Runoff Controls definition

Runoff Controls means BMPs that are designed to control the peak volume and flow rate or to prevent scour due to concentrated flows.
Runoff Controls means BMPs that are designed to control the peak volume and flow rate or to prevent scour due to concentrated flows.w. Sediment means mineral or organic matter, typically deposited by water, air, or ice.x. Site means the area where the construction activity is physically located or conducted.y. Stormwater Conveyance means a sewer, ditch, or swale that is designed to carry stormwater; a stormwater conveyance may also be referred to as a storm drain or storm sewer.z. Stormwater as defined by 40 CFR §122.26(b)(13) means stormwater runoff, snow melt runoff, and surface runoff and drainage.aa. Surface Runoff means that portion of stormwater that does not infiltrate into the ground or evaporate, but instead flows onto adjacent land or watercourses or is routed to stormwater conveyance systems.bb. Surface Water means all water naturally open to the atmosphere (for example, rivers, lakes, reservoirs, ponds, streams, impoundments, oceans, estuaries, springs, etc.).cc. Total Maximum Daily Load or TMDL means a calculation of the maximum amount of a pollutant that a waterbody can receive and still meet state water quality standards. It is the sum of the allowable loads of a single pollutant from all contributing point and nonpoint sources. Percentages of the TMDL areallocated by DEQ to the various pollutant sources.dd. Turbidity means the optical condition of waters caused by suspended or dissolved particles or colloids that scatter and absorb light rays instead of transmitting light in straight lines through the water column.Turbidity may be expressed as nephelometric turbidity units (NTUs) measured with a calibrated turbidity meter.ee. Underground Injection Control means any system, structure, or activity that is created to place fluid below the groundor sub-surface (for example, sumps, infiltration galleries, drywells, trench drains, drill holes, etc.)ff. Water or Waters of the State as defined by ORS 468B.005(8) means lakes, bays, ponds, impounding reservoirs, springs, wells, rivers, streams, creeks, estuaries, marshes, inlets, canals, the Pacific Oceanwithin the territorial limits of the State of Oregon and all other bodies of surface or underground waters, natural or artificial, inland or coastal, fresh or salt, public or private (except those private waters whichdo not combine or effect a junction with natural surface or underground waters), which are wholly or partially within or bordering the state or within its jurisdiction. SCHEDULE FNPDES GENERAL CONDITION...

Examples of Runoff Controls in a sentence

  • Post-construction Stormwater Runoff Controls for New Development a.

  • BMPs for Post-Construction Site Runoff Controls The permittee shall implement the following BMPs to meet the objectives of the Post- Construction Stormwater Management Program.

  • The N.C. Division of Energy, Mineral, and Land Resources Sediment and Erosion Control Program effectively meets the MEP standard for Construction Site Runoff Controls by permitting and controlling development activities disturbing one or more acres of land surface and those activities less than one acre that are part of a larger common plan of development as authorized under the Sediment Pollution Control Act of 1973 and Chapter 4 of Title 15A of the North Carolina Administrative Code.

  • The delegated Sediment and Erosion Control Program effectively meets the maximum extent practicable (MEP) standard for Construction Site Runoff Controls by permitting and controlling development activities disturbing one or more acres of land surface and those activities less than one acre that are part of a larger common plan of development as authorized under the Sediment Pollution Control Act of 1973 and Chapter 4 of Title 15A of the North Carolina Administrative Code.

  • Compliance with a delegated Sediment and Erosion Control Program effectively meets the maximum extent practicable (MEP) standard for Construction Site Runoff Controls by permitting and controlling development activities disturbing one or more acres of land surface and those activities less than one acre that are part of a larger common plan of development as authorized under the Sediment Pollution Control Act of 1973 and Chapter 4 of Title 15A of the North Carolina Administrative Code.

  • The delegated Sediment and Erosion Control Program effectively meets the MEP standard for Construction Site Runoff Controls by permitting and controlling development activities disturbing one or more acres of land surface and those activities less than one acre that are part of a larger common plan of development as authorized under the Sediment Pollution Control Act of 1973 and Chapter 4 of Title 15A of the North Carolina Administrative Code.

  • The New Hanover County Sediment and Erosion Control Program effectively meets the requirements of the Construction Site Runoff Controls by permitting and controlling development activities disturbing one or more acres of land surface and those activities less than one acre that are part of a larger common plan of development.

  • The Gaston County Sediment and Erosion Control Program effectively meets the maximum extent practicable (MEP) standard for Construction Site Runoff Controls by permitting and controlling development activities disturbing one or more acres of land surface and those activities less than one acre that are part of a larger common plan of development as authorized under the Sediment Pollution Control Act of 1973 and Chapter 4 of Title 15A of the North Carolina Administrative Code.

  • They are Public Education and Outreach, Public Involvement/Participation, Illicit Discharge Detection and Elimination, Construction Site Runoff Controls, Post-Construction Runoff Controls, and Pollution Prevention and Good Housekeeping for Municipal Operations.

  • The Wake County Sediment and Erosion Control Program effectively meets the maximum extent practicable (MEP) standard for Construction Site Runoff Controls by permitting and controlling development activities disturbing one or more acres of land surface and those activities less than one acre that are part of a larger common plan of development as authorized under the Sediment Pollution Control Act of 1973 and Chapter 4 of Title 15A of the North Carolina Administrative Code.

