Illustration If DTH OPERATOR has opted for Zee TV on A-xx-Xxxxx Basis and the Monthly Average Active Subscriber Level for a particular month reported by the DTH OPERATOR is 10,000 subscribers for Zee TV, then the Subscription Fee payable by the DTH OPERATOR for that particular month for Zee TV will be calculated as: MRP of ZEE TV = Rs. 22.00 ZEEL’s Share of MRP = Rs. 17.60 (Less of Distribution Margin) Monthly Average Active Subscriber Level for Zee TV reported by DTH OPERATOR = 10,000 subscribers Subscription Fee for Zee TV for that month = Rs. 17.60 x 10,000 = Rs. 1,76,000 Note: The MRP and Subscription Fee mentioned hereinabove is exclusive of applicable taxes and levies.
Example The ASCII label “EXAMPLE” shall be withheld from registration or allocated to Registry Operator at the second level and at all other levels within the TLD at which Registry Operator offers registrations (such second level and all other levels are collectively referred to herein as, “All Levels”). Such label may not be activated in the DNS, and may not be released for registration to any person or entity other than Registry Operator. Upon conclusion of Registry Operator’s designation as operator of the registry for the TLD, such withheld or allocated label shall be transferred as specified by ICANN. Registry Operator may self-‐allocate and renew such name without use of an ICANN accredited registrar, which will not be considered Transactions for purposes of Section 6.1 of the Agreement.
System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.
Service Descriptions Available services for Transitional and Enhanced Supervision Services a. One (1) one-to-one meeting with the Contractor per week for case management services.
Elements Defines the individual components under each indicator
DESCRIPTION OF PROJECT The project for which PSP agrees to provide Professional Services is generally described as [Insert Brief Description of Project] (hereinafter referred to as the “Project”), as further described in Exhibit A, PSP’s Proposal dated [Insert Date and Proposal Number if provided], attached hereto and incorporated herein for all purposes and consisting of [Text] (Insert Number) pages.
Examples (i) The taxpayer has received a statutory notice of deficiency, under I.R.C. Sec. 6212, which entitles the taxpayer to seek Tax Court review of a proposed tax deficiency. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek Tax Court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.
Description of the Project THIS SHOULD BE NO MORE THAN A TWO PARAGRAPH DESCRIPTION THAT PROVIDES A BACKGROUND OF THE PROBLEM, AS WELL AS HOW THE CONTRACTOR INTENDS TO SOLVE THE PROBLEM. KEEP IN MIND THAT THE CONTRACT SHOULD “STAND ON ITS OWN,” I.E. ANYONE SHOULD BE ABLE TO PICK IT UP AND FIGURE OUT WHAT IS GOING ON.)
Data Use Each party may use Connected Account Data in accordance with this Agreement and the consent (if any) each obtains from each Connected Account. This consent includes, as to Stripe, consent it receives via the Connected Account Agreement.
Use of the Software TO THE EXTENT OF A CONFLICT BETWEEN THE PROVISIONS OF THE FOREGOING DOCUMENTS, THE ORDER OF PRECEDENCE SHALL BE (1)THE SIGNED CONTRACT, (2) THE CLICK-ACCEPT AGREEMENT OR THIRD PARTY LICENSE AGREEMENT, AND