Common use of Acts of God Clause in Contracts

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 12 contracts

Samples: Lease (Genzyme Corp), Agreement (Entex Information Services Inc), License Agreement (Media 100 Inc)

AutoNDA by SimpleDocs

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood fire or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining the time during which work shall be completed, whether or such time be designated by a fixed date, a fixed time or "a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 11 contracts

Samples: Lease (Commerce Bancorp Inc /Nj/), Lease (Commerce Bancorp Inc /Nj/), Lease (Commerce Bancorp Inc /Nj/)

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", ," and such time shall be deemed to be extended by the period of such delay.

Appears in 11 contracts

Samples: Oak Technology Inc, Breakaway Solutions Inc, Ezenia Inc

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's ’s reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", ,” and such time shall be deemed to be extended by the period of such delay.

Appears in 11 contracts

Samples: Purchase and Sale Agreement (Cynosure Inc), Office Lease (Exa Corp), Termination Agreement (ConforMIS Inc)

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 5 contracts

Samples: Lease (Netezza Corp), Extension of Lease (Mercury Computer Systems Inc), Disturbance and Attornment Agreement (Genzyme Transgenics Corp)

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood fire or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or "a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 5 contracts

Samples: First Lease (Commerce Bancorp Inc /Nj/), Lease (Commerce Bancorp Inc /Nj/), Lease (Commerce Bancorp Inc /Nj/)

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", ," and such time shall be deemed to be extended by the period of such delay.

Appears in 3 contracts

Samples: Lease Section (Foilmark Inc), Lease (Impac Group Inc /De/), Lease (Impac Group Inc /De/)

Acts of God. In any case where either party hereto is required to do any act, then, except where specifically provided in this Lease to the contrary, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, moratoria, unusually severe weather, or other causes beyond such party's reasonable control which are unrelated to labor difficulties and shortages of labor, materials or equipment shall not be counted in determining the time during which work such act shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 3 contracts

Samples: Lease Agreement (Arqule Inc), Lease (Arqule Inc), Lease (Arqule Inc)

Acts of God. In any case where either party hereto is required to do any actact (other than the payment of Annual Rent and Additional Rent), delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, weather or other causes beyond such party's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", ," and such time shall be deemed to be extended by the period of such delay.

Appears in 2 contracts

Samples: Hartsfield Centre (Vialog Corp), Office Lease Agreement (Call Points Inc)

Acts of God. In any case where either party hereto is required to do any act, other than the payment of Annual Fixed Rent or additional rent, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, unusual government regulations, moratorium or similar acts of government, unusually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining the time during which work such act shall be completed, whether such time be designated by a fixed date, a fixed time or "a "reasonable time", ," and such time shall be deemed to be extended by the period of such delay.

Appears in 2 contracts

Samples: Epix Medical Inc, Epix Medical Inc

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's ’s reasonable control (other than financial) shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", and such time shall be deemed to be extended by the period of such delay. In no event shall any Act of God delay Tenant’s performance of monetary obligations required of Tenant, unless such delay is specifically permitted in this Lease in connection with such performance.

Appears in 2 contracts

Samples: Lease Agreement (SciVac Therapeutics Inc.), Lease Agreement (Targanta Therapeutics Corp.)

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficultiesdifficulties not limited to the Premises or Tenant’s or Landlord’s business operations, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's ’s reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 2 contracts

Samples: Possession and Attornment Agreement (Stratus Technologies International Sarl), Lease (Leslies Poolmart Inc)

Acts of God. In any case where either party hereto is required to do any actact other than the payment of rent, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, unusual government regulations, unusually severe weather, weather or other causes beyond such party's reasonable control shall not be counted in determining the time during which work such act shall be completed, whether such time be designated by as a fixed date, a fixed time or "a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 2 contracts

Samples: Lease Agreement (Harvard Bioscience Inc), Lease Agreement (Cedar Shopping Centers Inc)

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood fire or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, regulations or other causes beyond such party's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time time, be designated by a fixed date, a fixed time or "a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 2 contracts

Samples: Geerlings & Wade Inc, Geerlings & Wade Inc

Acts of God. In any case where either party hereto is required to do any actact (except for the payment of money), delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's ’s reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: Avant Immunotherapeutics Inc

Acts of God. In any case where either party hereto is required to do any actact (other than the payment of money), delays caused by or resulting from Acts of God, war, civil commotion, fire, flood floor or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's reasonable control control, shall not be counted in determining the time during which work such act shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: Lease (Collegium Pharmaceutical, Inc)

Acts of God. In any case where either party hereto is required to do any act, delays other than the payment of Annual Fixed Rent or additional rent, delays, caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials materials, or equipment, unusual government regulations, unusually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining the time during which work such act shall be completed, whether such time be designated by a fixed date, a fixed time or "a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: Benchmark Electronics Inc

