Maintenance of Lot Grading Sample Clauses

Maintenance of Lot Grading. The facilities and Works required by Section 6 shall be provided and maintained by the Developer or subsequent owner of each lot from time to time at such party’s sole risk and expense. Should, for any reason, the Developer or subsequent Owner fail to maintain the lot grading, they acknowledge that the Town, or in the case of a subsequent Owner, the Town or the Developer may enter onto said property to correct any drainage issues. The cost for any such correction completed by the Town will be at the expense of the subsequent Owner and the Town may recover such expense under Section 427 of the Municipal Act in the same manner as taxes.
AutoNDA by SimpleDocs

Related to Maintenance of Lot Grading

  • Maintenance of Rating Since the execution of this Agreement, there shall not have been any decrease in or withdrawal of the rating of any securities of the Company or any of its subsidiaries (including the Bank) by any “nationally recognized statistical rating organization” (as defined for purposes of Section 3(a)(62) of the 0000 Xxx) or any notice given of any intended or potential decrease in or withdrawal of any such rating or of a possible change in any such rating that does not indicate the direction of the possible change.

  • Facility Maintenance Seller shall perform, or cause to be performed, all scheduled and unscheduled maintenance required on the Facilities in order to meet the Warranty Specifications and Performance Standards. In that regard, Seller’s responsibilities hereunder shall include, without limitation, promptly correcting any Bloom System or BOF malfunctions, either by (i) recalibrating or resetting the malfunctioning Bloom System or BOF, or (ii) subject to Section 5.7(b), repairing or replacing Bloom System or BOF components which are defective, damaged, worn or otherwise in need of repair or replacement.

  • MAINTENANCE & REPAIR Tenant agrees that if there is any delay in maintenance or repairs for reasons beyond Landlord's control, this shall have no effect on Tenant's obligations under this lease.

  • MAINTENANCE OF THE PROJECT (11-20-07) (Rev. 1-17-12) 104-10 SP1 G125 Revise the 2012 Standard Specifications as follows: Page 1-35, Article 104-10 Maintenance of the Project, line 25, add the following after the first sentence of the first paragraph: All guardrail/guiderail within the project limits shall be included in this maintenance. Page 1-35, Article 104-10 Maintenance of the Project, line 30, add the following as the last sentence of the first paragraph: The Contractor shall perform weekly inspections of guardrail and guiderail and shall report damages to the Engineer on the same day of the weekly inspection. Where damaged guardrail or guiderail is repaired or replaced as a result of maintaining the project in accordance with this article, such repair or replacement shall be performed within 7 consecutive calendar days of such inspection report. Page 1-35, Article 104-10 Maintenance of the Project, lines 42-44, replace the last sentence of the last paragraph with the following: The Contractor will not be directly compensated for any maintenance operations necessary, except for maintenance of guardrail/guiderail, as this work will be considered incidental to the work covered by the various contract items. The provisions of Article 104-7, Extra Work, and Article 104-8, Compensation and Record Keeping will apply to authorized maintenance of guardrail/guiderail. Performance of weekly inspections of guardrail/guiderail, and the damage reports required as described above, will be considered to be an incidental part of the work being paid for by the various contract items.

  • Maintenance & Repairs 5.1 Lessee shall at all times be responsible for maintaining at its own expense the leased premises in a clean, orderly and safety condition, except as hereinafter provided. Lessee shall be responsible, at its own expense, to clean and maintain all trade fixtures, machinery and equipment furnished by Lessee within the leased premises. Lessee shall be responsible to deposit normal office waste and rubbish at a location at the Central School as designated by Lessor.

  • Maintenance of Equipment The Equipment shall be maintained in good operating condition and repair (reasonable wear and tear excepted) and all necessary replacements of and repairs thereto shall be made so that the value and operating efficiency of the Equipment shall be maintained and preserved. No Borrower shall use or operate the Equipment in violation of any law, statute, ordinance, code, rule or regulation. Each Borrower shall have the right to sell Equipment to the extent set forth in Section 4.3 hereof.

  • Maintenance Requirements The Contractor shall ensure and procure that at all times during the Maintenance Period, the Project Highway conforms to the maintenance requirements set forth in Schedule-E (the “Maintenance Requirements”).

  • MAINTENANCE OF CONDITIONS Conditions of employment in effect at the execution of this Agreement shall, except as improved herein, be maintained during the term of this Agreement.

  • MAINTENANCE OF THE SAID PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project until the taking over of the maintenance of the project by the association of allottees upon the issuance of the completion certificate of the project. The cost of such maintenance has been included in the Total Price of the Xxxx.

  • Maintenance Windows 12.3.23.1 Generally, Qwest performs major Switch maintenance activities off-hours, during certain “maintenance windows”. Major Switch maintenance activities include Switch conversions, Switch generic upgrades and Switch equipment additions.

Time is Money Join Law Insider Premium to draft better contracts faster.