C.4.4 Other Project AlternativesC.4.4.1 Desert Southwest Transmission Project AlternativeDescriptionOverview: This alternative would replace an approximately 118-mile long segment of the DPV2 Project between the Midpoint Substation (southwest of Blythe) and Devers Substation.
SCE requested that the CPUC authorize SCE to construct DPV2 facili‐ ties in only the California portion of DPV2 and the Midpoint Substation near Blythe, California.
The CPUC’s approval of SCE’s Petition for Modification (PFM) to build the California portion of DPV2 includes two major transmission lines and construction of the new Midpoint Substation, now called the Colorado River Substation.The first transmission line will be a 500 kilovolt (kV) transmission line between the new Colorado River Substation near Blythe, California (just west of the California‐Arizona border), and SCE’s Devers Substa‐ tion in North Palm Springs in Riverside County, California.
Construction of the Midpoint Substation was not authorized in the original CPUC Decision D.07‐01‐040 in January 2007.
DPV2 will provide resource reliability benefits, flexibility in operating California’s transmission grid, and additional import capacity that may be urgently needed during a major outage or emergency event or during periods of unanticipated high energy demand.The following revisions to the original 1989 project were proposed in the 2005 PEA (CPUC, 2005): Construction of the Midpoint Substation SCE received an interconnection request from Desert Southwest Power, LLC, the proponent of the DSWTP.
The joint project would include the construction of a 500 kV switchyard called the Midpoint Substation that would provide connections for the DPV1 and Devers-Harquahala 500 kV lines, and the DSWTP.
The DPV2 Midpoint Substation would have also been adjacent to the DPV2 corridor to the north, but it would have been approximately 5 miles southeast of the Midpoint‐DSW Substation site.
As a result, the solar developers and SCE developed a plan to expand the Midpoint Substation, now known as the Colorado River Substation, from 45 acres to 90 acres to allow for the required space for generation tie lines to be interconnected with the SCE 500 kV transmission system.
In order to evaluate the performance of our PIAA method on the AADB database, we use 22 workers and their rated images as the testing set, and the remaining 168 workers and the labeled images as the training set.
The project modification resulted in a revised construction plan, which expanded the Midpoint Substation and has since been renamed as the Colorado River Substation (CRS).