Related to Runoff Controls

  • Interim controls means a set of measures designed to temporarily reduce human exposure or likely exposure to lead-based paint hazards, including specialized cleaning, repairs, maintenance, painting, temporary containment, ongoing monitoring of lead-based paint hazards or potential hazards, and the establishment and operation of management and resident education programs.

  • Engineering controls means constructed containment barriers or systems that control one or more of the following: downward migration, infiltration, or seepage of surface runoff or rain; or natural leaching migration of contaminants through the subsurface over time. Examples include caps, engineered bottom barriers, immobilization processes, and vertical barriers.

  • Controls have meanings correlative thereto.)

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • Internal Controls for districts means processes designed and im- plemented by districts to provide reasonable assurance regarding the achievement of objectives in the following categories:

  • Institutional Controls or “ICs” shall mean Proprietary Controls and state or local laws, regulations, ordinances, zoning restrictions, or other governmental controls or notices that: (a) limit land, water, or other resource use to minimize the potential for human exposure to Waste Material at or in connection with the Site; (b) limit land, water, or other resource use to implement, ensure non-interference with, or ensure the protectiveness of the RA; and/or (c) provide information intended to modify or guide human behavior at or in connection with the Site.

  • Environmental Management System means an environmental management system or plan of management to address all environmental risks and to ensure compliance with all Environmental Laws and licences;

  • Environmental Management Plan or “EMP” means the environmental management plan for the Project, including any update thereto, incorporated in the IEE;

  • Runoff coefficient means the fraction of total rainfall that will appear at the conveyance as runoff.

  • Ocean Transportation Intermediaries (“OTI”) shall include an “ocean freight forwarder” and a “non-vessel operating carrier”;

  • System means the Public Employees Retirement System.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • internal waters means any navigable river or waterway within the State of California.

  • Export Controls means any and all applicable laws, rules or regulations controlling the export of any U.S. goods, technology or services, including, but not limited to, the Export Administration Act, the Arms Export Control Act, the Export Administration Regulations and the International Traffic in Arms Regulations, each as amended from time to time.

  • Structural pest control means a use requiring a license under Chapter 14 (commencing with Section 8500), Division 3, of the Business and Professions Code.

  • Nutrient management plan means a plan developed or approved by the Department of Conservation and Recreation that requires proper storage, treatment and management of poultry waste, including dry litter, and limits accumulation of excess nutrients in soils and leaching or discharge of nutrients into state waters.

  • Pest Management Plan and “PMP” means the Recipient’s plan dated December 13, 2010, which: (i) addresses the concerns relating to the Project risks associated with potential increases in the use of pesticides for agricultural production, intensification and diversification and controlling disease vector populations arising from irrigation schemes; (ii) sets forth mitigation and monitoring measures to be taken during Project implementation and operation to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels; (iii) recommends institutional measures to strengthen national capacities to implement the mitigation and monitoring measures; and (iv) as part of the implementation arrangements, identifies national agencies and other partners that could play a vital role in the success of the Project.

  • Proprietary Controls means easements or covenants running with the land that (a) limit land, water, or other resource use and/or provide access rights and (b) are created pursuant to common law or statutory law by an instrument that is recorded in the appropriate land records office.

  • Emission control system means the electronic engine management controller and any emission related component in the exhaust or evaporative system which supplies an input to or receives an output from this controller.

  • External Account is your account at another financial institution (i) to which you are transferring funds from your Eligible Transaction Account; or (ii) from which you are transferring funds to your Eligible Transaction Account.

  • Vapor control system means a system that prevents release to the atmosphere of gasoline vapors in excess of 80 milligrams per liter of gasoline loaded (4.7 grains per liter).

  • Environmental Management Framework or “EMF” means the framework adopted by the Recipient through its Ministry of Planning and Investment’s Decision No 116/QD-BKH dated January 22, 2010 and referred to in the paragraph 2 of Section I.C of Schedule 2 to this Agreement, which sets out the environmental protection measures in respect of the Project, as well as administrative and monitoring arrangements to ensue the implementation of said framework, as said Environmental Management Framework may be revised from time to time with the prior concurrence of the Association.

  • Direct Load Control means load reduction that is controlled directly by the Curtailment Service Provider’s market operations center or its agent, in response to PJM instructions.

  • Asset Management Plan means a plan created by the department and approved by the state transportation commission or a plan created by a local road agency and approved by the local road agency's governing body that includes provisions for asset inventory, performance goals, risk of failure analysis, anticipated revenues and expenses, performance outcomes, and coordination with other infrastructure owners.

  • Internal combustion engine or ‘engine’ means an energy converter, other than a gas turbine, designed to transform chemical energy (input) into mechanical energy (output) with an internal combustion process; it includes, where they have been installed, the emission control system and the communication interface (hardware and messages) between the engine's electronic control unit(s) and any other powertrain or non-road mobile machinery control unit necessary to comply with Chapters II and III;

  • Leak-detection system means a system capable of detecting the failure of either the primary or secondary containment structure or the presence of a release of hazardous waste or accumulated liquid in the secondary containment structure. Such a system must employ operational controls (e.g., daily visual inspections for releases into the secondary containment system of aboveground tanks) or consist of an interstitial monitoring device designed to detect continuously and automatically the failure of the primary or secondary containment structure or the presence of a release of hazardous waste into the secondary containment structure.