Layout Designs of Integrated Circuits Sample Clauses

Layout Designs of Integrated Circuits. Articles 35 to 38 of Section 6/Part II of the TRIPS agreement contains the provisions for protection of rights in respect of Layout Designs of Integrated Circuits. The basis for protecting integrated circuit designs (Topographies) in the TRIPS Agreement is the Washington Treaty on Intellectual Property in Respect of Integrated Circuits, 1989. India is a signatory to this international agreement.
AutoNDA by SimpleDocs

Related to Layout Designs of Integrated Circuits

  • Interfaces Bellcore’s GR-446-CORE defines the interface between the administration system and LIDB including specific message formats. (Bellcore’s TR-NWP-000029, Section 10)

  • Interface A defined set of transmission facilities that separate Load Zones and that separate the NYCA from adjacent Control Areas. Investor-Owned Transmission Owners. A Transmission Owner that is owned by private investors. At the present time these include: Central Xxxxxx Gas & Electric Corporation, Consolidated Edison Company of New York, Inc., New York State Electric & Gas Corporation, Niagara Mohawk Power Corporation, Orange and Rockland Utilities, Inc., and Rochester Gas and Electric Corporation.

  • Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.

  • Network Interface Device (NID) 2.7.1 The NID is defined as any means of interconnection of end-user customer premises wiring to BellSouth’s distribution plant, such as a cross-connect device used for that purpose. The NID is a single-line termination device or that portion of a multiple-line termination device required to terminate a single line or circuit at the premises. The NID features two independent xxxxxxxx or divisions that separate the service provider’s network from the end user’s customer-premises wiring. Each chamber or division contains the appropriate connection points or posts to which the service provider and the end user each make their connections. The NID provides a protective ground connection and is capable of terminating cables such as twisted pair cable.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Access to Network Interface Device (NID 2.4.3.1. Due to the wide variety of NIDs utilized by BellSouth (based on subscriber size and environmental considerations), Mpower may access the on-premises wiring by any of the following means: BellSouth shall allow Mpower to connect its loops directly to BellSouth’s multi-line residential NID enclosures that have additional space and are not used by BellSouth or any other telecommunications carriers to provide service to the premise. Mpower agrees to install compatible protectors and test jacks and to maintain the protection system and equipment and to indemnify BellSouth pursuant to Section 8 of the General Terms and Conditions of this Agreement.

  • Software Components At any time during the contract period of performance, the Government may require the Contractor to remedy any failure of the software to comply with the requirements of this contract. Support shall consist of correction of errors, provision of modifications, improvements, and other products the original manufacturer makes available to the Government without charge. The Government shall also be provided full documentation of changes and/or modifications to the software provided to meet the Government's requirements.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Firmware The Contractor shall deliver firmware required for production acceptance testing in accordance with CDRL A009 Contractor’s Supplier Configuration Management Plan. The Contractor shall use Government furnished software for testing. Deliverable Data Item (See DD-1423): CDRL A009: “Contractor’s Supplier Configuration Management Plan”

  • Interoperability To the extent required by applicable law, Cisco shall provide You with the interface information needed to achieve interoperability between the Software and another independently created program. Cisco will provide this interface information at Your written request after you pay Cisco’s licensing fees (if any). You will keep this information in strict confidence and strictly follow any applicable terms and conditions upon which Cisco makes such information available.

Time is Money Join Law Insider Premium to draft better contracts faster.