Engineering Technician Bidding Procedure Sample Clauses

Engineering Technician Bidding Procedure. When a vacant Senior Level position is made available, the Public Works Department shall bid the position in the following manner:
AutoNDA by SimpleDocs

Related to Engineering Technician Bidding Procedure

  • BIDDING PROCEDURE 1.1 Sealed bid, (formal and informal), subject to Instructions and General Conditions and any special conditions set forth herein, will be received in the office of the Purchasing Division, 440 So. 8th St., Lincoln, NE 68508, until the bid closing date and time indicated for furnishing Lancaster County, hereinafter referred to as “County”, the materials, supplies, equipment or services shown in the electronic bid request.

  • Bidding Process 3.1. Bidding shall generally commence based on the sequence of the lot being shown on the PAH Website. However the Auctioneer has the right to vary the sequence without having to give prior notice to the intended bidders.

  • Bidding Phase 3.5.1 OWNER will make Contract Documents available to Bidders. OWNER will determine cost and other terms. OWNER will direct bidding of Contracts (informal, formal, multiple or single prime construction contracts).

  • Technical Specifications 1. A procuring entity shall not prepare, adopt or apply any technical specification or prescribe any conformity assessment procedure with the purpose or effect of creating an unnecessary obstacle to trade between the Parties.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • BIDDING PROCEDURES 4.1. Bidders have to login at EHSAN AUCTIONEERS SDN. BHD. Website using the same registered email 30 minute before Auction Time.

  • Technical Safeguards 1. USAC and the Department will process the data matched and any data created by the match under the immediate supervision and control of authorized personnel to protect the confidentiality of the data, so unauthorized persons cannot retrieve any data by computer, remote terminal, or other means.

  • NEGOTIATING PROCEDURES 4.01 A request for professional negotiations shall be submitted in writing by the SHTA to the Board or its designated representative or by the Board’s designated representative to SHTA before April 1 of the year (approximately 90 calendar days) of the expiration of the existing Agreement. A copy of the notice shall be filed with the State Employment Relations Board. A mutually convenient meeting shall be held by April 15th in which both parties shall exchange negotiation packages which shall include additions to, deletions from or revisions of the existing agreement. No new items shall be introduced for negotiations during said negotiations except what may be mutually agreed upon by both negotiation teams.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

Time is Money Join Law Insider Premium to draft better contracts faster.