Fire Inspector/Investigator Premium Pay Sample Clauses

Fire Inspector/Investigator Premium Pay. Fire Inspector I, and Senior Fire Inspectors assigned to Fire Inspector/Investigator duty shall receive Fire Inspector/Investigator Premium Pay as follows: Fire Inspector I: $481.28 for the seven (7) day assignment as Fire Inspector/Investigator. Senior Fire Inspector: $632.32 for the seven (7) day assignment as Senior Fire Inspector/ Investigator.
AutoNDA by SimpleDocs

Related to Fire Inspector/Investigator Premium Pay

  • Training Premium Qualified Operators selected by the Employer to train new Operators shall be paid a training premium of 40¢ per hour while engaged in training work.

  • Cooperation with Inspector General Grantee understands its duty, pursuant to Section 20.055(5), Fla. Stat., to cooperate with Florida Housing’s Inspector General in any investigation, audit, inspection, review, or hearing. Grantee will comply with this duty and ensure that any contracts issued under this Agreement impose this requirement, in writing, on its subcontractors.

  • Pregnancy/Birth Allowance (a) A Nurse entitled to pregnancy leave under the provisions of this Agreement, who provides the Employer with proof that she has applied for, and is eligible to receive employment insurance (E.I.) benefits pursuant to Section 22, Employment Insurance Act, S.C. 1996, c.23, shall be paid an allowance in accordance with the Supplementary Employment Benefit (S.E.B.).

  • Office of Inspector General Investigative Findings Expert Review In accordance with Senate Bill 799, Acts 2021, 87th Leg., R.S., if Texas Government Code, Section 531.102(m-1)(2) is applicable to this Contract, Contractor affirms that it possesses the necessary occupational licenses and experience.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Overtime Premium Pay Time and one-half (1 1/2) the employee's straight time rate of pay shall be paid for all hours actually worked in excess of forty (40) hours in any one workweek.

  • Safety Boot Allowance ‌ Effective January 1, 2022, except for temporary and probationary employees, the Employer agrees to pay one hundred and eighty-five dollars ($185.00) in January of each year towards the cost of safety boots for each full time employee requiring them and one hundred ($100.00) dollars for each part time employee requiring them under the Occupational Health and Safety Act and/or by the Employer, provided the Employee is not eligible for safety footwear through the Workplace Safety and Insurance Board.

  • STATEWIDE ACHIEVEMENT TESTING When CONTRACTOR is an NPS, per implementation of Senate Bill 484, CONTRACTOR shall administer all Statewide assessments within the California Assessment of Student Performance and Progress (“CAASP”), Desired Results Developmental Profile (“DRDP”), California Alternative Assessment (“CAA”), achievement and abilities tests (using LEA-authorized assessment instruments), the Fitness Gram with the exception of the English Language Proficiency Assessments for California (“ELPAC”) to be completed by the LEA, and as appropriate to the student, and mandated by XXX xxxxxxxx to LEA and state and federal guidelines. CONTRACTOR is subject to the alternative accountability system developed pursuant to Education Code section 52052, in the same manner as public schools. Each LEA student placed with CONTRACTOR by the LEA shall be tested by qualified staff of CONTRACTOR in accordance with that accountability program. XXX shall provide test administration training to CONTRACTOR’S qualified staff. CONTRACTOR shall attend LEA test training and comply with completion of all coding requirements as required by XXX.

  • Constructability Review Prepare detailed interdisciplinary constructability review within Fourteen (14) days of receipt of the plans from the District that:

  • Geotechnical Investigation Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

Time is Money Join Law Insider Premium to draft better contracts faster.