Division of Responsibility for Control Maintenance & Operation Sample Clauses

Division of Responsibility for Control Maintenance & Operation. (a) All apparatus on the Company’s side of the Exit Point shall be controlled and operated by the Company. Maintenance of all apparatus on the Company’s side of the Exit Points is the Company’s responsibility at the User’s cost.
AutoNDA by SimpleDocs

Related to Division of Responsibility for Control Maintenance & Operation

  • Cost Responsibility for Network Upgrades 9 5.1 Applicability 9 5.2 Network Upgrades 9

  • Maintenance of Services 5.1 Services resold pursuant to this Attachment and BellSouth’s General Subscriber Service Tariff and Private Line Service Tariff and facilities and equipment provided by BellSouth shall be maintained by BellSouth.

  • Maintenance Responsibilities 42. Agency shall, at its own expense, maintain operate, and provide power as needed upon Project completion at a minimum level that is consistent with normal depreciation and/or service demand and throughout the useful life of the Project. The useful life of the Project is defined in the Special Provisions. State may conduct periodic inspections during the life of the Project to verify that the Project is properly maintained and continues to serve the purpose for which federal funds were provided. Maintenance and power responsibilities shall survive any termination of the Project Agreement. In the event the Project will include or affect a state highway, this provision does not address maintenance of that state highway.

  • Responsibility for Content Vendor is solely responsible for administration, content, intellectual property rights, and all materials at Vendor’s website. DIR reserves the right to require a change of listed content if, in the opinion of DIR, it does not adequately represent the Contract.

  • Allocation of Responsibility 6.1 For the purposes of this Schedule 8 responsibility for each minute of delay included in Minutes Delay, each Third Party Train Cancellation, each Diversion, each Failure to Stop and each Planned Service Cancellation shall be allocated according to the responsibility for the incident which caused such Minutes Delay, Third Party Train Cancellation, Diversion, Failure to Stop or Planned Service Cancellation as established in accordance with the following provisions of this paragraph 6.

  • Areas of Responsibility The lateral and vertical limits of the respective areas of responsibility are as follows:

  • Responsibility for Loss In the event the Computer is lost or stolen, the Student and Parent may be billed the full cost of replacement.

  • Delegation of Responsibility Transmission Provider may use the services of subcontractors as it deems appropriate to perform its obligations under this LGIP. Transmission Provider shall remain primarily liable to Interconnection Customer for the performance of such subcontractors and compliance with its obligations of this LGIP. The subcontractor shall keep all information provided confidential and shall use such information solely for the performance of such obligation for which it was provided and no other purpose.

  • CONTRACTOR RESPONSIBILITY FOR SYSTEM AGENCY’S TERMINATION COSTS If the System Agency terminates the Contract for cause, the Contractor shall be responsible to the System Agency for all costs incurred by the System Agency and the State of Texas to replace the Contractor. These costs include, but are not limited to, the costs of procuring a substitute vendor and the cost of any claim or litigation attributable to Contractor’s failure to perform any Work in accordance with the terms of the Contract.

  • CAISO Responsibility The Parties acknowledge that the CAISO is responsible for the efficient use and reliable operation of the CAISO Controlled Grid consistent with achievement of planning and Operating Reserve criteria no less stringent than those established by the Western Electricity Coordinating Council and the North American Electric Reliability Corporation and further acknowledges that the CAISO may not be able to satisfy fully these responsibilities if the Participating Generator fails to fully comply with all of its obligations under this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.