CONTRACTOR DUTIES AND RESPONSIBILITIES - OPERATIONS Sample Clauses

CONTRACTOR DUTIES AND RESPONSIBILITIES - OPERATIONS. CONTRACTOR shall perform the duties and accept the responsibilities set forth below in connection with its operation of REDWOOD COAST TRANSIT. The omission of a duty or responsibility herein below shall not relieve CONTRACTOR of its obligation to perform such duty or accept such responsibility, so long as it is usual, customary and generally accepted within the public transportation industry as being an integral element of operating a fixed route and demand responsive public transportation system of a kind and character such as REDWOOD COAST TRANSIT.
AutoNDA by SimpleDocs
CONTRACTOR DUTIES AND RESPONSIBILITIES - OPERATIONS. CONTRACTOR shall perform the duties and accept the responsibilities set forth below in connection with its operation of PVTA Transportation Services. The omission of a duty or responsibility herein below shall not relieve CONTRACTOR of its obligation to perform such duty or accept such responsibility, so long as it is usual, customary, and generally accepted within the public transportation industry as being an integral element of operating public transportation system and services of a kind and character such as PVTA transportation services.
CONTRACTOR DUTIES AND RESPONSIBILITIES - OPERATIONS 

Related to CONTRACTOR DUTIES AND RESPONSIBILITIES - OPERATIONS

  • General Duties and Responsibilities 1. Responsibilities under the General Conditions of the Contract for Construction: In addition to the responsibilities herein set forth, Consulting Engineer/Architect agrees to be responsible for those matters identified in the General Conditions as being responsibilities of the Consulting Engineer/Architect. Consulting Engineer/Architect specifically acknowledges receipt of a copy of the General Conditions and acceptance of the responsibilities as set forth therein.

  • SERVICES AND RESPONSIBILITIES 2.1 Contractor xxxxxx agrees to perform the services described and for the fee set forth in the Scope of Work. The Contractor shall be solely responsible for the satisfactory and complete execution of the Scope Work. The Contractor shall provide and pay for all labor, materials, equipment, tools, construction equipment and machinery, water, utilities, transportation and other facilities and services necessary for the proper execution and completion of the Scope of Work. The Scope of Work shall generally be performed at the direction of the NMCRA and completed and completed within that certain number of days from the issuance of a Work Order by the NMCRA to the Contractor (the “Term”). Time is of the essence in the performance of all obligations within the Term. Final Completion of the Scope of Work shall be completed prior to the expiration of the Term and the failure of the Contractor to do so shall be a material default under this Agreement. “

  • ROLES AND RESPONSIBILITIES OF EACH PARTY Role of the Commonwealth

  • Duties and Responsibilities (a) The Auction Agent is acting solely as agent for the Company hereunder and owes no fiduciary duties to any other Person by reason of this Agreement.

  • Client’s Responsibilities In addition to other responsibilities herein or imposed by law, the Client shall:

  • Roles and Responsibilities 1. The Donor States shall make funds available in support of eligible programmes proposed by the Beneficiary State and agreed on by the Financial Mechanism Committee within the priority sectors listed in Article 3.1 of Protocol 38c and the programme areas listed in the Annex to Protocol 38c. The Donor States and the Beneficiary State shall cooperate on the preparation of concept notes defining the scope and planned results for each programme.

  • Roles and Responsibilities of the Parties 5.1 The Minister

  • SCOPE OF WORK AND RESPONSIBILITIES 1. Interconnection Customer’s Scope of Work and Responsibilities The Interconnection Customer will design, construct, own, operate and maintain the Interconnection Customer’s Interconnection Facilities and Collection Feeder Lines in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the ISO OATT or applicable NYISO Procedures: NYISO requirements, industry standards and specifications, regulatory requirements, the Connecting Transmission Owner’s applicable Connecting Transmission Owner’s Electric System Bulletins (“ESBs”), provided at the following website: xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric- Specifications, the System Protection and Interconnection Customer Attachment Facilities Electric Installation Specification for Xxxxxxxxx Solar Project provided as Appendix C to the Facilities Study for the Small Generating Facility (“Project Specific Specifications”), as such specifications shall be modified as a result of the Interconnection Customer’s post Facilities SERVICE AGREEMENT NO. 2557 Study modifications to the Interconnection Customer’s Interconnection Facilities, and Good Utility Practice. The Interconnection Customer shall submit all engineering design and electrical specifications associated with the Interconnection Customer’s Interconnection Facilities to the Connecting Transmission Owner for its review and acceptance in accordance with the ESBs and Project Specific Specifications. The metering of any redundant or standby station service provisions at the Xxxxxxxxx Solar Collector Substation shall be added in accordance with the Connecting Transmission Owner’s retail tariff, P.S.C. No. 220, and the Connecting Transmission Owner’s ESB 750. As per the Project Specific Specifications, the Interconnection Customer will install the RTU provided by Connecting Transmission Owner in accordance with Connecting Transmission Owner’s ESBs, indoors and within 15 feet of the meter(s), and remote from: • heavy traffic areas, work areas, and loading areas; • heat producing or high electrostatic or electromagnetic field producing equipment; and • station batteries. (Note: If no indoor facility is available, then installation of the RTU and revenue metering equipment in a dedicated, weatherproof, heated cubicle (accessible only to Connecting Transmission Owner) is acceptable.) For the revenue metering, the Interconnection Customer shall install a meter panel in accordance with the Project Specific Specifications, ESB 752 and ESB 750. The Interconnection Customer shall mount the revenue metering CT/PT units, make grounding connections, and complete all primary wiring. The Interconnection Customer shall install the meter socket enclosure near the Connecting Transmission Owner’s RTU in accordance with the Project Specific Specifications. Additional right-of-way (“ROW”) will be required for the construction, operation, and maintenance of the Line 301 Tap and must accommodate the 125’ x 125’ work pads required for the installation of the new structures. The Interconnection Customer is responsible for obtaining the property/easements needed for the Line 301 Tap line, access roads to/from the Line 301 Tap, and work pads, in accordance with the standards set forth in the Connecting Transmission Owner’s Standards and Requirements Relating to Third Party Acquisition and Transfer of Real Property Interests to Niagara Mohawk Power Corporation for Electric Facilities and Survey Specifications (January 2019). The Interconnection Customer is responsible for all permitting. Upon termination of this Agreement, Interconnection Customer shall be responsible for all costs associated with the decommissioning and removal of the Connecting Transmission Owner’s Interconnection Facilities.

Time is Money Join Law Insider Premium to draft better contracts faster.