HIGHWAY LIGHTING Sample Clauses

HIGHWAY LIGHTING. For maintenance involving combination traffic signal and lighting unit mast arm assemblies and poles, the foundation, traffic signal mast arm assembly, pole lighting arm, luminaire and lighting cable and all signal cable shall be considered part of the traffic signal system and are the responsibility of the DEPARTMENT. The highway lighting system components of each combination mast arm assembly and pole shall be tested for proper operation and physical condition during the intersection cabinet inspection. All costs of repairing or replacing damaged or missing non-standard IDOT highway lighting system equipment is the responsibility of the GOVERNMENTAL BODY.
AutoNDA by SimpleDocs

Related to HIGHWAY LIGHTING

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Moonlighting 24.01 The Company and the Union agree in principle to eliminate the practice commonly referred to as moonlighting.

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

  • Outdoor Lighting 3.8.1 Lighting shall be directed to driveways, parking areas, loading area, building entrances and walkways and shall be arranged so as to divert the light away from streets, adjacent lots and buildings.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Fire Fighting Costs of operating and maintaining the fire-fighting equipments and personnel, if any.

  • Street Lighting 4.4.1 The Developer shall provide streetlights for the entire Subdivision at his sole expense. The type of lighting standard, pole spacing, and installation shall be per Memphis Light, Gas and Water standards. Memphis Light Gas and Water shall bill the City for installation of street lighting per its standards.

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.