Pondération Sample Clauses

Pondération. Afin de compenser les écarts entre la population d’étudiants de première année des universités participantes et la population de l’échantillon, nous avons pondéré les résultats dans chaque section et dans chaque tableau de ce rapport (hormis la section 1.0). Le tableau 3 indique les poids appliqués. Table 3 : Poids appliqués Université Population d’étudiants de dernière année Questionnaires remplis Poids appliqués Population % de la population Population % de la population Acadia University 744 1.0 278 1.5 0.66622 Xxxxxxx University 112 0.2 65 0.4 0.428938 Athabasca University 20 0.0 9 0.0 0.553194 Xxxxxxx University 561 0.8 160 0.9 0.872836 Xxxxx University 2 939 4.0 213 1.2 3.434864 Xxxxxx University 84 0.1 36 0.2 0.580853 Cape Breton University 384 0.5 226 1.2 0.422973 Capilano University 262 0.4 45 0.2 1.449367 Carleton University 4 209 5.8 1 264 7.0 0.828937 Concordia University 4 482 6.2 880 4.9 1.267882 Concordia University of Edmonton 360 0.5 138 0.8 0.649401 Dalhousie University 2 262 3.1 767 4.2 0.734153 Lakehead University 801 1.1 394 2.2 0.506088 MacEwan University 2 076 2.9 907 5.0 0.569783 Mount Xxxxxxx University 624 0.9 187 1.0 0.830678 Mount Royal University 1 329 1.8 643 3.6 0.514522 Mount Saint Xxxxxxx University 296 0.4 86 0.5 0.856807 Nipissing University 444 0.6 133 0.7 0.831038 Redeemer University College 119 0.2 76 0.4 0.389783 Ryerson University 5 808 8.0 651 3.6 2.220932 Saint Mary's University 879 1.2 262 1.4 0.835174 Xxxxx Xxxxxx University 3 008 4.1 622 3.4 1.203863 St. Xxxxxxx Xxxxxx University 865 1.2 255 1.4 0.844434 St. Mary's University 137 0.2 45 0.2 0.757875 St. Xxxxxx University 393 0.5 205 1.1 0.477231 The King's University 188 0.3 84 0.5 0.557145 Xxxxxxxx Xxxxxx University 810 1.1 376 2.1 0.536274 Trent University 1 351 1.9 376 2.1 0.894452 Trinity Western University 343 0.5 127 0.7 0.672326 Université de Moncton 726 1.0 417 2.3 0.433401 University of Calgary 3 580 4.9 1 378 7.6 0.646731 University of King's College 197 0.3 112 0.6 0.437863 University of Lethbridge 1 033 1.4 588 3.3 0.437333 University of Manitoba 5 134 7.1 230 1.3 5.556709 University of New Brunswick 1 151 1.6 426 2.4 0.672598 University of Northern British Columbia 405 0.6 204 1.1 0.494213 Université d’Ottawa 5 903 8.1 1 477 8.2 0.994906 University of Xxxxxx Xxxxxx Island 725 1.0 300 1.7 0.601598 University of Xxxxxx 1 503 2.1 444 2.5 0.842686 University of Saskatchewan 2 196 3.0 313 1.7 1.746536 University of the Fraser Valley 743 1.0 168 0.9 1.100...
AutoNDA by SimpleDocs

Related to Pondération

  • Pruning Nondestructive thinning of lateral branches to enhance views or trimming, shaping, thinning or pruning of a tree necessary to its health and growth is allowed, consistent with the following standards:

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • PAVING Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase ▪ benchmarks, including TBM set with preliminary survey In addition to the required coordinate information, the following shall be included in all plans, at a minimum, as needed for construction staking on all City projects. ▪ Include copy of plat(s) on all plans, as relevant and approved by the Design Engineer ▪ Benchmarks – minimum of two City standards, four total desirable; as close to project as possible, even if TBM set with preliminary survey. ▪ Benchmark elevations must be in the same datum as the design (i.e. NAV 88 design needs NAV 88 benchmarks, not NAV 29) ▪ All control irons/identified property irons shall be shown on plans, with BL stationing and offset ▪ Show deflection angles in BL, and/or bearing/azimuth of BL sections ▪ Arterial project side streets – provide BL station at CL of intersection of the two streets, on the BL; BL station and offset to CL of side street at removal limits; include deflection angle from BL to CL of side street ▪ Existing FL/pavement grades shown at all match points ▪ Top of curb grades and stationing at all ends-of-return and horizontal/vertical P.I.’s, not just even stationing ▪ CL top of pavement grades for arterial ▪ CL elevation for streets on mass grading work @ 100’ Sta in tangent sections and 50’ on curves.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Classroom Management The certificated classroom teacher demonstrates in his/her performance a competent level of knowledge and skill in organizing the physical and human elements in the educational setting.

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Watering C.10.1. The Contractor shall water lawns, flowers, shrubs, and trees to provide for moisture penetration to a depth of 7 centimeters. If natural precipitation is sufficient to fulfill this requirement, the Contractor may request the COR's permission to suspend watering to avoid too much water in the soil.

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following:

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

Time is Money Join Law Insider Premium to draft better contracts faster.