Macau Site Sample Clauses

Macau Site. At such time as (i) the forecasted requirements by CYDEX for CAPTISOL pursuant to its FORECASTS equal or exceed [***] for any CONTRACT YEAR, or (ii) HOVIONE determines to be necessary or advisable and CYDEX does not unreasonably withhold approval, HOVIONE at its sole expense shall establish a second manufacturing facility for CAPTISOL at its Macau site capable of producing [***] of CAPTISOL per year and shall validate such site to permit the manufacture and supply of CAPTISOL at such site in accordance with the terms and conditions of this AGREEMENT, all on a timely basis for delivery of all quantities of CAPTISOL ordered by CYDEX hereunder. For the avoidance of doubt, there will be no reimbursement by CYDEX to HOVIONE for the costs and expenses of HOVIONE related to the Macau site, including without limitation engineering fees. Prior to use of the Macau facility for the production of CAPTISOL, such facility shall have passed inspection and audit by CYDEX for compliance with IPEC GMPs, FDA cGMPs, ICH GUIDELINES and other relevant guidance documents issued by IPEC, FDA and ICH. In consideration for HOVIONE having established a second facility to manufacture CAPTISOL, HOVIONE shall be free to choose to manufacture CAPTISOL in either facility as long as all quality and compliance requirements are met. From and after such time as HOVIONE begins to use its Macau site for the manufacture of CAPTISOL, HOVIONE shall at all times maintain an annual manufacturing capacity suitable to meet CYDEX’s expected requirements of CAPTISOL up to [***].

Related to Macau Site

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for: (a) acquiring and providing Right of Way on the Site in accordance with the alignment finalised by the Authority, free from all encroachments and encumbrances, and free access thereto for the execution of this Agreement; and (b) obtaining licences and permits for environment clearance for the Project Highway.

  • Sites 11.1 To enable Digital Origin to fulfill its obligations under any Contract: 11.1.1 the Client shall permit or procure permission for Digital Origin and any other person(s) authorised by Digital Origin to have reasonable access to the Client’s Sites, Equipment and/or Leased Equipment and any other relevant telephone system and other equipment and shall provide such reasonable assistance as Digital Origin requests. 11.1.2 Digital Origin will normally carry out work by appointment and during Normal Working Hours but may request the Client to (and the Client shall) provide access at other times. In the event that the Client cancels, reschedules or misses any pre-arranged appointment, it shall be liable to Digital Origin for any costs and expenses which Digital Origin incurs as a result of such cancellation, rescheduling and/or missed appointment. 11.2 At the Client’s request, Digital Origin may agree (at its sole discretion) to work outside Normal Working Hours and the Client shall pay Digital Origin’s reasonable charges for complying with such a request. 11.3 The Client warrants, represents and undertakes that it has adequate health and safety provisions in place at its Sites. 11.4 The Client shall procure all consents, licences and permissions necessary from landlords or other third parties for the carrying out of preparation work, installation of Equipment and/or Leased Equipment and for the provision, use and operation of the Equipment and/or Leased Equipment and/or Services at the Sites (save to the extent Digital Origin has agreed in writing to do it). 11.5 In the event that the Client is not able to procure the necessary consent to provide the Services within ninety days of the Connection Date Digital Origin will be able to terminate the Contract forthwith by giving the Client written notice without any liability. If the Client has not managed to procure the necessary consents and Digital Origin has commenced work the Client shall, on request by Digital Origin, refund to Digital Origin the cost of all such work (including, without limitation, staff costs and equipment costs) of an amount no less than £500 as Early Termination Charges. 11.6 The Client shall provide Digital Origin with the site and building plans (to include full details of all internal cabling runs) of the Sites and provide Digital Origin with full details of all other services in the vicinity of the proposed works. 11.7 The Client is responsible for making the Site good after any work undertaken by Digital Origin at a Site, including without limitation replacing and re-siting items and for re-decorating. 11.8 If the Client is moving a Site, Digital Origin must be informed as soon as is reasonably practicable so that suitable arrangements can be made to transfer the Client’s Services and Equipment and/or Leased Equipment. Unless otherwise requested, Digital Origin, in addition to moving the Service and Equipment and/or Leased Equipment, will also endeavour (but cannot guarantee that it will be able, for example where the Client moves to a different exchange) to retain the Client’s relevant existing telephone number(s). If Digital Origin can transfer the Client’s existing number(s) to the new Site the existing Contract will continue under the same terms and conditions. If Digital Origin cannot transfer the Client’s existing number(s) to the new Site, installation of a new line will be required at the new Site, or if the Client requires any additional new lines, this will attract new line connection charges and a new Contract. 11.9 If the new installation or moving Site involves the visit of an engineer to facilitate the new installation the Client will be responsible for the costs incurred by Digital Origin for the appointment together with an administration fee in respect of any additional works required to be undertaken by Digital Origin to complete the transfer of the Services and Equipment and/or Leased Equipment. 11.10 If the Client moves Sites and leaves the Equipment and/or Leased Equipment for the new owner/tenant the Client is required to inform them that the Service will be discontinued if Digital Origin is not contacted by the new owner/tenant within 72 hours for the purpose of entering into a new contract with Digital Origin for such services and subject in any event to the agreement of such a contract. 11.11 If at the new Site the Client receives services from an alternative supplier the Client is responsible for any contractual agreement the Client has with them and any liabilities the Client may incur for terminating such agreement.

  • Site Lands or areas indicated in the Contract Documents as being furnished by the Owner upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by the Owner that are designated for the use of the Contractor. Also referred to as Project Site, Job Site and Premises.

  • Site Data (i) The Contractor shall be deemed to have inspected and examined the Site and its surroundings and to have satisfied himself before entering into the Agreement in all material respects including but not limited to: (a) the form and nature of the Site (including, inter-alia, the surface and sub- surface conditions and geo-technical factors); (b) the hydrological and climatic conditions; (c) the extent and nature of the works already completed and Materials necessary for the execution and completion of the Works and the remedying of any defects that includes already executed part also. (d) the suitability and the adequacy of the Site for the execution of the Works; (e) the means of access to the Site and the accommodation the Contractor may require; (f) arranging permits as required as per [.] of the Agreement. (g) the requirements of operation and maintenance; and (h) all other factors and circumstances affecting the Contractor's rights and obligations under the Agreement, the Contract Price and Time for Completion.

  • Inspection at Contractor’s Site The Department reserves the right to inspect, or enlist a third-party to perform, at any reasonable time with prior notice, the equipment, product, plant or other facilities of the Contractor to assess conformity with Term Contract requirements and to determine whether they are adequate and suitable for proper and effective Term Contract performance.