Acts of God. 19 20 In any case where either party hereto is required to do any actact or work, delays caused by 21 or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of 22 labor, materials or equipment, government regulations, unusually severe weather, pandemic, or other causes caused beyond such 23 party's ’s reasonable control shall not be counted in determining the time during which such act or 24 work shall be completed, whether such time be designated by a fixed date, a as fixed time or a "25 “reasonable time", ,” and such time shall be deemed to be extended by the period of such delay.. 26

Appears in 1 contract

Samples: Lease Agreement

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's ’s reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: Lease (GTC Biotherapeutics Inc)

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts the occurrence of acts of God, war, civil commotionlabor disputes, fire, flood or other casualtyunusual delays in deliveries, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, unavoidable casualties or other causes beyond such party's the reasonable control of the party claiming such delay shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: BioMed Realty Trust Inc

Acts of God. In any case case, where either party hereto is required to do any act, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining the time during which work such act shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: Lease Agreement (Bertuccis of White Marsh Inc)

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", ," and such time shall be deemed to be extended by the period of such delay, however, in no case will such delay exceed a period of one (1) year.

Appears in 1 contract

Samples: Nashua Corp

Acts of God. In any case where either party hereto is required to do any actact (other than Tenant's obligation to pay rent), delays caused by or resulting from Acts of God, war, civil commotion, fireacts of terrorism, flood fire or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weatherpermitting difficulties, failure to obtain building permit or other causes beyond such party's reasonable control shall not be counted in determining the time during which work such act shall be completed, whether such time be designated by a fixed date, a fixed time or "a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: Lease Agreement (Asure Software Inc)

Acts of God. In any case where either party hereto is required to do do, any act, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, unusual labor difficulties, unusual shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: Thermo Vision Corp

AutoNDA by SimpleDocs

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood floor or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's reasonable control control, shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: By And (APA Enterprises, Inc.)

Acts of God. In any case where either party hereto is required to do any ----------- act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or "a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: Lease Agreement (Organogenesis Inc)

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood fire or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining the time during which work shall be completed, whether or such time be designated by a fixed date, a fixed time or "a "reasonable time", and such time shall be deemed to be extended by the period of such delay*.

Appears in 1 contract

Samples: Commerce Bancorp Inc /Nj/

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipmentequipments, government governmental regulations, unusually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or "a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: High Voltage Engineering Corp

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood fire or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, regulations or other causes causes, to the extent that any of which are beyond such party's reasonable control control, shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or 'a "reasonable time." ", and Financial inability" is expressly excluded as a cause for such time shall be deemed to be extended by the period of such delaydelay in performance.

Appears in 1 contract

Samples: Enterprise Bancorp Inc /Ma/

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually usually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: Sublease Agreement (Sonoma Systems)

Acts of God. In Excepting only the obligation of Tenant to pay any monetary amount due hereunder, in any case where either party hereto is required to do any act, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's reasonable control (other than financial inability) shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: Ilc Technology Inc

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, unusual government regulations, unusually severe weather, or other causes beyond such party's ’s reasonable control shall not be counted in determining the time during which work such act shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", ,” and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: Lease Agreement (Graymark Healthcare, Inc.)

Acts of God. In any case where either party hereto is required to do any actact (other than the payment of money), delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: Broadvision Inc

Acts of God. In any case where either party hereto is required to do any act, excluding the payment of rent or other sum required to be paid by TENANT to LANDLORD hereunder, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood fire or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or "a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: Disturbance Agreement (Community Partners Bancorp)

Acts of God. In any case where either party hereto is required to do ----------- any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", ," and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: Commencement Date Agreement (Averstar Inc)

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, weather or other causes beyond such party's reasonable control shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", ," and such time shall be deemed deed to be extended by the period of such delay.

Appears in 1 contract

Samples: Attornment Agreement (High Speed Access Corp)

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's ’s reasonable control (“Force Majeure”) shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: Haemonetics Corp

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's reasonable control shall not be counted in determining deteimining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", ," and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: Javelin Pharmaceuticals, Inc

Acts of God. In any case where either party hereto is required to do any act, delays caused by or resulting from Acts of God, war, civil commotion, fire, flood floor or other casualty, labor difficulties, shortages of labor, materials or equipment, government regulations, unusually severe weather, or other causes beyond such party's ’s reasonable control control, shall not be counted in determining the time during which work shall be completed, whether such time be designated by a fixed date, a fixed time or a "reasonable time", and such time shall be deemed to be extended by the period of such delay.

Appears in 1 contract

Samples: Lease (Information Architects Corp)