Startup and Test Energy definition

Startup and Test Energy shall have the definition set forth in the Power Purchase Agreement.
Startup and Test Energy means PV System Energy, measured in MWh, and generated prior to the Commercial Operation Date, for which there are certified RECs.
Startup and Test Energy means the energy produced by the Facility prior to the Commercial Operation Date.

Examples of Startup and Test Energy in a sentence

  • All startup and test energy shall be scheduled in accordance with Buyer procedures in Section 6.5. Buyer shall receive any and all Environmental Attributes associated with the Startup and Test Energy, the value of which is included in this Startup and Test Energy price.

  • The purchase price for Replacement Energy is $95.50 per MWh. For the avoidance of doubt, Buyer shall only pay for SCPPA Facility Energy, Excess Energy, Startup and Test Energy or Replacement Energy which is delivered by Seller and received by Buyer at the respective Points of Delivery.

  • Prior to the Commercial Operation Date, the Authorized Representative of each Party will meet periodically to discuss issues related to the sharing of information on the operation and maintenance of the Facility and interconnection facilities, provided, however, except as otherwise provided herein with respect to the scheduling of Startup and Test Energy, that Buyer shall have no right to approve Seller’s schedules or budgets.

  • Our country often runs a trade deficit, not because of trade deals, but because our citizens spend more due to the informal economy and having more money supply in the economy.

  • Buyer shall receive any and all Environmental Attributes associated with the Startup and Test Energy, the value of which is included in this Startup and Test Energy price.


More Definitions of Startup and Test Energy

Startup and Test Energy means the MWh of Energy from the Facility delivered by Seller to Buyer at the Point of Delivery prior to the Commercial Operation Date, but not to exceed, at any time, an amount which is equal to the difference between (i) the Energy delivered at the Point of Delivery from Milford Wind Phase I Facility and (ii) the maximum amount of Energy associated with 200 MW.

Related to Startup and Test Energy

  • Test Energy means Facility Energy delivered (a) commencing on the later of (i) the first date that the CAISO informs Seller in writing that Seller may deliver Facility Energy to the CAISO and (ii) the first date that the PTO informs Seller in writing that Seller has conditional or temporary permission to parallel and (b) ending upon the occurrence of the Commercial Operation Date.

  • Net energy metering means the difference between the kilowatt-hours consumed by a customer-generator and the kilowatt-hours generated by the customer- generator's facility over any time period determined as if measured by a single meter capable of registering the flow of electricity in two directions.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • energy service means the physical benefit, utility or good derived from a combination of energy with energy-efficient technology or with action, which may include the operations, maintenance and control necessary to deliver the service, which is delivered on the basis of a contract and in normal circumstances has proven to result in verifiable and measurable or estimable energy efficiency improvement or primary energy savings;

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Ultra Low Sulfur Diesel Fuel means diesel fuel that has a sulfur content of no more than fifteen parts per

  • Renewable Energy Source means an energy source that is not fossil carbon-based, non- renewable or radioactive, and may include solar, wind, biomass, geothermal, landfill gas, or wave, tidal and thermal ocean technologies, and includes a Certified Renewable Energy Source.

  • renewable energy sources means renewable sources such as small hydro, wind, solar including its integration with combined cycle, biomass, bio fuel cogeneration, urban or municipal waste and other such sources as approved by the MNRE;

  • freezing of economic resources means preventing the use of economic resources to obtain funds, goods or services in any way, including, but not limited to, by selling, hiring or mortgaging them;

  • Net Metering Net metering refers to customers who sell electricity they produce, typically through a rooftop solar panel, back to the utility for credit. If you are a net metering customer, you should not enroll with XOOM because your net metering agreement will not transfer to XOOM once you enroll.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Renewable Energy Standard means the minimum renewable energy capacity portfolio, if applicable, and the renewable energy credit portfolio required to be achieved under section 28 or former section 27.

  • Stand-Alone Test Environment or "SATE" shall have the meaning set forth in Section 12.2.9.3.2.

  • Rechargeable Electrical Energy Storage System (REESS) means the rechargeable energy storage system that provides electric energy for electrical propulsion.

  • STP means the temperature of fifteen degrees Celsius (15°C) and at a pressure of one hundred and one decimal three two five kilopascals (101.325 kPa).

  • Solar energy system means a system of components that produces heat or electricity, or both, from

  • Genetic resources means genetic material of actual or potential value;

  • Wind Turbine means a mechanical/electrical system that converts the kinetic energy of blowing wind into mechanical or electric power.

  • Percolation test means a subsurface soil test at the depth of a proposed absorption system or similar component of an OWTS to determine the water absorption capability of the soil, the results of which are normally expressed as the rate at which one inch of water is absorbed. The rate is expressed in minutes per inch.

  • Renewable energy system means a fixture, product, device, or interacting group of fixtures, products, or devices on the customer's side of the meter that use 1 or more renewable energy resources to generate electricity. Renewable energy system includes a biomass stove but does not include an incinerator or digester.

  • Natural Resources Assistance Council means the natural resources assistance council created pursuant to Ohio Revised Code Section 164.21 as well as its members and officers.

  • Basic gas supply service means gas supply service that is

  • Eligible Renewable Energy Resource or “ERR” has the meaning set forth in California Public Utilities Code Section 399.12 and California Public Resources Code Section 25741, as either code provision is amended or supplemented from time to time.