Floodways/Floodplains Sample Clauses

Floodways/Floodplains. Does the proposed action encroach on the regulatory floodway of water courses or water bodies, resulting in more than a nominal increase in base flood elevation? Does the proposed action have a significant or adverse impact on floodplain values, or create a significant risk to human life or property? If the proposed action includes construction in Floodplains, check this box:
AutoNDA by SimpleDocs

Related to Floodways/Floodplains

  • Vegetation No trees or other vegetation may be removed from the site without prior approval from the Town, except in accordance with Section 4 above and pursuant to the Annual Plan.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Wetlands When disposing of excess, soil, or other construction materials on public or private property, Contractor shall not fill in or otherwise convert wetlands.

  • Water Provide hot water for lavatory purposes and cold water for drinking, lavatory and toilet purposes.

Time is Money Join Law Insider Premium to draft better contracts faster.