BUS TERMINAL AND OPERATIONS Sample Clauses

BUS TERMINAL AND OPERATIONS. G-01 Bus Terminal Location Contractors must either (1) have a functional terminal facility located within ten (10) miles of the City of Milwaukee limits; or (2) have a functional terminal facility located outside ten (10) miles of the City of Milwaukee limits and be able to demonstrate that they have the capacity and ability to respond to an emergency with a maximum response time of thirty (30) minutes after being dispatched.
AutoNDA by SimpleDocs

Related to BUS TERMINAL AND OPERATIONS

  • Management and Operations 15.1 The Operator shall prepare an annual work programme and budget for each Calendar Year during the term of this Agreement. Each such work programme and budget shall set out in reasonable details, the work to be carried out, facilities to be purchased or created, training and employment programme, establishment, salaries and wages, social welfare schemes to be undertaken, and an estimate of the Expenditure to be incurred. The Operator shall present such work programme and budget to the Government and the Working Interest Owners before the start of each Calendar Year and thereafter provide a quarterly update on the implementation of such work programme and budget.

  • Maintenance and Operation Member-Generator agrees to maintain their system and facilities in accordance with applicable manufacturer's recommended maintenance schedule and standard prudent engineering practices. Member-Generator covenants and agrees to operate their system, facilities and equipment so as to minimize the likelihood for a malfunction or other disturbance, damaging or otherwise affecting or impairing Cooperative’s electrical system. Member-Generator shall comply with all applicable laws, regulations, zoning, building codes, safety rules and other environmental regulations or restrictions applicable to the design, installation, operation and maintenance of the Member-Generator's System. Member-Generator must, at least once every year, conduct a test to confirm that Member-Generator’s System automatically ceases to energize the output (interconnection equipment output voltage goes to zero) within two (2) seconds of being disconnected from Cooperative’s electrical system. Disconnecting the Member-Generator’s System from Cooperative’s electrical system at the visible disconnect switch and measuring the time required for the unit to cease to energize the output shall satisfy this test. Member-Generator shall maintain a record of the results of these tests and, upon request by Cooperative, shall provide a copy of the test results to Cooperative. If Member-Generator is unable to provide a copy of the test results upon request, Cooperative shall notify Member- Generator by mail that Member-Generator has thirty (30) days from the date Member-Generator receives the request to provide Cooperative with the results of a test. If Member-Generator does not provide Cooperative with the test results within the thirty (30) day time period or if the test results provided to Cooperative show that Member-Generator’s net metering unit is not functioning correctly, Cooperative may immediately disconnect Member-Generator’s System from Cooperative’s electrical system. If Member-Generator’s equipment ever fails this test, Member-Generator shall immediately disconnect Member-Generator’s System from Cooperative's electrical system. Member-Generator’s System shall not be reconnected to Cooperative's electrical system by the Member-Generator until Member-Generator’s System is repaired and operating in a normal and safe manner. Cooperative shall have the right to have a representative present and informed when any such tests are conducted. Cooperative does not warrant the testing procedures or results by the presence of its representative. Member-Generator is responsible for protecting their equipment from transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits, and from any other causes or events. Therefore, Cooperative shall not be responsible for damage to Member-Generator’s equipment allegedly caused by transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits or other causes or events. Member-Generator agrees to notify Cooperative no less than thirty (30) days prior to modification of the components or design of the Member-Generator’s System that in any way may degrade or significantly alter the System’s output characteristics. Member-Generator acknowledges that any such modifications will require submission of a new Application and Agreement to Cooperative.

  • Variation and Operation Pursuant to and subject to clause 5 of the State Agreement the parties agree to amend the State Agreement in the manner set out in this Agreement.

  • Use and Operation 3.1 Permitted Use ......................................................................................................

  • INTERNET PLANNING, ENGINEERING AND OPERATIONS ‌ Job Title: Internet/Web Engineer Job#: 2620 General Characteristics Integrally involved in the development and support of all Internet/Intranet/Extranet sites and supporting systems. Works closely with other IT groups and customers to define the system design and user interface based on customer needs and objectives. Participates in all phases of the development and implementation process, and may act as a project manager on special projects. Ensures the integration of the Web servers and all other supporting systems. Responsible for system tuning, optimization of information/data processing, maintenance and support of the production environment.

  • Contractual and Operational Compliance Audits (a) ICANN may from time to time (not to exceed twice per calendar year) conduct, or engage a third party to conduct, contractual compliance audits to assess compliance by Registry Operator with its representations and warranties contained in Article 1 of this Agreement and its covenants contained in Article 2 of this Agreement. Such audits shall be tailored to achieve the purpose of assessing compliance, and ICANN will (a) give reasonable advance notice of any such audit, which notice shall specify in reasonable detail the categories of documents, data and other information requested by ICANN, and

  • Delegation and Operation OF TOP–LEVEL DOMAIN; REPRESENTATIONS AND WARRANTIES

  • Application and Operation Subject Matter Clause No.

  • Safe Operations Notwithstanding any other provision of this Agreement, an NTO may take, or cause to be taken, such action with respect to the operation of its facilities as it deems necessary to maintain Safe Operations. To ensure Safe Operations, the local operating rules of the ITO(s) shall govern the connection and disconnection of generation with NTO transmission facilities. Safe Operations include the application and enforcement of rules, procedures and protocols that are intended to ensure the safety of personnel operating or performing work or tests on transmission facilities.

  • ACCESS TO OPERATIONS SUPPORT SYSTEMS 2.1 BellSouth shall provide Max-Tel access to operations support systems (“OSS”) functions for pre-ordering, ordering and provisioning, maintenance and repair, and billing. BellSouth shall provide access to the OSS through manual and/or electronic interfaces as described in this Attachment. It is the sole responsibility of Max-Tel to obtain the technical capability to access and utilize BellSouth’s OSS interfaces. Specifications for Max-Tel ’s access and use of BellSouth’s electronic Version R4Q01: 12/01/01 interfaces are set forth at xxx.xxxxxxxxxxxxxxx.xxxxxxxxx.xxx and are incorporated herein by reference.

Time is Money Join Law Insider Premium to draft better contracts faster.