Planned Architecture overview Sample Clauses

Planned Architecture overview. The EU vEPC is based on Nokia portfolio that consists of the following VNFs:  Mobile gateway: The Cloud Mobile Gateway (CMG) provides the SP-GW, GGSN and Traffic Detention Functions (TDFs), evolved packet data gateway (ePDG) and trusted wireless access gateway (TWAG).  Mobility management: The Nokia Cloud Mobility Manager (CMM) provides the mobility management entity (MME), and SGSN functions.  Policy control and charging: The Nokia Dynamic Services Controller (DSC), built on the patented Agile Rules Technology (A.R.T) rules engine, provides the Policy and Charging Rules Function (PCRF) and wireline Radius/Change of Authorization.  Element and network management: The Nokia 5620 Service Aware Manager (XXX) and Nokia NetAct provide end-to-end network management visibility across the entire mobile network. Registers and DNS / DC Tampere (Nokia) Sp HSS Access S6a S1-MME Multi-RAT Radio Unit S11 5G BRU S5/S8 S1-U EPC / Oulu / DC CWC Oulu PGW SGW MME DNS PCRF Access, Cloud Core, Services... Korean testbed Dedicated Connection Funet => NordUnet => GEANT => TEIN => KOREN
AutoNDA by SimpleDocs

Related to Planned Architecture overview

  • Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Program Overview A. Goals of the Choice Neighborhoods Program. The Choice Neighborhoods Program employs a comprehensive approach to neighborhood transformation. The program transforms neighborhoods of concentrated poverty into mixed-income neighborhoods of long-term viability by revitalizing severely distressed public and/or assisted housing; improving access to economic opportunities; and investing and leveraging investments in well-functioning services, effective schools and education programs, public assets, public transportation, and improved access to jobs. Choice Neighborhoods ensures that current residents benefit from this transformation by preserving affordable housing in the neighborhood or providing the choice to move to affordable housing in another neighborhood of opportunity. The purpose of this grant is to implement a Transformation Plan that has been developed through a local planning process and furthers the goals of the Choice Neighborhoods Program. The core goals of Choice Neighborhoods are:

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Program Narrative All restricted xxxxxx courses which are taught for the purpose of qualifying an individual for restricted xxxxxx license to practice barbering shall consist of a minimum of 1200 hours of training to prepare each restricted xxxxxx to service their communities.

  • LOT OVERVIEW This Contract encompasses the Lots listed in Appendix D – Contractor and Reseller Information. The following descriptions, as applicable, delineate the scope of the awarded Lots.

Time is Money Join Law Insider Premium to draft better contracts faster.