Examples of Snowy Scheme in a sentence
The purpose of this Schedule is to make arrangements for sharing between New South Wales, South Australia and Victoria of water made available in the catchment of River Murray above Hume Dam by the Snowy Scheme.
NSW holds 58 per cent of the issued shares in SHL (all of which are fully paid up) and it has entered into guarantees, indemnities and deeds as part of the agreements leading to the corporatisation of the Snowy Scheme.
Following corporatisation of the Snowy Scheme, a new Schedule G was inserted into the MDB Agreement.
In this Agreement, "Murray to Murrumbidgee Inter-Valley Transfer" means the volume of Water Available to the Snowy-Murray Development released by the Snowy Scheme to the catchment of the Murrumbidgee River.
The compensation deed terminates on the expiry or revocation of the Snowy Water Licence.• Under the Snowy Scheme Deed of Indemnity, if a release by SHL of ‘Snowy River Increased Flows’ (environmental flows or a ‘Flushing Flow’ under an instruction from the Water Administration Ministerial Corporation) causes spills or downstream damage, the Crown Entity will compensate SHL for the proportion of claims it incurs, to the extent of its share of the cost.
This will increase the current Snowy Scheme generation capacity by almost 50%.
While there is a balance in the Mowamba Borrow account (that is, the Borrow is not repaid), the Snowy Scheme will run out of water earlier in a dry inflow sequence than it otherwise would have in terms of being able to maintain western river releases.
Clearly, this approach would turn the utility of the 12(b)(6) procedure on its head, in particular in the context of § 101, which is primarily focused on the “allegations” in the patent—the claims and written description.
These challenges relate to rising energy costs, a deterioration in the energy systems reliability, and a transition away from coal-fired, dispatchable, base-load power to intermittent renewable wind and solar power.Snowy 2.0 involves linking Talbingo and Tantangara reservoirs within the existing Snowy Mountains Hydro-electric Scheme (Snowy Scheme) and building an underground power station between the two reservoirs.
It is important to note that electricity generation is inseparably linked to Snowy Scheme water releases because the only practical way to release water from the Snowy Scheme is by generating electricity through the Snowy Scheme’s turbines.