Core Rotations Sample Clauses

Core Rotations. Orientation (5-6 weeks): Orientation to the hospital, pharmacy, drug distribution systems, computer systems, unit dose and IV admixture programs. Resident will also be oriented to the clinical services, policies/procedures, evaluation process within Pharmacademic, residency jobs, graduation requirements, and the drug information/research timeline. This will include multiple meetings with preceptors for focused topic discussions (research pearls, TPN, chemo preparation, crash cart, study medication process, IV pumps, etc). Residents will also be recertified (if needed) in BLS and obtain ACLS.
AutoNDA by SimpleDocs

Related to Core Rotations

  • Backorders 11.8.1 The CO must be notified in writing by the Contractor within 10 days of any and all backordered materials and/or any incomplete services; and the estimated delivery date.

  • Network Upgrades The Transmission Owner shall design, procure, construct, install, and own the Network Upgrades described in Attachment 6 of this Agreement. If the Transmission Owner and the Interconnection Customer agree, the Interconnection Customer may construct Network Upgrades that are located on land owned by the Interconnection Customer. Unless the Transmission Owner elects to pay for Network Upgrades, the actual cost of the Network Upgrades, including overheads, shall be borne initially by the Interconnection Customer.

  • Rotation Where the Employer's designate and the Union's designate at the local level agree that shifts be rotated, the shifts shall be rotated on an equitable basis among the employees involved.

  • FURNITURE CLASSIFICATIONS Furniture classifications include but not limited to: Cafeteria, Dormitory, Library Shelving and Library Related, Lounge, Systems (Modular), School (Classroom), Freestanding, Seating, Filing Systems and Equipment, and Technology Support.

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades.

  • NETWORK CHANGES 3.1. Sprint shall provide notice of network changes and upgrades in accordance with §§ 51.325 through 51.335 of Title 47 of the Code of Federal Regulations. Sprint may discontinue any interconnection arrangement, Telecommunications Service, or Network Element provided or required hereunder due to network changes or upgrades after providing CLEC notice as required by this Section. Sprint agrees to cooperate with CLEC and/or the appropriate regulatory body in any transition resulting from such discontinuation of service and to minimize the impact to customers, which may result from such discontinuance of service.

  • INTEGRATIONS & MODIFICATIONS This Agreement constitutes the whole agreement between the parties. Except as identified in this Agreement, there are no other prior written agreements and no prior or contemporaneous oral agreements that are a part of this Agreement. No modification to this Agreement shall be valid, unless in writing and executed by both parties.

  • Shift Rotation Routine shift rotation is not an approach to staffing endorsed by the Employer. Except for emergency situations where it may be necessary to provide safe patient care, shift rotation will not be utilized without mutual consent. If such an occasion should ever occur, volunteers will be sought first. If no one volunteers, the Employer will rotate shifts on an inverse seniority basis until the staff vacancies are filled.

  • Workloads (a) The parties agree that patient care is enhanced if concerns relating to professional practice, patient acuity, fluctuating Work-Loads and fluctuating staffing are resolved in a timely and effective manner.

  • Revenue Metering The Connecting Transmission Owner’s revenue metering will be located on the generator side of the 115kV breaker at the Xxxxx Solar Collector Substation and will consist of: • three (3) combination current/voltage transformer (“CT/VT”) units (manufacturer and model ABB/Xxxxxxx KXM-550, GE Grid Solutions KOTEF 000.XX, or other equivalent specified by Connecting Transmission Owner); and • one (1) revenue meter. The ratios of the CTs and VTs will be provided by Connecting Transmission Owner upon its review of the Interconnection Customer’s design documents. (Note: Connecting Transmission Owner’s revenue metering CTs and VTs cannot be used to feed the Interconnection Customer’s check meter.) SERVICE AGREEMENT NO. 2556

Time is Money Join Law Insider Premium to draft better contracts faster.