Additional Development and Construction Covenants Sample Clauses

Additional Development and Construction Covenants. (a) The Supplier agrees that the Facility shall be located in the Province of Ontario. The Supplier agrees that the Facility shall have a Connection Point as set out in Exhibit A and shall affect supply or demand in the IESO-Administered Markets.
AutoNDA by SimpleDocs
Additional Development and Construction Covenants. (a) The Supplier agrees that the Contract Facility shall be located in the Province of Ontario and shall affect supply or demand in the IMO-Administered Markets.
Additional Development and Construction Covenants. (a) The Supplier agrees that the Control Equipment and the Load shall be located in the Province of Ontario and shall affect demand on the IMO-Administered Markets.
Additional Development and Construction Covenants. (a) The Supplier agrees that the Operating Equipment and the Load shall be located in the Province of Ontario and shall affect demand in the IMO-Administered Markets and shall achieve the DSM Project Annual Electricity Savings entirely from Loads located in the Province of Ontario.
Additional Development and Construction Covenants. (a) The Generator shall ensure that the Facility will: (i) be located in the Province of Alberta; (ii) be located at the Site; (iii) affect supply on the AIES or on a Distribution Facility, as applicable; and (iv) otherwise be built in accordance with the features and specifications as outlined in Schedule 1 (as such Schedule may be amended pursuant to Section 2.1(c)), unless the AESO has approved a Facility Amendment. For greater certainty, the installed capacity of the Facility shall not in any event exceed the Contract Capacity.
Additional Development and Construction Covenants. York Region DR Contract Released November 30, 2005

Related to Additional Development and Construction Covenants

  • Definitions and Construction 1 1.1 Definitions.....................................................................................1 1.2

  • Suspension of unsafe Construction Works (i) Upon recommendation of the Authority’s Engineer to this effect, the Authority may by notice require the Contractor to suspend forthwith the whole or any part of the Works if, in the reasonable opinion of the Authority’s Engineer, such work threatens the safety of the Users and pedestrians.

  • Covenants and Conditions; Construction of Agreement All provisions of this Lease to be observed or performed by Lessee are both covenants and conditions. In construing this Lease, all headings and titles are for the convenience of the Parties only and shall not be considered a part of this Lease. Whenever required by the context, the singular shall include the plural and vice versa. This Lease shall not be construed as if prepared by one of the Parties, but rather according to its fair meaning as a whole, as if both Parties had prepared it.

  • Commencement and Completion of Construction The Company shall begin Construction Activities no later than January 1, 2014 (“Commencement Date”) and secure a final Certificate of Compliance by August 27, 2015 (hereinafter, “Completion Date”).

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • ADDITIONAL CONSTRUCTIONS The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority(ies) except for as provided in the Act.

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

  • Performance of Covenants and Agreements The Guarantor hereby agrees to take all lawful action in its power to cause the Tenant duly and punctually to perform all of the covenants and agreements set forth in the Transaction Documents.

  • Construction Phase - Administration of the Construction Contract 1.6.1 The Construction Phase shall commence with the acceptance of the Construction Manager’s Guaranteed Maximum Price (or acceptance of a partial Guaranteed Maximum Price for a stage or phase) and issuance of a Notice to Proceed with Construction Services and terminate sixty (60) days after Final Payment to the Contractor is made, or when all of Architect/Engineer’s services have been satisfactorily performed, whichever occurs later.

  • Performance of Covenants All of the covenants and obligations that the Company is required to comply with or to perform at or prior to the Closing shall have been complied with and performed in all material respects.