EFFECTS OF GROUND WATER PROJECT Sample Clauses

EFFECTS OF GROUND WATER PROJECT. If at any time Petrowax reasonably determines that any work on the Ground Water Project is causing or threatening to cause (1) any disruption, breakdown or malfunction of the on-site treatment plant or (2) the violation of any federal, state or local law or the terms and conditions of any applicable federal, state or local permits (including, without limitation, the NPDES or Pennsylvania Industrial Waste Water Permits at the Emlenton Wax Plant or the McKean Plant), Petrowax may shut down the delivery of services hereunder. Any penalties assessed as a result of actions by Quaker State shall be paid by Quaker State.
AutoNDA by SimpleDocs

Related to EFFECTS OF GROUND WATER PROJECT

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Access to Project Site Redeveloper shall permit the representatives of the City to enter Project Site at any and all reasonable times, as the City may deem necessary for the purposes of this Redevelopment Agreement, including but not limited to work and inspection of all work being performed in connection with the construction of the Redeveloper Improvements. Similarly, the City shall permit Redeveloper such entry upon the public rights of way for such purposes. No compensation shall be payable nor shall any charges be made in any form by any party for the access or inspection provided for in this Section. The City’s right of access granted under this Section shall terminate upon issuance by the City of the Redeveloper’s Certificate of Completion of Redeveloper Improvements. Notwithstanding the above, Redeveloper shall not be relieved of the provisions contained in Chapter 14.29 of the Lincoln Municipal Code regarding the use of streets for private construction purposes.

  • Use of Interconnection Facilities by Third Parties 46 9.9.1 Purpose of Interconnection Facilities 46 9.9.2 Third Party Users. 46

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • ACCESS TO PLANTS AND PROPERTIES Seller shall comply with all the rules and regulations established by Buyer for access to and activities in and around premises controlled by Buyer or Buyer’s customer.

  • Common Facilities Common Facilities shall mean the non-assigned parking areas; lobby; elevator(s); fire stairs; public hallways; public lavatories; all other general Building facilities that service all Building tenants; air conditioning rooms; fan rooms; janitors' closets; electrical closets; telephone closets; elevator shafts and machine rooms; flues; stacks; pipe shafts and vertical ducts with their enclosing walls. Lessor may at any time close temporarily any Common Facilities to make repairs or changes therein or to effect construction, repairs or changes within the Building, or to discourage non-tenant parking, and may do such other acts in and to the Common Facilities as in its judgement may be desirable to improve the convenience thereof, but shall always in connection therewith, endeavor to minimize any inconvenience to Lessee.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.