Moisture for West Kentucky Coal Sample Clauses

Moisture for West Kentucky Coal. A moisture penalty or premium shall be applied to West Kentucky Coal at the rate of $**** per ton for each ****% which is above ****% or below ****%, as the case may be, fractions pro rata, measured as an “as received” monthly weighted average (rounded to **** percent). No penalty or premium will be applied to Coal ranging between ****% and ****% moisture. This penalty or premium shall be applied on a monthly weighted average basis to all West Kentucky Coal shipped, including base load West Kentucky Coal, AQR, or Substitute Coal.
AutoNDA by SimpleDocs

Related to Moisture for West Kentucky Coal

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Mineral Reserves and Resources The most recent estimated, proven and probable mineral reserves and the estimated measured, indicated and inferred mineral resources of Yamana disclosed in Yamana Documents have been prepared and disclosed in all material respects in accordance with all applicable Laws. There has been no material reduction (other than as a result of operations in the ordinary course of business) in the aggregate amount of estimated mineral reserves and estimated mineral resources of Yamana on a consolidated basis from the amounts disclosed publicly by Yamana.

  • Electrical Power CUSTOMER acknowledges that the Services will not function in the absence of electrical power.

  • Notice of Sales of Oil and Gas Properties In the event the Borrower or any Subsidiary intends to sell, transfer, assign or otherwise dispose of any Oil or Gas Properties or any Equity Interests in any Subsidiary in accordance with Section 9.12, prior written notice of such disposition, the price thereof and the anticipated date of closing and any other details thereof requested by the Administrative Agent or any Lender.

  • PROJECT FINANCIAL RESOURCES i) Local In-kind Contributions $0 ii) Local Public Revenues $0 iii) Local Private Revenues iv) Other Public Revenues: $0 - ODOT/FHWA $0 - OEPA $0 - OWDA $850,000 - CDBG $0 - Other $0 SUBTOTAL $850,000 v) OPWC Funds: - Grant $400,000 - Loan $400,000 SUBTOTAL $800,000 TOTAL FINANCIAL RESOURCES $1,650,000 b) PROJECT ESTIMATED COSTS:

  • Gas If Customer has selected a Gas Fixed Rate, Customer’s Price will be based on the Fixed Rate(s), plus the Administration Charge, set forth in the Application, which includes RITERATE ENERGY’s compressor fuel and transportation charges, administrative and transaction costs and the Gas Balancing Amount and any Regulatory Charges (defined below).

  • Air and Water Subrecipient agrees to comply with the following regulations in so far as they apply to the performance of this Contract: Clean Air Act, 42 U.S.C., 1857, et seq. Federal Water Pollution Control Act, as amended, 33 U.S.C. 1251, et seq. Environmental Protection Agency (EPA) regulations pursuant to 00 XXX 00 xxx 00 XXX 00.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from CBB to Verizon, CBB, at CBB’s own expense, shall:

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • ELECTRICAL SERVICES A. Landlord shall provide electric power for a combined load of 3.0 xxxxx per square foot of useable area for lighting and for office machines through standard receptacles for the typical office space.

Time is Money Join Law Insider Premium to draft better contracts faster.