Coal preparation plant associated areas definition

Coal preparation plant associated areas means the coal preparation plant yards, immediate access roads, coal refuse piles, and coal storage piles and facilities.
Coal preparation plant associated areas means the coal preparation plant yards, immediate
Coal preparation plant associated areas means the coal preparation plant yards, immediate access roads, coal refuse piles,

Related to Coal preparation plant associated areas

  • Coal preparation plant means a facility where coal is crushed, screened, sized, cleaned, dried, or otherwise prepared and loaded for transit to a consuming facility. “Coal preparation plant associated areas” means the coal preparation plant yards, immediate access roads, coal refuse piles, and coal storage piles and facilities. “Coal preparation plant water circuit means all pipes, channels, basins, tanks, and all other structures and equipment that convey, contain, treat, or process any water that is used in coal preparation processes within a coal preparation plant.

  • Tourism destination project means a qualified non-gaming

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Development Area means that area to which a development plan is applicable.

  • associated facilities means all associated track structures, over and under track structures, supports (including supports for equipment or items associated with the use of the Network), tunnels, bridges, train control systems, signalling systems, communication systems and associated plant, machinery and equipment from time to time but only to the extent that such assets are related to or connected with the Network but does not include any sidings or yards;

  • Municipal Separate Storm Sewer System Management Program means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations, and this article and its attendant regulations, using management practices, control techniques, and system, design, and engineering methods, and such other provisions that are appropriate.

  • Production Area means that part of the animal feeding operation that includes the animal confinement area, the manure storage area, the raw materials storage area, and the waste containment areas. The animal confinement area includes, but is not limited to, open lots, housed lots, feedlots, confinement houses, stall barns, free stall barns, milkrooms, milking centers, egg washing or egg processing areas, areas used for the storage and disposal/treatment of mortalities, cowyards, barnyards, medication pens, walkers, animal walkways, and stables. The manure storage area includes, but is not limited to, lagoons, runoff ponds, storage sheds, stockpiles, under-house or pit storages, liquid impoundments, static piles, and composting piles. The raw materials storage area includes, but is not limited to, feed silos, and silage bunkers. The waste containment area includes, but is not limited to, settling basins and areas within berms and diversions which separate uncontaminated stormwater.

  • Outdoor cultivation means the cultivation of mature cannabis without the use of artificial lighting or light deprivation in the canopy area at any point in time. Artificial lighting is permissible only to maintain immature plants outside the canopy area.

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Redevelopment Area means the community redevelopment area described, defined or otherwise identified or referred to in the Redevelopment Plan.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • ILUA Area means the geographical area in relation to which the Framework ILUA applies, as specified in Schedule 2 of the Framework ILUA;

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Project site, where applicable, means the place indicated in bidding documents.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Municipal separate storm sewer system (MS4 means a conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, man-made channels, or storm drains):

  • Large municipal separate storm sewer system means all municipal separate storm sewers that are either:

  • Working pressure means the settled pressure of a compressed gas at a reference temperature of 15 °C in a full pressure receptacle;

  • Municipal separate storm sewer system means a conveyance or system of conveyances including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels, or storm drains.

  • Building Services Definitions

  • Project Site(s) means the place(s) specified in the SCC for the supply and installation of the System.

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • Radiation area means any area, accessible to individuals, in which radiation levels could result in an individual receiving a dose equivalent in excess of 0.05 mSv (0.005 rem) in 1 hour at 30 centimeters from the source of radiation or from any surface that the radiation penetrates.