Phased Construction definition

Phased Construction. If the project contains multiple phases of construction, each phase shall be subject to the amount of liquidated damages per consecutive calendar day indicated in the paragraph above, if so noted below:

Examples of Phased Construction in a sentence

  • Phased Construction The Construction Manager shall make recommendations to the Owner and Architect regarding the phased issuance of Drawings and Specifications to facilitate phased construction of the Work, if such phased construction is appropriate for the Project, taking into consideration such factors as economies, time of performance, availability of labor and materials, and provisions for temporary facilities.

  • Xxxxx -2- April 12, 2021 FEDERAL FACILITY AGREEMENT MILESTONE EXTENSION REQUEST FOR ZONE 1 BALANCE OF ECOLOGICAL SOIL AREAS required to excavate the additional soil, perform the additional confirmation sampling, evaluate the confirmation sampling results, and document both the completion of the remedial actions and attainment of Ecological Remediation Levels in the Phased Construction Completion Report D1.

  • Phased Construction to preserve the option of a Modified Tier 5 MUNI Alignment.

  • Phased Construction of Selective Water Withdrawal and Downstream Fish Passage Facilities 17 Article 21.

  • Phased Construction Program and interface with adjacent projects.

  • In accordance with the Federal Facility Agreement for the Oak Ridge Reservation, Section XXX, Extensions, the U.S. Department of Energy requests your approval to extend the Appendix E milestone for the submission of the D1 Phased Construction Completion Report (PCCR) for the subject Y-12 National Security Complex (Y-12) facilities.

  • Construction of the ECCL facility as presented in the Conceptual Design work prepared by Nexus would not be possible within the constraints of the funds available through the 2014 completion target date, requiring a Phased Construction Approach coinciding with the release of bond funds sometime after 2014.

  • MUNI Project; Phased Construction to preserve the option of a Modified Tier 5 MUNI Alignment.

  • Phased Construction The utility extensions may be constructed and accepted in phases as specifically designated on the Plans and Specifications when all requirements have been met.

Related to Phased Construction

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the Project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the Project, and (ii) the cumulative payments made by the Developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Completion of Construction means the date, as determined by the Division after consultation with the Recipient, that the work of building and erection of the Project is substantially complete.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Commencement of Construction means the initial disturbance of soils associated with clearing, grading, or excavating activities or other construction activities.

  • Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.

  • Land disturbing construction activity means any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Contribution in aid of construction, as used in this subrule, means a nonrefundable cash payment grossed-up for the income tax effect of such revenue covering the costs of a distribution main extension or service line that are in excess of costs paid by the utility. The amount of tax shall be reduced by the present value of the tax benefits to be obtained by depreciating the property in determining the tax liability.

  • WTO GPA country construction material means a construction material that—

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • as constructed plans means as constructed plans as defined in the Building Code;

  • Environmentally constrained area means the following areas where the physical alteration of the land is in some way restricted, either through regulation, easement, deed restriction or ownership such as: wetlands, floodplains, threatened and endangered species sites or designated habitats, and parks and preserves. Habitats of endangered or threatened species are identified using the Department's Landscape Project as approved by the Department's Endangered and Nongame Species Program.

  • Foreign construction material means a construction material other than a domestic construction material.

  • Construction project means the same as that term is defined in Section 38-1a-102.