevant legal instrument shall be deemed to be compliance with the relevant quality standard imposed by the Act or the Water Quality Regulations (as the case may be), in which case the Water Company shall provide the New Appointee with a certified copy of any such authorised departure or undertaking. Each party undertakes to keep the other party fully informed of any discussions which take place at any time hereafter with the Secretary of State for the proposed issue of a legal instrument and of the outcome thereof.

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • CONSTRUCTION AND RELATED ENGINEERING SERVICES A. General construction work for buildings (CPC 512) 1) Unbound* 2) None 3) None 1) Unbound* 2) None 3) None

Time is Money Join Law Insider Premium to draft better contracts faster.