Histograms of phase Sample Clauses

Histograms of phase of first harmonic of the diurnal cycle (time given in LT) for grid cells in the tropical band (20S-20N) for TRMM (a & d), EC-Earth-LR (b & e) and EC-Earth-HR (c & f). Top row: land and bottom row for ocean grid cells. Only grid cells with amplitudes larger than 0.2mm are take into account.
AutoNDA by SimpleDocs
Histograms of phase of first harmonic of the diurnal cycle (time given in LT) for grid cells in the tropical band (20S-20N) for TRMM (a & d), ECMWF w/o deep convection (b & e) and ECMWF w/ deep convection (c & f). Top row: land and bottom row for ocean grid cells. Only grid cells with amplitudes larger than 0.2mm are take into account. Results using HadGEM-GC3.1 Observations datasets used are: CMORPH (1998-2018), available up to 60°N at 30min frequency, and has been regridded to the N1280 model grid; TRMM (1999-2010), available up to 50°N at 3 hr frequency; and GPM (2015-2019), available up to 60°N at 30min frequency. It should be noted that using explicit convection at the 10km scale is rather unrealistic – this requires the model to uplift a whole gridbox column of air when convection takes place, not at all like the much smaller scales on which real convection happens. However, as a sensitivity study it still has value to suggest where convection schemes have problems, and what the consequences of these problems may be for the climate simulation. More detail of the explicit convection setup can be found in Field et al. (2018). Similar simulations, with an older model configuration, and analysis can be found in Xxxxx et al. (2015). Mean properties of precipitation

Related to Histograms of phase

  • Production Phase contract period in which the Development and the Production are to be performed.

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Design Phase All Basic Services set forth in the Agreement with the exception of Interdisciplinary Document Coordination Review, conducting a Card Trick session, Value-Engineering services, Estimating services. Bidding Phase • All Basic Services set forth in the Agreement. Construction Phase • All Basic Services set forth in the Agreement. Post-Construction • All Basic Services set forth in the Agreement.

  • Flexible Work Schedule A flexible work schedule is any schedule that is not a regular, alternate, 9/80, or 4/10 work schedule and where the employee is not scheduled to work more than 40 hours in the "workweek" as defined in Subsections F. and H., below.

  • Programming Phase 2.2.1.2. Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Construction Phase Part 1 –

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK Firms and/or individuals that assisted in the development or drafting of the specifications, requirements, statements of work, or solicitation documents contained herein are excluded from competing for this solicitation. This shall not be applicable to firms and/or individuals providing responses to a publicly posted Request for Information (RFI) associated with a solicitation.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

Time is Money Join Law Insider Premium to draft better contracts faster.