Concrete Grout. 2.2.2.1 Concrete grout strength shall be 15 MPa at 28 Days and shall conform to CSA A179; and
AutoNDA by SimpleDocs

Related to Concrete Grout

  • MASONRY 4.1 Storm Shelter Area/Tornado Protection: In new building construction, provide lateral and vertical bracing in the walls around the employee toilet rooms. DIVISION 5 – METALS

  • Trench Rock Trench rock is defined as any material that must be removed from a trench that cannot be excavated with a hydraulic excavator having a bucket curling force rated at not less than 18,300 pounds (Caterpillar Model 215 or equivalent) and occupies an original volume of at least one-half cubic yard.

  • FLOORING All Bed Rooms, Dinning-cum-Living, and would be finished with Ivory Vitrified tiles (24'' X 24'') flooring and 4'' skirting. Bath-room, Kitchen & Balcony would be finished with Ivory Ceramic tiles (12'' X 12'') flooring. The walls of the Toilets/Bathrooms would finish with white glazed tiles in 60'' height. Roof would be finished with roof tiles.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Rippable Rock Rippable rock is defined as any material that can be ripped with a single-tooth hydraulic ripper drawn by a crawler tractor having a minimum draw bar pull rated at not less than 56,000 pounds (Caterpillar D-8K or equivalent) and occupies an original volume of at least one cubic yard.

  • Millwright Xxxxx be to assist and work under the direction and instructions I or A. He will work alone at times performing assignments in keeping with his training. During the course of his year, training must become proficient in good practices in the areas of fitting, aligning, lubricating and the operation of all shop tools and machines. In addition to the foregoing, he will be exposed to and the process of learning techniques required in trouble shooting key production machinery, pipe fitting, basic welding and machining but not be expected to display a high degree of proficiency in these areas at this point. Millwright Must be capable of performing the tasks of fittings, aligning, lubricating an able to operate all shop tools and machines. Must under direction become proficient in basic welding and pipe fitting as well as dismantling and reassembly of plant equipment. Under direction,will continueto develop skills in trouble shooting all plant equipment and improve his skills at machining part and be exposed to basic principles of hydraulics and pneumatic. He may work alone frequently, but occasionally will require direction and instructions form Millwright I or A. Millwright 11: be capable, without direction of fitting, aligning and lubrication and taking apart and reassembling plant equipment. In addition, is expected to be able to weld, operate shop tools and do pipe fitting as required. Must under direction, become proficient at effective methods of trouble shooting and repairing hydraulic, pneumatic and mechanical faults in plant machinery. I: Must be capable without direction of performing all practices under Xxxxxxxxxx Must under directionbecomeproficient at reading and understanding blueprints, all phases of installing new equipment, laying out hydraulic and mechanical drives and meet speed and power requirements correctly. Xxxxxxxxxx "A": Must he capable without direction, of performing all under Xxxxxxxxxx X, and Must take full responsibility for work done by himself or his assistant. Must he in possession of a Millwright Certificate or a Machinist Certificate or Welder Certificate. Millwrightspresently employed in this classification will not be required to have a Certificate.

  • Caisson Rock Caisson Rock is defined as material that must be removed from a shaft which cannot be penetrated faster than two feet per hour (fifteen minute minimum) using a rock auger with bullet-shaped hardened steel teeth (Kennametal bits or equivalent), and the drilling equipment should have the capacity to produce a continuous torque of at least 1,000,000 inch pounds and a downward force of at least 50,000 pounds (a Xxxxxx LLDH in good working condition) for piers up to seventy two inches in diameter. Use of equipment with greater torque or downward force modifies the definition of refusal to be the point at which the equipment cannot penetrate faster than two feet per hour (fifteen minute minimum). In rare cases, refusal may occur on a rock seam or boulder above the general massive rock surface. The compensation for Caisson Rock should include only material that cannot be penetrated by the rock auger at the specified rate.

  • Recruitment Through Jobcentre Plus 5.1 One of the key objectives of the Department for Work and Pensions is to move people from welfare into work. DWP has a Great Britain-wide network of Jobcentre Plus offices that provide job broking services for unemployed people. The Contractor is therefore required to notify Jobcentre Plus when recruiting staff for any entry-level job vacancies located within Great Britain, which may arise from the delivery of their contract to the Authority.

  • Red Hat Enterprise Linux Developer Suite Red Hat Enterprise Linux Developer Suite provides an open source development environment that consists of Red Hat Enterprise Linux with built-in development tools, certain Red Hat Enterprise Linux Add-Ons, Red Hat Enterprise Linux for Real Time, Smart Management and access to Software Maintenance, but no Development or Production Support. If you use any of the Subscription Services or Software associated with Red Hat Enterprise Linux Developer Suite for Production Purposes, or use the Red Hat Enterprise Linux Software Subscription entitlement independently, you agree to purchase the applicable number of Units of the applicable Software Subscription. Red Hat does not provide Production Support or Development Support for Red Hat Enterprise Developer Suite.

  • Industrial Operations Analyst (IOA ‌ The IOA is a GSA Government official who audits Contractor records and conducts Contractor Assistance Visits (CAVs) to the Contractor’s place of business to assist the Contractor with task order reporting, Contract Access Fee (CAF) management, and other general contract administration functions deemed necessary by the Government.