Outage Request System definition

Outage Request System. A system that is used to collect and capture all data associated with the requisition and completion of a planned utility outage.

Examples of Outage Request System in a sentence

  • Transmission Outage DataOn November 4, 2010, Entergy identified an outage on certain auto-transformers from 500 to 161 kV that was not modeled in the Operating and Planning Horizons for calculating AFCs. Upon further investigation, Entergy determined that this outage was not included in the list of outages provided by the Transmission Automated Outage Request System (TAORS).

  • The Requestor will submit a completed Outage Request form through the Outage Request System.

  • The Technical Investigator will complete and submit the Shop Response in the Outage Request System.

  • Transmission Outage DataOn November 29, 2011, SPP notified Entergy that the outage of the 500/115 kV transformer at El Dorado EHV Substation was listed in the Transmission Automated Outage Request System (TAORS), but the automated process used for modeling outages in RFCalc for the AFC process did not download this outage.

Related to Outage Request System

  • MERS(R) System The system of recording transfers of Mortgages electronically maintained by MERS.

  • Interconnection Request means a Generation Interconnection Request, a Transmission Interconnection Request and/or an IDR Transfer Agreement.

  • Outage has the meaning set forth in the CAISO Tariff.

  • Local Service Request (LSR means the form used to input orders to the Local Service Center (LSC) by CLEC, including, but not limited to orders to add, establish, change or disconnect services.

  • Generation Interconnection Request means a request by a Generation Interconnection Customer pursuant to Tariff, Part IV, subpart A, to interconnect a generating unit with the Transmission System or to increase the capacity of a generating unit interconnected with the Transmission System in the PJM Region.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Access Service Request (ASR means the industry standard form used by the Parties to add, establish, change or disconnect trunks for the purposes of Interconnection.

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.

  • Monitoring System means a system established by BNY to fulfill the Responsibilities specified in clauses (d) and (e) of Section 1 of Article III of this Agreement.

  • Delivery System means the design and construction

  • Automated data acquisition and handling system or "DAHS" means that component of the continuous emission monitoring system, or other emissions monitoring system approved for use under section 11 of this rule, designed to interpret and convert individual output signals from pollutant concentration monitors, flow monitors, diluent gas monitors, and other component parts of the monitoring system to produce a continuous record of the measured parameters in the measurement units required by section 11 of this rule.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Interconnection Customer means a Generation Interconnection Customer and/or a Transmission Interconnection Customer.

  • Alarm system means equipment and devices assembled for the purpose of:

  • Busy Line Verification (BLV) means a service whereby an End User requests an operator to confirm the busy status of a line.

  • Access Service Request (ASR) is an industry standard form used by the Parties to add, establish, change or disconnect trunks for the purposes of Interconnection.

  • Billing System means a system to issue Invoices relating to charges payable by each party under an Access Agreement;

  • Electronic Subcontracting Reporting System (eSRS) means the Governmentwide, electronic, web-based system for small business subcontracting program reporting. The eSRS is located at http://www.esrs.gov.

  • Transmission Interconnection Customer means an entity that submits an Interconnection Request to interconnect or add Merchant Transmission Facilities to the Transmission System or to increase the capacity of Merchant Transmission Facilities interconnected with the Transmission System in the PJM Region or an entity that submits an Upgrade Request for Merchant Network Upgrades (including accelerating the construction of any transmission enhancement or expansion, other than Merchant Transmission Facilities, that is included in the Regional Transmission Expansion Plan prepared pursuant to Operating Agreement, Schedule 6).

  • Emergency Downtime means downtime during critical patch deployment and critical operating system upgrades as described in the Supplement.

  • Carrier Access Billing System (“CABS”) is the system which is defined in a document prepared under the direction of the Billing Committee of the OBF. The CABS document is published by Telcordia in Volumes 1, 1A, 2, 3, 3A, 4 and 5 as Special Reports SR-OPT-001868, SR-OPT-0011869, SR-OPT-001871, SR-OPT- 001872, SR-OPT-001873, SR-OPT-001874, and SR-OPT-001875, respectively, and contains the recommended guidelines for the billing of access and other connectivity services. Sprint’s carrier access billing system is its Carrier Access Support System (CASS). CASS mirrors the requirements of CABS.

  • Maintenance Outage means NERC Event Type MO, as set forth in attached Exhibit B, and includes any outage involving ten percent (10%) of the Facility’s Net Output that is not a Forced Outage or a Planned Outage.

  • Interconnection Provider means PacifiCorp Transmission.

  • Service Request means a request for service such as adds, moves, changes and technical assistance;

  • smart metering system means an electronic system that can measure energy consumption, providing more information than a conventional meter, and can transmit and receive data for information, monitoring and control purposes, using a form of electronic communication;